坑道工程 的英文怎麼說
中文拼音 [kēngdàogōngchéng]
坑道工程
英文
trench works- 道 : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
- 工 : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
- 程 : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
- 坑道 : 1 [采礦工程] (井筒、平峒和巷道的統稱) gallery; adit; mine2 [軍事] (地下工事; 地下通道) (unde...
-
Chengdu longquan reixing engineering materials plant set product development, manufacturing and marketing its products and services into one, through the introduction, absorption, development and production of innovative self - drilling bolt grouting hollow products and exclusive ancillary machinery widely used in underground engineering ( traffic tunnel, hydraulic tunnels, mine roadway road and the various uses of anchorage support ) geotechnical engineering ( slope, dike rocks, the deep excavation anchorage support ) repair reinforcement project ( tunnels, dikes, dams, housing construction )
成都龍泉瑞鑫工程材料廠集產品開發、生產製造及產品銷售與服務於一體,通過引進、吸收、開發、創新生產的自鉆式中空注漿錨桿系列產品及專用配套機械廣泛應用於地下工程(交通隧道,水工隧道,礦山巷道和各類用途的錨固支護)巖土工程(邊坡,堤巖,深基坑的錨固支護)修復加固工程(隧道,海堤,大壩,房屋建築) 。In order to explore harness scheme, layout, measurements and parameters concerned of the project, which are appropriate for the characteristic and the evolvement law of the watercourse of ningxia section of the yellow river, the study on the experiment of the scoured pit of the dam buttress and runoff of the root rock of ningxia section of the yellow river is of important theoretical meaning and practicable value
河道床質也不相同,仁存渡以上河段為沙卵石,以下河段為沙質。為了探索適宜黃河寧夏段河道特性和演變規律的整治方案、工程布局、工程措施及有關參數,開展黃河寧夏段河道壩垛沖刷坑和根石走失試驗研究,具有十分重要的理論意義和實用價值。During the construction of concrete cut - off wall of the auxiliary dam in huangbizhuang reservoir, in the section with complex geographical condition, especially the closure section of concrete cut - off wall ( about 120m ), the deterioration of the underground water ' s flow state and the existence of the overseep channel in the stratum result in the several collapses in the dam crest. through the analysis of ever } 1 collapse ' s reason, the proposal of handling measure and its effect, the paper expounds and proves that the cut - off wall can be safely constructed and devoted into normal usage after dealing with collapse. the psper improves the construction technique and method of concrete cut - off wall especially under complex geological condition and in the overseep stratum
本文通過對歷次塌坑的原因分析及歷次塌坑處理措施的提出和對歷次塌坑處理效果的分析,論證了塌坑處理後防滲墻能安全施工和投入正常運用;完善了在復雜地質條件及強滲漏地層混凝土防滲墻的施工工藝和施工方法;提出了對病險水庫加固及在地質條件復雜地層中修建混凝土防滲墻的施工要點;同時提出了在強滲漏地層修建防滲墻的關鍵是在防滲墻施工前通過預注漿封閉強滲漏通道的重要論點;對塌坑一些處理措施中的不足之處亦進行了分析研究,供國內類似工程借鑒。At last, the law of deformation of pit bottom and surrounding surface in different stress state and in different excavating step is obtained, and the same to the saturatin g process of surrounding soil. to some extent, in predicting the deformation of surrounding soil and retaining structure in construction, in preventing the foundation pit accident from happening, in insuring the security of environment and regular use of pipes underground, and in giving advice to deep loess foundation pit engineering in practice, the conclusion is of theoretical and practical value
得出了不同應力狀態下和不同開挖步驟時以及基坑周圍土浸濕過程中黃土深基坑坑底及基坑周圍地表的變形規律,所獲得的結論對于黃土深基坑施工過程中周圍土層及圍護結構的變形預測,防止黃土深基坑事故的發生及周圍環境的安全與地下管道的正常使用,指導黃土深基坑工程的實踐具有一定的理論和實踐參考價值。The project involves trench excavation, construction of cable trough, cable laying, backfilling and reinstatement works and landscaping works
工程包括坑道挖掘、興建混凝土電纜槽、電纜鋪設、回填和修復工程、和景觀美化工程。Exploitation and integrative application for underground space are the theme of city construction in this century. the study for design and new construction of underground engineering including foundation pit, metro, tunnel etc. has become pop and difficult problem with the rapid development of old city rebuilding and municipal works, as well as the increase of high - rise building
地下空間的開發和綜合利用是本世紀城市建設的主題,隨著城市舊城改造、和現代市政設施建設事業的迅猛發展,以及高層建築的興起,建築基坑工程、地鐵隧道工程等地下工程的設計和施工新理論新技術的研究成為當今工程界的熱點和難點。Rock bolts for mining and tunnelling ; terms
采礦和坑道掘進工程用錨桿.術語The products are the raw material of polyurethane elastomer, coating and adhesives, which react with isocyanate to give a chemical grouting material that has been widely used for seepage - proofing and blocking up the loophole of tunnel, dam, underground projects and mine - pits, as well as foundation reinforcement
本類產品為聚氨酯彈性體、塗料、粘結劑的原料,與異氰酸酯反應制得的化學灌漿材料,廣泛用於隧道、水壩、地下工程、礦坑層面的防水堵漏及建築物的地基加固。For different kinds of underground space, such as ordinary basement, metro, forepast civil air defence, old tunnel, antiquated mine, underground common ditch, the design method for their reinforcement and reconstruction and the foundation of inner function dividing are discussed
針對普通地下室、地鐵、早期人防工程、舊坑道、廢棄礦井、地下共同溝等各種型式的地下空間,文章討論了不同的加固改造設計方法以及內部功能的劃分依據。The pile building enclosure with two or three bracing pieces and the gravity retaining wall are particularized as example in this paper. from the antithesis with datum practically measured, it indicates that the fem which is adopt by this paper is logical and feasible
本文分別對兩道和三道支撐的樁(墻)式圍護結構及重力式擋墻圍護結構基坑工程進行了有限元模擬計算,根據與實際監測資料的對比分析,表明本文所採用有限元方法是合理可行的。During the above works period, affected motorists on blue pool road westbound heading for
在上述工程期間,沿藍塘道西行前往大坑道東行的受影響駕駛人士,須改經At the same time, the uniqueness of the back - analyzed parameters is discussed. correctness and suitability are proved by the comparison the calculated with observed results through the practical foundation pit projects with different retaining structures
通過對不同支護形式(無支撐、單道支撐、多道支撐)的實際基坑工程的計算與廣東工業大學工學碩士學位論文監測結果的比較,驗證了本文方法的正確性和適應性。Kcrc will adopt robust measures to mitigate the noise impact. these will include stringent contractual requirements for use of the quietest equipment available, confining noisy works to daytime, dividing the site into small work zones, not allowing noisy equipment to work at the same time in adjacent zones and installing decking under which noisy work can be shielded from the public
這些措施包括:于合約內嚴格規定承建商使用最寧靜的機器進行工程;限制高噪音工程只能于日間進行;把工地劃分成多個小區;規定高噪音機器不可於相連的小區同時使用;以及在坑道上蓋上鐵板,以阻隔噪音。The paper discussed the application of seismic - refraction on tunnel geologic engineering in detail through the practical problems in engineering geology exploration of jikeng tunnel in funing highway, fujan province
摘要本文通過福建省福寧高速公路磯坑隧道工程地質勘察中的實際問題,詳細討論了地震折射波法在隧道地質工程中的應用。The deep foundation excavatfon takes many methods of enclosure in city construction, today there are some immature experiences and lots of teaches on the prediction, prevetion and the control of environmental detrimental effects ( mainly uneven soil set outside foundation pit and effect on cityscape traffic, etc
城市建設中的深基坑開挖採用多種圍護形式,施工產生的環境病害(主要是坑外附近地表土層不均勻沉降及工程施工對道路交通的干擾)預測及防治已有一些經驗,但教訓也不少。Design and construction of deep foundation pit supporting engineering of underpass tunnel
下穿通道深基坑支護工程的設計與施工分享友人