  1. ( 4 ) enhancing the downriver cofferdam will make the lower reaches of a river dissipate more energy. however, it will increase erosion and the protection will be more difficult

    抬高游圍堰可以使游分擔更多的消能任務,減輕區的和消力池的消能負擔。
  2. Observation and analysis of the river bed scour behind the third dam of gutianxi

    古田溪三級大遊河床原型觀測與分析
  3. In order to understand the characteristics and mechanism of flow washout for the crevice of core wall in earth - rock dam, according to the exemple of crack washout test for the core of heihe dam, constant water level washout test and changing water level washout test are adopted differently, the process of test and the character of the flow washout for the core crack are gone into particulars

    摘要為了解水流作用反濾層對土石心墻裂縫發展保護作用的特點和機理,以黑河土石心墻裂縫試驗為例,分別採用常水頭和變水頭兩種方法,探討了土石心墻裂縫在水流過程中的特點。
  4. Through theoretical computation and experimental observation, it is put forward that the maximal depth of the scoured pits of the embankment is from ten to thirteen meters, and for several pits whose top are rinsed by main flow continuously, their scoured depth have reached twenty meters

    經過理論計算和試驗觀測研究,提出了仁存渡以沙質河床,丁最大坑水深為10 ? 13米,個別受主流持續頂?的丁,最大坑水深可達20米。
  5. This paper presents a method of probability analysis in order to develop the general design and analysis methods for problems of the embankment stability under random storm wave actions as well as with random properties of the embankment medium. the major purpose of this study is carry out modellings of ( 1 ) probability analysis for the problem of seepage stability of levee projects ; ( 2 ) probability analysis for the problem of erosion due to washout sediments from the embankment ; ( 3 ) numerical analysis for coastal evolution due to beach erosion under energy actions of storm wave

    本文根據598084號年浙江省自然科學基金項目和g59901號國家教育部回國留學人員科研啟動基金項目的部分研究目標和研究內容的要求應用概率分析方法研究了在隨機風浪荷載作用和築堤材料隨機性影響防護堤抗滲流、抗穩定性的分析計算模型;用數值分析方法研究了在浪潮能量作用岸灘侵蝕造成海岸演變問題的數學分析模型。
  6. In order to explore harness scheme, layout, measurements and parameters concerned of the project, which are appropriate for the characteristic and the evolvement law of the watercourse of ningxia section of the yellow river, the study on the experiment of the scoured pit of the dam buttress and runoff of the root rock of ningxia section of the yellow river is of important theoretical meaning and practicable value

    河道床質也不相同,仁存渡以上河段為沙卵石,以河段為沙質。為了探索適宜黃河寧夏段河道特性和演變規律的整治方案、工程布局、工程措施及有關參數,開展黃河寧夏段河道坑和根石走失試驗研究,具有十分重要的理論意義和實用價值。
  7. For example, after the collapse of ditong dam in idaho, may 5, 1976, it was found that it was not impervious very well, the impervious curtain was built poorly. when the seepage went through the impervious curtain, the exit water from the pervious material of the downstream or the right side of dam through the foundation or certain line between the foundation and the dam caused contact scour and piping

    如美國愛得華州提堂於1976年5月5日潰決,事後調查分析,因基透水性大,防滲帷幕施工質量差,滲流穿透帷幕,經地基或地基與的接觸面從游側透水料區逸出或從右肩繞滲經體逸出,出逸的水流引起了接觸和管涌,導致潰
  8. ( 5 ) lowing down the dam body will reduce the digging deep of the stilling basin, decrease the velocity of flow on the dam body and cut the difficulties of

    遊河床的加大,防護工作增加。降低體可以減小消力池的挖深,降低面流速和面的防護難度。
  9. Overall, the average deposit slope, changes in cross sections, scouring hole, and sediment discharge of downstream channel of dam no. 4 increased with deeper opening depth of dam no. 3

    由實驗結果得知,隨三號體在斷面拆除深度加深時,四號游的淤砂坡度、斷面變化、坑與輸砂量變化會隨之增大。
  10. With same opening depth applied at dam no. 3, deeper scouring hole was found at the downstream channel of dam no. 4 when the dam - conversion was conducted simultaneously. besides, the depth of downstream scouring hole of dam no. 4 increased with increasing opening depth at dam no. 3. 3. changes in the channel cross sections between dam no. 3 and no. 4

    三號體拆的方式會對四號坑的深度會產生影響,由體相同斷面的拆除,結果發現一次拆除會比分次拆除時造成坑的深度較深,而坑的深度會隨著體拆除的深度增加而變大。
  11. Based on the local scouring test of the dike ' s head under the action of clear tidal currents, of both tidal currents and waves, and of both muddy tidal currents and waves, variations of the scoured pit ' s depth at each dike ' s head with time, and the scoured pit ' s depths with three experimental conditions are compared

    進行了清水潮流和潮流波浪、渾水潮流波浪作用的4條丁試驗,給出了各丁坑深度隨時間的變化,對比了3種試驗條件坑的深度。