堵口泥 的英文怎麼說
中文拼音 [dǔkǒuní]
堵口泥
英文
tapping clay-
Others, men and women, dipped in the puddles with little mugs of mutilated earthenware, or even with handkerchiefs from women s heads, which were squeezed dry into infants mouths ; others made small mud embankments, to stem the wine as it ran ; others, directed by lookers - on up at high windows, darted here and there, to cut off little streams of wine that started away in new directions ; others devoted themselves to the sodden and lee - dyed pieces of the cask licking, and even champing the moister wine - rotted fragments with eager relish
還有的人,有男有女,用殘缺不全的陶瓷杯子到水窪里去舀有的甚至取下女人頭上的頭巾去蘸滿了酒再擠到嬰兒嘴裏有的用泥砌起了堤防,擋住了酒有的則按照高處窗口的人的指示跑來跑去,堵截正要往別的方向流走的酒,有的人卻在被酒泡漲被酒渣染紅的酒桶木片上下功夫,津津有味地咂著濕漉漉的被酒浸朽的木塊,甚至嚼了起來。Correspondingly, its theory is up to developed to a higher level. in this thesis, taking the risk management activities of the two parties of insurance as the perceptive and the process of engineering insurance as the clue, the establishment of risk management system is analyzed during the process of risk identification and evaluation, insurance contract arrangement, disaster prevention and loss reduction, and the compensation management. furthermore
本文在查閱大量文獻的基礎上,對疏浚泥泵及排泥管道的動態特性現象進行了分析,並應用面向對象的c + +語言開發了比較通用的計算機程序,對緊急關閥、水下挖掘機具(如絞刀、斗輪等)吸泥口堵塞以及事故拋泵等典型的動態工況特性進行了計算和分析。The harbour has silted up
這港口已被淤泥堵塞Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china
簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例This model of valve overcomes such defects with the motor valve, piston - type electromagnetic valve as the post - wear defective closure due to the mechanical movement, the soft membrane full of elasticity, the balance hole can not close water because the foreign matters and mud sand accumulate and block it up etc., the highly effective use of the unique circuit greatly raises the reliability of the switch, extensively used for ic card watermeter, infrared induced sanitary utensils, etc
Fck - 118 :進水口出水口為1寸25內螺紋該型閥克服了如電機閥活塞式電磁閥機械運動磨損后的關閉不良。軟性膜片富有彈性,平衡小孔不會因雜質與泥沙的淤積堵塞使其關不住水,獨特線圈磁路的高效利用大大提高了閥開關可靠性,廣泛用於ic卡水表紅外線感應潔具等自動控水系統。Unshaped refractory products. determination of the extrusion resistance of the taphole clays
散裝耐火材料製品.堵口泥抗擠壓的測定The sand has silted up the mouth of the river
泥沙已把河口堵住了分享友人