坂下 的英文怎麼說

中文拼音 [xià]
坂下 英文
sakashika
  • : 名詞[書面語] (山坡; 斜坡) hill slope
  • : 下動詞1. (用在動詞后,表示由高處到低處) 2. (用在動詞后, 表示有空間, 能容納) 3. (用在動詞后, 表示動作的完成或結果)
  1. Geological characteristics and ore prospecting orientation of lead zinc polymetallic deposit in south dabaoshan, guangdong

    金礦床地質特徵及找礦預測
  2. Cross the intersection from hachiko exit of jr or subway, walk straight on dogenzaka. take right at dogenzakaue kobanmae

    在jr和各地鐵以及私營鐵路澀谷站車,沿道玄向圓山町方面行進。
  3. In the light of tectonic evolution stage and metallogenesis, these metallogenic system ( assemblage ) could be classified as follows : ( 1 ) the pre - divergent metallogenic system in the southwest margin of north china paleocontinent in the archean - meso proterozoic : dongdashan iron, jinchuan nickel - copper. ( 2 ) the divergent metallogenic system in the northern margin of the qaidam paleoplate in the middle - late proterozoic : huashugou - liugouxia iron. ( 3 ) the metallogenic system in the active margin in the early paleozoic : the metallogenic assemblage in the island arc - rift in the early stage ( baiyinchang - qingshuigou copper - polymetallic ) ; the metallogenic assemblage in island arc in the middle - late stage ( honggou - jiaolongzhang copper - polymetallic ) ; the back - arc extensional basin ( zhuzhuiyaba - jiugequan - shijuli copper ) ; the metallogenic assemblage in connection with subduction and magmatic - hydatogenesis ( taergou - xiaoliugou wolfram ; huashugou - liugouxia copper ; dadonggou - diaodaban lead - zinc ) ; the metallogenic assemblage is related to the oceanic crustal shards ( dadaoerji chromite ; yushigou chromite ). ( 4 ) the metallogenic system has something to do with collision - type orogeny : the metallogenic assemblage in foreland basin ( tianlu copper ) ; the metallogenic assemblage with the intracontinental orogeny and ductile shear ( hanshan - yingzhuishan gold )

    根據構造發展階段和成礦作用特點,確定本區成礦系統及組合如: ( 1 )華北板塊西南邊緣太古宙中元古代裂解期前成礦系統:東大山鐵成礦組合,金川鎳銅成礦組合; ( 2 )柴達木板塊北緣中、新元古代裂解成礦系統:樺樹溝柳溝峽鐵成礦組合; ( 3 )加里東期活動大陸邊緣成礦系統:早期島弧裂谷成礦組合(白銀廠清水溝銅及多金屬成礦組合) ,中、晚期島弧成礦組合(紅溝蛟龍掌銅及多金屬成礦組合) ,弧后擴張盆地成礦組合(豬咀啞巴九個泉石居里銅及多金屬成礦組合) ,與俯沖作用有關的巖漿熱液成礦組合(塔爾溝小柳溝鎢成礦組合,樺樹溝柳溝峽銅成礦組合,大東溝吊大鉛鋅成礦組合) ,洋殼殘片成礦組合(大道爾吉鉻成礦組合,玉石溝鉻成礦組合) ; ( 4 )碰撞造山成礦系統:前陸盆地成礦組合(天鹿銅成礦組合) ,陸內造山韌性剪切成礦組合(寒山鷹咀山金成礦組合) 。
  4. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析地水利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是壩體高度的近兩倍左右,壩基的滲流和液化成為壩體安全主要問題,本文對該壩的三種設計方案即水平鋪層防滲方案、粘土心墻防滲方案及瀝青心墻防滲方案的靜態應力位移及壩體在竣工期、蓄水期等各個階段可能產生的破壞進行了認真研究。
  5. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,心墻和壩基防滲墻的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲墻與壩體防滲體銜接形式及工程實際應用效果,為地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心墻和壩基垂直防滲方案、瀝青混凝土心墻和壩基垂直防滲方案以及粘土斜心墻和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲墻的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲墻不同彈性模量對墻體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲墻與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  6. Jr, subways or other lines shibuya, from east exit, along miyamasuzaka, about 10minutes walk. or the tokyo metro ginza line, hanzomon line and chiyoda line omote - sando b2 exit, about 8 minutes walk. an lush park in the middle of the city

    在jr和各地鐵以及私營鐵路澀谷站車,由東口沿宮益步行10分鐘;或者由東京地鐵銀座線、半藏門線、千代田線的表參道站b2出口步行8分鐘
  7. In front of exit b of akasaka - mitsuke sta. on the tokyo metro ginza marunouchi lines

    東京地鐵銀座線?丸之內線赤見附站地通道b出口正面
  8. The red sox made big news recently when they placed a bid of $ 51. 1 million for the rights to negotiate with the star pitcher from japan, daisuke matsuzaka

    紅襪隊最近則以5110萬標日本明星投手鬆大輔的議約權,而製造出相當大的新聞。
  9. There is tremendous pressure on the red sox to sign matsuzaka, particularly now that the yankees have gained the rights to have a star pitcher from japan on their staff

    紅襪現在承受了極大的壓力得簽,特別是洋基現在已經贏得另一位日本明星投手的議約權
  10. A case of boston not signing matsuzaka and new york signing igawa would give the yankees a tremendous upper hand in japan in terms of both marketing dollars and future deals with players

    當紅襪不簽松,而洋基又簽井川的情形發生,會讓洋基在日本市場的收入以及未來在日本交易球員這兩件事上極?上風。
分享友人