堰支 的英文怎麼說

中文拼音 [yànzhī]
堰支 英文
coefferdam-bracing
  • : 名詞(較低的擋水建築物) weir
  • : Ⅰ名詞1 (分支; 支派) branch; offshoot 2 (地支) the twelve earthly branches3 (姓氏) a surname...
  1. Do poineering work up to now, the company already held water shenzhen, guangzhou, zhuhai, dongguan, chengdu, wuhan, nanning, nanchang, changsha, xiamen, wen zhou, 10 lasher, le qing, reach without more than 20 branches such as stannum, north human relations, ci xi, baoan more than 10 concessionary, the household industry that formed wide cloth whole nation serves network and powerful service to support power

    創業至今,公司已成立了深圳、廣州、珠海、東莞、成都、武漢、南寧、南昌、長沙、廈門、溫州、十、樂清、無錫、北倫、慈溪、寶安等二十多家分公司及十余家特許經營、連鎖加盟店,形成了廣布全國的家居產業服務網路和強大的服務持力量。
  2. Secondly, based on the theoretical analysis of the chosen anti - slipping scheme, anti - slipping stress test, strength test of sealed - cover concrete, anti - floating test of cofferdam, stress test of supporting pile and stress test of stability are processed respectively, which proves that the new scheme presented in this paper is feasible

    然後對選定的抗滑方案進行理論分析,分別進行抗滑受力檢算、封底混凝土強度檢算、鋼圍抗浮檢算、樁受力檢算和穩定受力檢算,從理論上驗證本方案的可行性。
  3. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍基礎處理與施工技術;大江截流上下游土石圍平拋墊底研究;二期圍防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與護研究;特大型水輪發電機組的科學研究。
  4. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍基礎處理與施工技術;大江截流上下游土石圍平拋墊底研究;二期圍防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與護研究;特大型水輪發電機組的科學研究。
  5. The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main

    論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。
分享友人