  1. Abstract : as lanzhou construction areas extend towards gaolan mountains, baita mountains and the valley regions, the problem of environmental control for the made fill & excavation reconstruction project sites becomes more and more obvious

    黃土挖改造工程場的環境條件十分復雜,只注重工程建設而忽視環境治理,將危及建物和工程場地的長期安全。
  2. The district open space at belcher bay reclamation as part of the project was completed in august 1998

    卑路乍灣的地遊憩用地建工程已於一九九八年八月完成,這是工程計劃的一部分。
  3. For example the concrete faced rock - fill dam in frigid zone is distinctive in terms of frost resistance and durability, cushion material seepage prevention and frost heave, adaptability of darn filling with season coordination among construction diversion, flood discharge and the whole construction schedule etc. lianhua construction which is situated in mudanjiang basin of heilongjiang province firstly creates the successful record of construction of large - size faced rock - fill dam in frigid zone, a series of internal and external problems not having a precedent to go by have been solved

    如在面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地混凝土面板堆石壩均有其獨特之處。蓮花工程位於黑龍江省牡丹江流域,首創了高寒地修建大型面板堆石壩的成功記錄,解決了一系列國內外均無先例的難題。
  4. Culvert under high - stack soil is a ubiquitous phenomena in road constructions in mountain, self - compression of high - stack soil can not be ignored, soil pressure at the top of culvert is affected by many factors, including the height of high - stack soil, section size of culvert, width of the bottom of valley, grade of valley, property of filled soil, construction procedure and techniques

    高路堤下埋設涵洞是山公路建設的一種較為普遍的現象,高路堤自身壓縮較大,不可忽視,涵洞頂部土壓力的大小又受很多因素的影響,包括土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,體性狀,施工工序與工藝等。
  5. Experimental study on using coal slack as the filling of roadbed

    煤矸石鐵路路基的應用
  6. It includes spatial and visual effects of waterfront development, threshold limit of reclamation, view paths of special scene spots, ridgeline protection, tall structures at strategic locations

    這個形式應包括海旁發展的空間及視覺效果、的界限、特殊風景點的觀景徑、山脊線的保護,以及位於策略性位置的高聳建物。
  7. It has accumulated much experience in the choice of earth rockfill dam ' s material, division of dam ' s body, stabilization of dam, seepage, settlement, analysis of stress and strain, treatment of foundation, criterion of reclamation and machine of construction and so on

    在土石壩壩材料,壩體分,壩體穩定,滲流,沉降及應力應變分析,基礎處理,標準,施工機具等一系列關鍵技術上,已經積累了豐富的經驗。
  8. Non linear static & dynamic finite element procedure is adopted for the true emulation of the four typical geologic profiles of the dam, and imitates to compute the each stage deformation and stress distribution from the dam fill to full water run and during the 7 degree seismic intensity, the article also imitates to compute the response to earthquake force, the excess vibration pore water pressure distribution and permanent deformation, predicting the occurrence possibility of the crac ^ plastic zone and earthquake liquefaction

    採用非線性靜、動力有限元分析程序對圍壩的4個典型剖面進行了靜、動力模擬模擬,模擬計算了壩體自至蓄水運行和發生7地震各階段壩體及壩基的變形以及應力分佈,地震應力響應和地震引起的超靜振動孔隙水壓力分佈以及永久變形。判斷了壩體和壩基中出現裂縫、塑性以及地震液化的可能性。
  9. Bank is an important part in chinese system of controlling flood. it has accumulated much experience in the choice of bank ' s material, division of bank ' s body, stabilization of dam, seepage, settlement, analysis of stress and strain, treatment of foundation, criterion of reclamation and machine of construction and so on

    堤防是我國防洪工程體系的重要組成部分,在堤材料、堤體分、堤體穩定、滲流、沉降及應力應變分析、基礎處理、標準、施工機具等一系列關鍵技術上,已經積累了豐富的經驗。
  10. Construction division and stage division scheme for embankment of concrete faced rockfill dam of bailianhe pumped - storage power station

    白蓮河電站面板堆石壩分期方案分析
  11. Large - scale compaction tests have been carried out and compared with design compacted standards before embankment in order to ensure embankment parameter for dam construction

    摘要盤石頭水庫面板堆石壩,在筑前進行了大型碾壓試驗,復核設計壓實標準,確定各壩材料的參數,供壩體施工採用。
  12. According to plentiful of experimentation, some new build techniques are created, for example the technique of no watering fill in winter, the technique of prevent frostbite and crack of faceplate etc. these techniques were proved by the project of lianhua cfrd. at last this paper gives some conclusion

    而且根據地特點,進行了大量的實驗,給出了以往一般面板壩所未遇到過的施工工藝,如冬季堆石體不灑水、面板的防凍抗裂、壩體渡汛措施等以及採用新的爆破方法開採石料等新的施工工藝。
  13. The characteristics, construction and attentive proceeding are discussed in construction of red sandstone. a detailed description is given according practical examples, especially in blasting of red sandstone and compaction

    摘要通過京九鐵路麻武聯絡線的施工,簡要地敘述了線路所處地的紅砂巖的特性與施工,及其施工中所應注意的事項,根據實際施工情況,特別對紅砂巖的爆破及壓實方面進行了較為詳細的敘述。
  14. According to the question of foundation engineering from test section ( lko + 900 to lk1 + 000 ) of xichang - - panzhihuang express highway, this paper put up important systems analysis and study on the deformation of roadbed which is filled by special stratum on site - - xigeda stratum

    本論文結合西攀高速公路試驗路段( lk0 + 900 lk1 + 000 )的地基工程問題,重點對該的特殊地層? ?昔格達地層路堤的變形問題進行了分析和研究。
  15. The overall strategy involves the maintenance of a well - managed public filling programme with sufficient facilities and access

    整體建廢物管理策略包括在交通方便的地點,辟設足夠的公眾
  16. Abstract : in the filling construction of lianhua concrete face rockfill dam, we have paid attention to plan the material sources according to the actual conditions, such as, using the excavated materials in other structures in order to reduce the cost, adopting the measures of filling by zones to quicken the construction progress and solve the construction problems during the cold seasons, using the convenient transportation roads to the dam and good road surface quality to ensure the high intensity filling, and selecting the rational construction equipment to make full use of the all equipment

    文摘:蓮花面板堆石壩施工中,注意對壩料源做出符合工程實際情況的規劃:利用其他建物的開挖料降低造價;採用分的措施,加快施工進度和解決寒冷季節施工問題;方便的上壩交通道路網和良好的路面,為高強度提供有力保證;選擇合理配套的施工設備使設備得到優化利用。
  17. With the example of suibei highway, the paper expounds the general construction method of filling the weak frozen and low liquid limit clay foundation in the area of northeast china

    摘要結合綏北公路建設實例,闡述東北地弱凍低液限粘土路基施工的一般方法。
  18. Construction waste treatment the major approach to managing construction waste in hong kong is the use of public filling areas for inert construction waste and landfills for non - inert construction waste

    目前香港的建廢物處理方法,主要是將惰性建廢物運往公眾處置,而非惰性建廢物則會被運往堆
  19. We issue internal guidelines to tighten the control over the disposal of c & d waste. in 2003, we handled 93, 654 nos. of trip tickets from 179 archsd s sites and we disposed 474, 357 m

    在2003年,我們處理了建署轄下179個工地合共93 , 654份運載紀錄表,在公眾棄置了474 , 357立方米的建及拆卸物料,及在堆棄置了107 , 126噸建及拆卸廢料。
  20. Adaptability of dam filling with season and coordination among construction diversion, flood discharge and the whole construction schedule should be taken into consideration. the choose of dam site, layout of the multipurpose project, design of concrete faced rockfill dam, construction and prototype observation are covered in this paper

    如在混凝土面板的抗凍耐久性、墊層材料防滲和凍脹特性、壩體與季節的適應性、導流和度汛與總體進度的協調等方面,寒冷地混凝土面板堆石壩均有其獨特之處。