堰箱 的英文怎麼說
中文拼音 [yànxiāng]
堰箱
英文
weir box-
Since the air pressure sink - box technology was abandoned, and the steel - plate peg round the barrage pipe peg foundation was adopted at first time in the wuhan changjiang bridge project, the steel round the barrage has been adopted in bridge foundation construction more and more. especially after the double wall steel sink well round the barrage bore peg foundation was creatively adopted in jiujiang changjiang bridge foundation, which was built in 1985
自從武漢長江大橋工程中擯棄了過去一直沿用的氣壓沉箱,首次採用了鋼板樁圍堰管柱基礎以來, 1985年建成的九江長江大橋基礎獨創性地採用雙壁鋼沉井圍堰鉆孔樁基礎,鋼圍堰在橋梁基礎施工中的應用越來越多。Combining theory with practice, in this thesis, i analyses the content of the construction of steel round the barrage. such as, the structure of steel round the barrage, the arrangement of mooring, the calculation of mooring chain, the manufacture and assembling of steel round the barrage, the moving up connection and sinking of it, confining the bottom of underwater concrete
本文結合實際工程,詳細分析了鋼圍堰的構造、錨錠系統的布設、錨纜的計算、鋼圍堰的製作及組拼、鋼圍堰的接高與下沉、水下混凝土封底等圍堰施工的重要內容;並對常用的鋼套箱施工技術進行了討論。The design and construction of boxed cofferdam of the zhujiang bridge
珠江特大橋吊箱圍堰設計與施工The new construction technique applied to the huge steel boxed cofferdam for foundation of pylon pier no. 2 of wuhan tianxingzhou changjiang river rail - cum - road bridge was to fabricate the cofferdam in integrity in workshop, shift it down to river and float it to the pier site where it is then accurately positioned by pre - tensioning at the anchor pier
摘要武漢天興洲公鐵兩用長江大橋2號主塔墩基礎大型鋼吊箱圍堰採用工廠整體製造,下河浮運至墩位,利用錨墩施加預拉力精確定位的施工新工藝。With the development of construction technology and mechanic about deepwater foundation, hanging box weir had being applied widely for construction of high pile cap
隨著深水基礎施工技術和機械的發展,吊箱圍堰在高樁承臺施工中的應用日益廣泛。In this paper, by way of example of the elevated pile cap construction of sanmenjiang bridge in liuzhou city, the design and construction of the column steel boxed cofferdam of tensile and compressive type are introduced with particular details given to its design scheme, working principles, construction technology and construction key points, and the matters of attention in the construction with the cofferdam are expatiated as well
以柳州市三門江大橋高樁承臺施工為例,介紹拉壓柱式鋼吊箱圍堰的設計與施工,重點介紹鋼吊箱圍堰的設計方案、工作原理、施工工藝及施工要點等技術細節,同時對鋼吊箱圍堰施工中的注意事項進行了闡述。The paper introduces large - scale fem software, algor, by which the auther can build model of hanging box of high pile cap, and simulates accurately three loadcases, which include loadcase behind enclosed concrete, loadcase behind empty water in hanging box, and loadcase behind high pile cap construction. the auther calculates tensor and displacement of hanging box weir when loads exert panels, supports, suspenders, top beams, base beams of hanging box weir. at the same time the auther carrys out th e stability analysis, besides, educes calculational and analytical data, which are tally with construction result in the main
論文介紹大型通用有限元計算軟體algor ,並用軟體建立大遼河特大橋高樁承臺吊箱圍堰的全結構模型,相對準確地模擬灌注封底混凝土后、抽除吊箱內河水后、承臺破冰體施工后等三種受力工況,並用模型進行了應力和變形的計算,計算各工況荷載作用於吊箱全結構箱體板面、內支撐、吊桿、懸吊頂梁、底梁等的應力和變形,並對比吊箱圍堰板面計算變形和施工實測變形,結果是吻合的;對大遼河特大橋高樁承臺輕型吊箱的穩定性進行了計算分析;論文研究工作表明,應用組合有限元方法計算大型施工結構問題具有現實意義。Design and construction of steel boxed cofferdams for pile caps of hangzhou bay sea - crossing bridge in tidal - flat area on south bank
杭州灣跨海大橋南灘塗區承臺鋼吊箱圍堰設計與施工Steel wall cofferdam construction of the no. 3 main tower pier for tianxingzhou yangtze river bridge
天興洲長江大橋3號主塔墩鋼吊箱圍堰施工The construction method using steel boxed cofferdam is a chief method for construction of pile caps in deep water
摘要鋼吊箱圍堰施工方法是深水承臺施工中的一種主要施工方法。分享友人