坡樁 的英文怎麼說

中文拼音 [zhuāng]
坡樁 英文
slope stake
  • : Ⅰ名詞(地面傾斜的地方) slope Ⅱ形容詞(傾斜) sloping; slanting
  • : Ⅰ名詞(樁子) pile; pole; stake Ⅱ量詞(用於事情)
  1. The comprehensive treatment project of lin jia ya slide el consists of whittling slope, anti - slide pile with anchoring cable, retaining wall, building ground drainages, level ing off and calking slope, vegetation protection etc. after managing, under the action of earthquake load and watery the stability coefficient of slide is up to 1

    林家崖號滑的綜合治理方案是由削方、錨索抗滑、護擋墻、地表排水、整填縫、生物防護等多種工程措施優化組合而成。治理后,在飽水有地震荷載狀態下滑的安全儲備系數為1 . 10 。
  2. The chair chuffed slowly up the incline, rocking and jolting on the frozen clods. and suddenly, on the left, came a clearing where there was nothing but a ravel of dead bracken, a thin and spindly sapling leaning here and there, big sawn stumps, showing their tops and their grasping roots, lifeless. and patches of blackness where the woodmen had burned the brushwood and rubbish

    小車子饅慢地駛上斜,在冰陳了的泥塊上顛簸著前進,忽然左邊現出一塊空地,是兒只有一叢枯稿了的蕨草,四下雜布著一些斜傾的細長的小樹,幾根鋸斷了的大樹,毫無生氣地露著頂和根還有幾處烏黑的地方,那是樵夫們焚燒樹枝亂草和廢物過后的痕跡。
  3. Landslide is a geological hazard with serious losses. it is very important to research the controling methods. slide - resistant pile, which has many advantages such as high adaptability, little interference to landslide and geological environment, short construction time, high silde resistance, is a main method to control landslide. pneumatic down - the - hole hammer is a drilling method with many advantages. its features, such as wide application range, high hole quality, no circulating medium, low operation regulations, and drilling big diameter rock hole, fit to construct slide - resistant pile. according to the requirement of silde - resistant pile construction, this paper analyses feasibility that pneumatic dth hammer drilling applies to construct slide - resistant pile on the basis of introducing the features of pneumatic dth hammer. then an applied example is given

    是一種危害極大的地質災害,它的整治方法研究具有重要意義.抗滑是一種適應性強、對滑穩定性和地質環境干擾小、工期短、抗滑能力強的滑整治方法.風動潛孔錘鉆進是一種具有許多優點的鉆進方法,它的許多特點,如成孔質量高、應用范圍廣、無液體循環介質、鉆進規程參數小、可實現大直徑基巖鉆孔等都適合於抗滑施工.文章在介紹風動潛孔錘鉆進特點的基礎上,根據抗滑施工要求,分析了風動潛孔錘用於抗滑施工的可行性,並舉出了其應用實例
  4. The results of field observation showed that mucky clay in the shore slope of the wharfs was the stratum with the most obvious horizontal displacement and most of the pile heads close to the retaining walls inclined towards the land to different degrees, agreeing well with the inclination of pile heads as observed on site

    原型觀測結果表明:碼頭岸內的淤泥質粘土層為水平位移最明顯土層,靠近擋土墻的大部分頂都出現了不同程度的向陸側傾斜,這與實際見到的端傾斜狀況完全相符。
  5. Basic theorems and simplification for shakedown analysis of frame structure

    阻滑加固土穩定性分析的上限解法
  6. As a little girl she had long wished to dwell in a meadow, tending a goat, because one day on the talus of the fortifications she had seen a goat bleating at the end of its tether

    小時候,她就期望著與一隻山羊生活在一片草地上,因為有一天,她在城堡的斜上,看見一隻山羊拴在一根木上,在咩咩叫著。
  7. A i med at the badu ( k343 ) i arge seale i andslide in the nankun railway, geophysical exploration techniques such as seismic reflection of high resolution and geological radar are appi ied to detect the geologic characteristics of the landslide mass including 3d - conformation, perimeter, geometric parameters, si ippage pattern and distribution of displacement field in this dissertation. besides, acoustic method is used for detection of the former anti - slide piles and potency losing causations of the piles are analyzed and the sound geological conditions for upgrade of the piles are ascertained by the above investigations

    本文針對南昆鐵路八渡( k343 )大型滑,運用高解析度反射地震、地質雷達等地球物理探測技術對滑體地質進行了詳細的勘測,揭示了八渡滑體的空間形態、邊界與幾何參數、滑動方式以及位移場分佈特徵;同時,利用聲波探測對原抗滑進行了檢測,分析了失效原因,並查清了擬建抗滑地段的地質條件。
  8. " prestress anchor ribbed beam support system " is a new practical support technology which came from soil nailing walls system and un - embedded rank of piles with anchors support system that has been used successfully for 4 years by the author and his company named qingdao deep foundation stabilization engineering co., ltd. it " s mechanism is similar to rank of piles with anchors support system that can not be inserted into the bottom of foundation trench, but it " s ribbed beams are used to replace rank of piles made before excavation so the work cycle can be shortened and the support system cost can be reduced ; meanwhile this system maintains the soil nailing wall " s convenience of digging and supporting

    「預應力錨桿肋梁支護技術」是筆者及所在單位歷時四年在土釘墻和無嵌入多錨排兩種支護體系基礎上開發應用成功的一種新型實用性支護技術。其支護機理類似於未嵌入坑底的排多錨支護,只是由肋梁代替了開挖前施工的排從而提前工期並降低支護造價;同時繼承了土釘墻隨挖隨支護的機動靈活性。自1998年至今該技術已在青島、濟南、煙臺等十幾個深基坑和高邊工程中成功應用。
  9. Application of micro - piles in control of bank caves due to landslip of loess slope in three gorge reservoir area

    微型在三峽庫區黃土區塌岸防治工程中的應用
  10. A model for calculation of internal force of micropile system to reinforce bedding rock slope

    微型體系加固順層巖質邊的內力計算模式
  11. Gpr is a newly developed hi - tech survey technique used to detect shallow ground electric differences. we applied gpr to more than 100 projects in zhujiang river delta and hongkong, and obtained good reputations. the application scope involves stratigraphics division, outining of filled stones in the muddly beach, geotechnical prospecting of old wall, karst detecting in the limestone terrain, caving detecting, landslide and slop surveing, the division of wea - thering zone, onion weathering zone, fracture zone and fau - lted zone in the granite area, detecting of buried objects cable, metal nonmetal pipe, channel, air raid she - lter etc. underground in the urban city, archaeology, tracing of orebody, coal measures strata division, testing of the dam and grouting site, quality checking of the surface and foundation of the highway

    的一種高新技術。我公司運用世界最先進的探地雷達設備在珠江三角洲地區和香港開展了百余項探地雷達檢測項目,獲得了良好的聲譽,並被作為深圳市建設局1998年度建設科技成果推廣項目。它主要應用於:山體土石方檢測路基不同回填物界面檢測填海回填物巖溶檢測基無損檢測地下管道探測地下隱蔽物探測考古斜滑體探測地質結構探測湖底探測高速公路路面及路基檢測。
  12. We conclude that the conjunction intensity between the platform and piles has a prominent impact on the deformation on the surface and there exists the " curtain effect " of the pile that weakens the slide tendency to the sea. it is confirmed the most disadvantageous load cases

    通過數值模擬得到以下結論,承臺與頂連結對碼頭頂面的側向位移影響顯著;存在的「遮簾作用」 ,它在一定程度上弱化了岸土體向海方向的位移趨勢;確定出對碼頭穩定性最不利的工況荷載組合。
  13. The studied factors respectively are : length of soil nailing, insert deepness of piles, friction force of soil nailing interface, declination angle of soil nailing, horizontal spacing of soil nailing, rows of soil nailing, unit weight of soil, friction angle, unit cohesion, overload of slope, diameter of soil nailing

    這11個因素分別為:土釘(錨管)長度、土釘直徑、土釘界面摩擦力、土釘下傾角、土釘水平間距、土釘排數、土體重度、內摩擦角、粘聚力、頂超載、板插入深度。
  14. The authr has wosed back caiculation methd ha could calculate the safety fader of slope of sevetal rows root piles

    根據反分析的基本原理,提出了反演算法計算對于多排樹根加固邊后邊的安全系數。
  15. The pile - anchor retaining structure system is often used in chongqing area. for a long time, there is a conception about the transfer approach of soil pressure behind the pile - anchor retaining structure system that the pressure is applied on the holding sheet firstly, then transferred to the columns by the sheet, finally transferred to the form ground by the anchor

    錨支擋結構體系是重慶地區經常採用邊支護形式之一,長期以來,人們認為錨支擋結構體系的傳力途徑是:土壓力先作用於擋板上,通過擋板再傳到兩邊立柱,然後再通過錨桿把力傳遞給穩定地層。
  16. By direct shear for and normal triaxial shear tests of non - saturated desert sand, the parper studied the effect of water content and dry density on the strength of the non - saturated desert sand, and set up the code of this sand. based on the plane strain test of non - saturated desert sand slope, the paper analysed the destruction way of the excavaion side during the construction by means of adding water, and brough forward a formule that calculates the allowable of excavation and pile hole

    通過非飽和沙漠砂直剪試驗和常規三軸剪切試驗,研究了含水量和干密度對非飽和砂強度的影響,建立了這種砂的強度準則。通過非飽和沙漠砂邊室內平面應變試驗,分析了沙漠井場浸法施工中就基坑壁的破壞方式,推導出了基坑和孔容許開挖深度的計算公式。
  17. Calculation of internal force of embeded anti - slide pile in high rock slope

    巖石高邊埋入式抗滑的內力計算
  18. In consideration of the soil arch effect between anti - slide piles, a calculation formula for the anti - slide pile spacing was developed, taking the following factors as the controlling conditions - the static equilibrium equation of the frictional resistance and adhesive force between the side of piles and slope soil, which sustains the thrusting force of the landside, and the strength conditions at the medial cross - section and two end sections of soil arch

    摘要考慮抗滑間土拱效應,以側與邊土體間的摩阻力及黏著力承擔滑推力的靜力平衡條件和土拱跨中與拱腳處截面的強度條件共同控制,建立了抗間距的計算公式。
  19. If the fruits field is large or hilly, run a stake line across the center or divide the field and stake separately.

    假如果園面積很大或是起伏的山地,可貫通果園中心立一行測標線,或將土地分開並分別立
  20. Study on reinforcement of micro - pile and rockbolt for an unstable high - steep road cut slope

    失穩高陡路塹邊坡樁錨加固方案分析
分享友人