圍堤 的英文怎麼說

中文拼音 [wéi]
圍堤 英文
border dike
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : 堤形容詞[書面語] (水清見底的樣子) (of water) clear
  1. The gypsum slurry is pumped into a diked area.

    我們用泵將石膏料漿打到一塊用起來的空地中。
  2. Should consider construction of breakwater at hebe haven, tai tam and plover cove to allow the use of these gulfs for recreation and sporting

    應在白沙灣、大潭、船灣等地點興建防波,在防波作康樂及運動用途。
  3. Report on technique for enhancement of mullet

    港灣圍堤養梭魚發展休閑漁業
  4. Boats going over the overflow weirs ; access when water levels fluctuate leaving steep banks

    如何在水位下降而岸外露情況下,仍可安全進出水塘范
  5. Settlement observation and back analysis for the second stage polder dike project of zhapu port

    乍浦港二期圍堤工程沉降觀測與反分析
  6. The analysis indicates that the recovering rate of the salt marshes is related to the residual salt marshes area outside the seawall

    分析表明鹽沼恢復的速度與墾以後海外側予留的鹽沼面積有關。
  7. Because of the fact that they are largely surrounded by a sea wall, they are particularly vulnerable to pollution from vessels using them and from the shore

    避風塘三面被海,潮汐漲退沖刷能力低,特別容易受岸邊和灣內船隻的污染物影響。
  8. They have laid siege to antioch.

    他們包了安阿。
  9. In this it has its inimitable virtue. ( 4 ) analysed the asymmetry settlement and thereout the crack because of excavating coal undergroundly oh huxi bank., then ascertained the magnitude of settlement and the distributing of the crack

    ( 4 )對湖西大姚橋礦段由於地下採煤而引起的不均勻沉降以及由此產生的裂縫進行了數值分析,確定了沉降的大小以及裂縫分佈的范
  10. Mathematical model is used to calculate and analyze water line in case of 9 kinds of flood flow levels respectively in reservoir. there are two programs including with enclose tideland for cultivation and without it in every flow level

    利用數學模型分別對9個洪水流量級進行了水庫沿程水面線計算分析,每個流量級分有和沒有兩個方案。
  11. This dissertation ' s problem just comes from this engineering background exactly. for this two kinds of cores, which were taken from the engineering place, this dissertation draws sample by computer and analyses the weight distributions, getting the weight curves, the middle weights, asymmetry coefficients and other physics characteristic indexes of them, and makes up the model samples which are similar to the factual weight distributions

    本文對施工現場採用的10 100kg和1 800kg重量范心石進行了隨機抽樣和重量級配分析,得到了描述這兩種心石類別的重量級配曲線、中值重量、不均勻系數等物理特性指標,並由此制備重量級配相似的模型樣本。
  12. Seawall and sluice are the parts constructed in advance, while final closure is the last part in construction. the hydraulic condition during the final closure process is worse than that during any other processes. and with the compressing of the entrance, the hydraulic condition becomes badly, the drop height of entrance can reach 2 to 3 meter, the maximum velocity of flow even reaches 6 to 8 meter per second and flow condition also becomes complex

    和水閘的修建都是海工程先期施工的部分,堵口則是海修築的最後階段,堵口合龍成敗關繫到海工程成敗,由於此階段所遇到的水力條件十分惡劣,口門落差可達2 3m ,流速最大可達到6 8m / s ,且水流極其復雜,根據我國《海工程技術規范》規定海堵口必須進行龍口水力計算。
  13. From time to time there are reports of freak waves washing people into the sea, and the city government has erected a fence and posted signs strictly prohibiting fishing. but the fish are so abundant here that at almost any hour of night or day you can find large numbers of people on the breakwater ignoring the ban

    雖然此處瘋狗浪噬人的消息時有所聞,市政府也在防外加了籬與標語,嚴禁垂釣,但因此地漁場資源豐富,長長防波上幾乎二十四小時都可見到大批違規釣客。
  14. It is a wooden tripod with rods between the supports

    常用於截流、防洪、調劑水量,圍堤搶險等。
  15. ( 3 ) the calculations tell us that the enclose tideland for cultivation dyke effect directly flood drainage, engineering safety and efficiency development in reservoir. so the management of reservoir should be strengthened, the spirit of clearing barriers given by superior should be carried out, clearing barriers in reservoir, especially the enclose dam in west river mouth

    ( 3 )從計算的結果可知,由於水庫庫區圍堤,直接影響到水庫的正常行洪、工程的安全及效益的發揮,應加大水庫的管理力度,貫徹落實上級有關水庫清障的精神,清除庫區障礙物,特別是西河口的壩。
  16. If it is really necessary to stuff or block up or demolish them, consent should be obtained from the water conservancy administrative department and the case be reported to the people ' s government of the city for approval

    城市建設不得擅自填堵原有河道溝叉、貯水湖塘窪淀和廢除原有防洪圍堤;確需填堵或者廢除的,應當經水行政主管部門審查同意,並報城市人民政府批準。
  17. The whole process of breakwater riprapping construction was monitored by the prototype monitoring device buried in the sand soft nappe

    摘要通過埋設在砂肋軟體排上的原形觀測儀器,對防浪圍堤拋石施工過程進行了全程監測。
  18. Besides the works mentioned above the tests of many kinds of sea dikes in zhejiang province have also been done according to the test results an optinal sea dike structure has been proposed

    秦山核電三期工程是國家「九五」重點項目,近年來進行過廠坪標高確定、圍堤和護岸選型及消浪效果試驗研究,成果已通過專家評審鑒定。
  19. Wave resistance of shore border dike at the container pier of ningbo port

    寧波港集裝箱碼頭陸域圍堤抗浪性能研究
  20. Measures of protection to dalangdian reservoir embankment

    大浪淀水庫圍堤防護措施
分享友人