堰管 的英文怎麼說
中文拼音 [yànguǎn]
堰管
英文
weir tube-
Hydraulic experiments on long water supply pipelines connected to overflow weirs
長輸水管道尾部保水堰的水力特性試驗研究There exist problems of driving training in shiyan, such as inferiority in training, non - qualified training teachers, non - scientific mangement system, outnumbered training schools and non - strick regulations
摘要十堰市的駕培行業存在較多問題,主要有駕校培訓質量差、教練員素質不高、管理上體制不順、駕校總童失控、開業把關不嚴等。Abstract : this paper introduces the scheme, deep cut of foundation pit to bury pipe, which is adopted for wenjiayan seawall in qiantang rever. compared with the scheme of withstanding pipe, this scheme has the advantage of saving investment, simple construction and time + - saving. it is convenient to check the anti - seep installation between water pipe and seawall
文摘:本文通過錢塘江聞家堰海塘深基坑開挖埋管,替代原設計頂管方案,具有工程投資省、施工簡單、工期短,且便於檢查取水管與海塘之間防滲措施This is a manufacturer specializing in manufacturing machines of producing soft metal pipe, corrugated pipe and stainless steel pipe
江蘇?姜堰通用焊接機械設備廠是一家生產金屬軟管、波紋管及不銹鋼設備的專業廠家。It is widely applied to the stove top, shove head, stove door and burmer brick, the binding of cooling - tube and groove bottom of the molten steel mouth of the heat stove, meantime empopyed in the field of the step stove bottom, the fir - proof wall of the circular stove, the cover, the protruding tape and sand sealing mouth of the equal - heating stove, the triangle, the spray gun and meltingiron groove of electric stove and also including fire - resistant material used in the refine stove and the stove door
加熱爐的爐頂、爐頭、爐門、燒嘴磚、水冷管包紮、出鋼槽槽底、步進爐爐底、環形爐檔火墻、均熱爐的爐蓋、凸出帶、砂封口、中間包包蓋、電爐三角區、鐵水包襯里、爐外精煉用噴槍,底吹氧煙道、鐵水溝蓋、檔渣堰、高爐中各種耐用火料襯里煉焦爐爐門等。Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985
自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁鋼沉井圍堰鉆孔樁基礎,鋼圍堰在橋梁基礎施工中的應用越來越多。The effect of gas rates, liquid flow - rates, downcomer width, weir height and the addition of surface active agent on the liquid mean residence time, t, effective diffusion coefficient, de, and froth height, hf were studied. results obtained showed that for two systems, the t in the downcomer of ctst plate is 20 - 50 % smaller than that of fl valve plate, and the de is 40 - 70 % smaller than that of fl valve plate
通過對氣速、液體流量、降液管寬度、堰高和表面活性劑加入的影響進行分析得出下面結論:在相同的操作條件下,對于兩種物系, ctst塔板降液管的液體停留時間比f1浮閥塔板的約小20 50 ,有效擴散系數比f1浮閥塔板的小40 70 ,泡沫高度低110 150mm 。Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units
介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。Article 20 the ditches, dikes and other relevant buildings which are interdependent with urban roads shall be managed by the authorities to which such facilities have greater utility after consultation among authorities concerned about the utility
第20條(與道路相依賴之水圳提堰等之管理)水圳、堤堰及其他有關建築物,與市區道路發生互相依賴作用時,由各該主管機關就效用大小會商,劃交效用較大方面管理之。Through the analysis on the process of change claim on construction of temporary cofferdam for the downstream leading channel of jinghong hydropower station, the full process of how to make the application for change of construction project based on the change between the actual construction condition and the construction condition during bidding and how to realize the approval of the quotation of contract change is described herein for the construction enterprise, and then some viewpoints on the management and utilization of the relevant talent resources are put forward as well
摘要工程索賠是一項知識和技術面很廣,復雜而又系統性很強的工作,文中通過分析景洪水電站下游引航道圍堰變更索賠過程,說明施工單位如何根據實際施工條件和投標時施工條件的改變,提出變更立項申請,實現變更報價審批的過程,同時在人才資源的管理和利用上提出一些見解。By systemic analyzing outside and inside highway - passenger - traffic management system and manner, beginning with the point of view how to deal and manage in standardization and how to establish exceed policy within measure, handling the principium of the systems engineering and measure economics, this paper forecasts the development trend of the society economy and highway - passenger - traffic, poses the particular measure and imagine how to build highway - passenger - traffic system. the theory method is very useful in practice and has reference to highway - passenger - traffic market management of our middling and small city
本文通過系統的分析國外、國內公路客運管理體制及其運作方式,從十堰市的公路客運行業如何規范化經營、規范化管理的良性態勢的角度出發,從政府如何制定適度超前的管理政策切入,運用系統工程、計量經濟學原理,科學預測了社會經濟發展與公路客運發展的趨勢,並提出建設中小城市公路客運交通體系的具體措施與設想,理論分析方法具有較強的實用性,對我國中小城市的公路客運市場管理具有一定的參考作用。This article bases on the village and township enterprises in jiangyan. i use demonstration method to analyse the process of its development and the current situation ; the characters and the problems existing of the exploitation and management in its human resources
本文以地處江蘇省中部的姜堰市鄉鎮企業作為研究對象,採用實證研究的方法,系統地分析其發展過程,人力資源開發與管理的現狀、特點及存在問題。In consideration of the hydrological and meteorological conditions, the construction characteristics, and the temperature control standard of rcc for cofferdams on upper and lower reaches and for right dam sections, an introduction was given to special temperature control and management measures adopted in rcc construction of longitudinal cofferdams at jinghong hydropower station during the high temperature period
摘要針對景洪水電站水文氣象條件、施工特點,以及上下游圍堰和右沖壩段碾壓混凝土溫度控制標準,介紹景洪水電站縱向圍堰高溫季節碾壓混凝土施工過程中採取的具體溫控措施,以及業主在溫控組織管理工作中採取的措施。Inventory and monitoring of biodiversity, a training course of biodiversity research and information management, was held in dujiangyan city, sichuan province, on july 1 10, 1999
由中國生物多樣性委員會主辦的生物多樣性研究與信息管理培訓班「生物多樣性的編目與監測」於1999年7月1日至7月10日在四川省都江堰市舉行。Shanghai zhangyan new material intensive processing industry base under the state torch program, the predecessor of shanghai non - ferrous high - tech industry park with planned area of 10. 44 sq. km., has finished 3 sq. km. infrastructure in the first phase and will complete the administration center, auxiliary facilities for the living area and 2 sq. km. infrastructure for the second phase by 2006
國家火炬計劃上海張堰新材料深加工產業基地,前身上海有色高科技工業園區,基地規劃面積10 . 44平方公里,完成了首期3平方公里的基礎設施建設, 2006年完成行政管理中心、生活配套區及第二期2平方公里的基礎設施建設。分享友人