墻面覆蓋層 的英文怎麼說

中文拼音 [miàncéng]
墻面覆蓋層 英文
wall cladding
  • : 名詞(磚、石等築成的屏障或外圍) wall
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 動詞1. [書面語] (蓋住) cover 2. [書面語] (底朝上翻過來; 歪倒) overturn; upset 3. 同 「復」 (Ⅱ1. 2. )
  • : 蓋名詞(姓氏) a surname
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • 覆蓋 : 1 (遮蓋) cover; overlap 2 (植被) plant cover; vegetation3 (保護層 覆蓋物) cover; covering; ...
  1. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續是一種歷史較短的施工方法,目前,砼防滲的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設計剖,採用thepd土石壩總應力程序,對深塑性混凝土防滲的應力、位移進行有限元分析,並與普通混凝土防滲計算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲的安全程度。
  2. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,壩型的選取顯得尤為重要,特別對于壩基有深厚的堆石壩,心和壩基防滲的應力和變形是壩體、壩基最敏感的部位,設計方案是否安全、科學和合理,對大壩防滲和穩定起到至觀重要的作用。本文研究分析了國內外深厚基礎防滲設計、壩基混凝土防滲與壩體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚基礎防滲設計的方案選擇提供了參考;在吸收和歸納了國內外堆石壩的設計研究成果的基礎上,對粘土心和壩基垂直防滲方案、瀝青混凝土心和壩基垂直防滲方案以及粘土斜心和壩基水平鋪防滲方案,分別按竣工期和蓄水運行期的不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡的大壩防滲體與基礎混凝土防滲的不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲不同彈性模量對體應力和變位的影響進行了三維有限元靜力計算分析和研究。通過對不同方案的計算分析和研究,比較全的了解了各方案壩體,尤其是防滲體的應力和變形分佈規律,為壩型選擇、壩體結構設計、基礎防滲與壩體防滲體的結合型式以及塑性區大小的確定提供了重要依據。
  3. The stress - deformation behavior of diaphragm walls of concrete face rockfill dam built on thick alluvium deposit was analyzed using the numerical analysis method

    摘要採用數值分析方法對深上混凝土板堆石壩的防滲應力變形性狀進行了研究。
  4. By virtue of the design features of the mania dam, this paper studies the dynamic characteristics of the dam materials. by comparison with other similar projects, it presents a curve for dynamic characteristics of clay core materials and rockfill materials, makes analysis on the dam ' s plane dynamic response by finite element method, calculates the dam ' s seismic acceleration, the dynamic shear stress of the rockfill, and the dynamic stress of the cutoff wall in the overburden layer

    本文針對滿拉土心堆石壩的設計特點,進行了築壩材料動力特性試驗研究,通過與相關工程對比給出了心料和堆石料的動力特性曲線,採用有限元方法進行了大壩平動力反應分析,計算了大壩的地震加速度、堆石體動剪應力及防滲的動應力。
  5. The influences of the properties of alluvium deposit, the properties of diaphragm wall concrete, the construction sequence of diaphragm walls, the distance between diaphragm walls and dam toe and the shape of diaphragm walls on the stress - deformation behaviors of diaphragm walls of concrete face rockfill dams were studied

    研究了特性、防滲混凝土特性、防滲施工順序、防滲與壩趾之間距離和防滲形狀對于板堆石壩防滲應力變形性狀的影響。
  6. Roofing and wall cladding - determination of the bending characteristic resistance - conventional test method for bending of self - drilling and self - tapping fasteners longer or equal to 70 mm

    屋頂和墻面覆蓋層.耐彎曲性的測定.大於或等於70mm的自鉆孔或自攻絲緊固件的常規彎曲試驗方法
  7. Roofing and wall cladding - determination of the characteristic resistance of the assembly - test method to determine pull - out load of fasteners in crown or valley fixing out of their subconstruction

    屋頂和墻面覆蓋層.耐安裝特性的測定.固定在拱頂或屋谷下結構之外的緊固件的拉出力測定的試驗方法
  8. Roofing and wall cladding - determination of the characteristic resistance of the assembly - test method to determine the pull - out load of the plates assembly from the subconstruction for plates made from steel or aluminium

    屋頂和墻面覆蓋層.耐安裝特性的測定.鋼制或鋁制板材用的板材組件從下結構中抽出的負載測定的試驗方法
  9. During the day, the walls are transparent and full of light. at night, accordion - style doors unfold to cover everything. the ceiling has a row of thin, elegant skylights, with a graceful transparent canopy over the window

    這真是世上最美的一間鳥舍-白天時,四壁是透明的,陽光充裕到了夜晚,只要將一扇折疊式拉門拉開來,就可以發揮很好的遮掩效果天花板上有一排雅緻的薄天窗,天窗上方則著一典雅的透明罩。
  10. Concrete roofing tiles and fittings for roof covering and wall cladding. test methods

    屋頂物和用混凝土屋瓦及配件.試驗方法
  11. Roofing and wall cladding - mechanically fastened waterproofing layer sheeting - evaluation of unscrewing resistance

    屋頂和墻面覆蓋層.機械安裝防水擋板.耐拆卸性評價
分享友人