堰底 的英文怎麼說

中文拼音 [yànde]
堰底 英文
weir floor
  • : 名詞(較低的擋水建築物) weir
  • : 底助詞(用在定語后, 表示定語和中心詞之間是領屬關系, 現在多寫作「的」)
  1. As rust converter / anticorrosive in ballast tanks, bilges, cofferdams etc

    因其銹蝕轉化/抑制作用,適用於壓載水倉、倉、圍等。
  2. It is widely applied to the stove top, shove head, stove door and burmer brick, the binding of cooling - tube and groove bottom of the molten steel mouth of the heat stove, meantime empopyed in the field of the step stove bottom, the fir - proof wall of the circular stove, the cover, the protruding tape and sand sealing mouth of the equal - heating stove, the triangle, the spray gun and meltingiron groove of electric stove and also including fire - resistant material used in the refine stove and the stove door

    加熱爐的爐頂、爐頭、爐門、燒嘴磚、水冷管包紮、出鋼槽槽、步進爐爐、環形爐檔火墻、均熱爐的爐蓋、凸出帶、砂封口、中間包包蓋、電爐三角區、鐵水包襯里、爐外精煉用噴槍,吹氧煙道、鐵水溝蓋、檔渣、高爐中各種耐用火料襯里煉焦爐爐門等。
  3. Combining theory with practice, in this thesis, i analyses the content of the construction of steel round the barrage. such as, the structure of steel round the barrage, the arrangement of mooring, the calculation of mooring chain, the manufacture and assembling of steel round the barrage, the moving up connection and sinking of it, confining the bottom of underwater concrete

    本文結合實際工程,詳細分析了鋼圍的構造、錨錠系統的布設、錨纜的計算、鋼圍的製作及組拼、鋼圍的接高與下沉、水下混凝土封等圍施工的重要內容;並對常用的鋼套箱施工技術進行了討論。
  4. Secondly, based on the theoretical analysis of the chosen anti - slipping scheme, anti - slipping stress test, strength test of sealed - cover concrete, anti - floating test of cofferdam, stress test of supporting pile and stress test of stability are processed respectively, which proves that the new scheme presented in this paper is feasible

    然後對選定的抗滑方案進行理論分析,分別進行抗滑受力檢算、封混凝土強度檢算、鋼圍抗浮檢算、支樁受力檢算和穩定受力檢算,從理論上驗證本方案的可行性。
  5. In the light of the low - lying pile cap foundations designed for main piers no. 2 and no. 3 of tianluo bridge on wenzhou - fuzhou railway. this paper describes the ways to resolve the construction problems of the foundations in deep water in sea and at seabed that is steep and without overburden, using the construction techniques of underwater rock blasting, steel cofferdam floating, positioning, bottom sealing and manual pile digging

    摘要針對溫福鐵路田螺大橋2號、 3號主墩設計上採用低樁承臺基礎情況,介紹運用水下巖石爆破,浮運鋼圍就位、封、人工挖孔樁等施工技術解決海上深水、河床陡峭且無覆蓋層的基礎施工難題。
  6. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍基礎處理與施工技術;大江截流上下游土石圍平拋墊研究;二期圍防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  7. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍基礎處理與施工技術;大江截流上下游土石圍平拋墊研究;二期圍防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  8. Supervision and consultation projects completed : ( 1 ) jiangsu xindadou square ( 50, 000m2, two 30 - story buildings ), worked as chief supervision engineer ( consultation ) ; ( 2 ) " yanqiao overpass service center of xicheng highway ( the first overpass type service center on highway in china ), worked as chief supervision engineer ( consultation ) ; ( 3 ) the ninth 5 - year - plan updating technology project of huaiyin tobacco plant, 50, 000m2, worked as chief ( supervision and consultation ) ; ( 4 ) the softy testing, analysis and consultations of nanjing international conference and exhibition center, site - erected structure, 75m span steel roof truss ( the largest one in china ), worked as chief of test and consultation ; ( 5 ) " the consultation service of the testing, analysis and update technology of the reliability of the joints of intermediate floor slabs, beams and columns of base beam of sanshanjie station of nanjing metro " etc

    完成"江蘇新大都廣場( 5萬多平方米,二幢30層) "建設監理咨詢(總監) ; "錫澄高速橋跨線服務區(國內首座) "建設監理咨詢(總負責) ; "淮陰卷煙廠9 . 5技改項目( 5萬多平方米) "建築監理咨詢(總負責) ;主持了"南京國際會展中心75m跨鋼屋架(國內最大距)現場施工安裝結構安全性測試分析咨詢" ; "南京地鐵三山街站中樓板及板樑柱節點構造技術安全可靠性的測試分析與技術改進咨詢服務"等項目。
  9. Shankou spillway project has many specific characteristics, for example, the gate frusta and weir body have equivalent thickness, the weir body is low and have corridor, the foundation of the weir body is " high - low foot " " and the side frusta is also used as retain wall. in view of the characteristics, to better analyze the stress distribution on weir body, gate frusta, the joints between gate chamber and weir body, under the condition that the gate chamber is applied with asymmetrical loads and complicated constraints, three dimensional finite element method is applied in this paper

    本文針對山口溢洪道閘墩與板厚度相當,體為低且設有廊道、體建基面「高低腳」及邊墩兼作擋土墻等具體特點,在閘室設計中采山口水利樞紐工程溢洪道閘室三維有限元整體應力計算分析用三維有限元整體應力計算方法分析閘室的受力狀態,分析閘室在荷載不對稱。
  10. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍的全結構模型,相對準確地模擬灌注封混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊頂梁、梁等的應力和變形,並對比吊箱圍板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
  11. The construction scheme is briefly introduced herein, and furthermore, the diversion structures, the composite scheme consisting of open caisson group adopted to treat the overburden of the foundation for the stage 2 longitudinal concrete cofferdam and the diversion method of bottom outlet combined with the dam gap used for the stage 2 diversion are described as well

    文中對該方案進行了簡要介紹,並介紹了有關導流建築物,以及二期縱向混凝土圍基覆蓋層採用了沉井群等綜合處理方案和二期導流採用的孔加缺口聯合泄流方式。
  12. In the 4 7 century, the water resources from kongqiu river was cut off because of old kongqiu river changed channel resulted from landslip on upper reaches. the old city had to discard

    公元4 7世紀間,古城上遊河段曾先後兩次發生河岸滑坡堵塞河水,形成塞湖,導致孔雀河改道,從而徹斷絕了維系樓蘭古城生命的唯一水源,古城不得不被廢棄而且無法復興。
  13. On philosophical connotation and cultural details of dujiangyan project

    試論都江的哲學內涵與文化
分享友人