墻中心線 的英文怎麼說

中文拼音 [zhōngxīnxiàn]
墻中心線 英文
center line of wall
  • : 名詞(磚、石等築成的屏障或外圍) wall
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  1. In order to solve the problem of engineering roadblock of abnormity wall template design, program alternatives, construction techniques and engineering roadblock, this paper discusses the difficulty of hyperbola template construction on the innovation of traditional simple curve zoom type huge template by combining the three dimensional space hyperbola rinse concrete wall in art performance theater of qingdao art center project construction, provides a method to design and choose heteromorphy component template

    摘要為了解決異形體模板設計、方案選擇及施工工藝等技術難題,筆者結合青島市藝術工程藝術表演劇場三維空間雙曲清水砼施工,在傳統的單曲可調式大模板的基礎上進行了創新,很好的解決了雙曲模板施工的技術難點,為異型構件模板的設計、選擇開拓了又一條思路。
  2. I stood straight up against the wall, my heart still going like a sledge - hammer, but with a ray of hope now shining in my bosom

    我靠邊站直了身,還像敲鼓似的咚咚跳,但還閃現出一希望。
  3. Participants will now run a route which passes by the national stadium, better known as the “ bird ' s nest ” ; the national aquatics center, also called the " water cube " ; as well as the olympic archery and hockey venues

    新的全程馬拉松路不僅經過了北京著名的元大都城遺址公園,還會讓您一覽新建成的2008北京奧運會體育場館風貌,其有2008北京奧運會主體育場國家體育場「鳥巢」 、國家游泳「水立方」以及曲棍球和射箭比賽場地。
  4. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計,壩型的選取顯得尤為重要,特別對于壩基有深厚覆蓋層的堆石壩,和壩基防滲的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、壩基混凝土防滲與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土和壩基垂直防滲方案、瀝青混凝土和壩基垂直防滲方案以及粘土斜和壩基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲不同彈性模量對體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全面的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  5. In chapter 3, a method to extract engineering quantity information based on relating views is introduced, understanding strategies of drawing information related to engineering quantity, detailed algorithms and its applied example are also introduced at the same time

    以土石方工程量為例,給出了功能部件對應圖形信息的理解策略、具體演算法和應用實例。利用基於最大連通域搜索技術,判別基礎的類型,提出了建立視圖尺寸關系樹以獲取施工圖圖形實體尺寸的方法。
  6. Through comparing and analyzing of bearing capacity, development of crack and strain of reinforced, the results show that the load - deflection plots f or specimens from the finite element analysis agree well with the experimental data, and choosing the rightful stress - strain relationship, utilizing ansys program, the test process can be well simulated. at the same time, making used of the program, the traditional shear wall is analyzed. it shows that comparing with the traditional shear wall, the hollow shear wall ' s cracking load drop 16 %, yield load and failure load drop 13 %, stiffness drop 13 % ~ 22 %

    其次在試驗的基礎上,將試驗手段、有限元數值模擬方法和理論分析結合起來,利用有限元程序ansys對其的兩片板進行非性有限元分析,並對前後的承載性能,裂縫發展、鋼筋應變進行了比較和分析,結果表明有限元節點模型分析的荷載-位移曲和試驗測得數據符合良好,選用合理的材料本構模型,利用ansys可以較好的模擬試驗過程;同時利用有限元模型對比分析了普通剪力和空剪力,空剪力與普通剪力對比,其開裂荷載下降16 ,屈服荷載、極限荷載下降13 ,剛度下降13 22 ,開裂至屈服、屈服至極限荷載階段的剛度衰減規律與普通剪力基本一致,空剪力的後期剛度比較穩定。
  7. The teams set up their control centres by the pit wall : high - tech tents with computers, monitors and radio antennae

    車隊將他們的指揮設立在維修站的護邊:在這個高科技的帳篷有計算機、監視器和無電天
  8. The east side of the district is 170 meters from the west wall of taipa junior high school and the west side of the district borders the urban planning area of chiayi county government. tainan station the special district is located in salun farm of jente sugar plant of kueijen township in tainan county, crossed by county highway no. 149 and covering wutung village, salun village and tatan village of kueijen township

    本特定區以高鐵車站為,計畫范圍北側以現有之臺糖鐵路為界,東側以距太保國西邊約170公尺為界,南側大致以現有溝渠春珠大排附近為界,西側與變更暨擴大嘉義縣治所在地都市計畫區接壤,總面積約136公頃。
  9. Position the bores according to the product. drill 6 bores respectively with impact driller, after the center line for bolt bore is drawn in the appropriate position on the wall

    根據產品安裝孔位,在面相應位置畫出螺釘孔后,用沖擊鉆分別鉆6孔。
  10. A. position the bores according to the product. drill 6 bores respectively with impact driller, after the center line for bolt bore is drawn in the appropriate position on the wall

    根據產品安裝孔位,在面相應位置畫出螺釘孔后,用沖擊鉆分別鉆6孔。
  11. The numerical results show that the horizontal variation of response acceleration of gravity retaining wall is quite small since its lateral rigidity is large enough, the response at a given height level can be considered as the same, the maximum accelerations at different heights on the central vertical line can describe the distribution of earthquake load along the wall height in static analysis very well

    數值結果顯示,重力式擋土結構剛度很大,地震加速度反應在水平方向差異很小,可看作是同步的,可取上各點最大加速度來描述靜力法地震作用沿高度的變化規律。在沿高度方向,加速度分佈不是呈直變化,比較復雜,總的變化趨勢大體一致。
  12. The first phase construction of group networking security determined the organizing framework of security management, established integrated security strategy and networking security management system, and solved the problem of uniform defense and concentrated control for the w hole network virus, the security problem of transmission of the ddn special line, and the problem of accessing control of the important networks and networking servers by combining with corresponding security technique, anti - virus technique, firewall technique, invasion detected technique, and risk evaluation technique, etc, and implemented the security defenses for the weakest level ( transmission security of inter - region mainline network ) and kernel level ( multi - lans in first class secret units ) in the system

    集團網路安全一期建設確定了安全管理組織機構、制定了整體安全策略和網路安全管理制度,並結合相應安全技術防病毒技術、防火技術、入侵檢測技術、風險評估技術等,解決了全網病毒的統一防範集控管問題、 ddn專上的傳輸安全問題、重要網路及網路服務器的訪問控制問題等。實現了系統的最薄弱層(跨地域主幹網路傳輸安全) 、核層(多個一級保密單位局域網)的安全防範。
分享友人