壩位 的英文怎麼說

中文拼音 [wèi]
壩位 英文
dam location
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站於西雅礱江的三灘至手爬溝河段,型為305米高雙曲拱,正常蓄水標高1880米。址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此基的防滲成為重要問題。
  2. Egypt ' s leadership in the arab was cemented by the aswan high dam

    阿斯旺大鞏固了埃及在阿拉伯世界的領袖地
  3. Calculation of water surface profile for earth dam with core wall during level fall of reservoir

    水庫水降落期心墻土水面線計算
  4. It is believed that three northeast - striking dextral slip fault zones, i. e. the baxian - shulu - handan fault zone, the huanghua - dezhou - dongming fault zone, and the linyi - huanghekou fault zone, are the result of the tectonic transform of paleogene extending to neogene - quaternary laterally slipping of north china plain rift systems, which extend along the central axis of rifts and accord with the quaternary centers of subsidence as the main seismic structures within the rifts

    認為縣束鹿邯鄲斷裂帶、唐山河間磁縣斷裂帶和黃驊德州東明斷裂帶3條北東向右旋走滑斷裂帶為華北平原裂谷系從早第三紀伸展拉張作用進入晚第三紀第四紀走滑剪切拉張作用的產物,這3條斷裂帶分別於3個北東向坳陷帶中部,並構成了第四紀沉降中心,與營口濰坊斷裂帶起構成華北平原內的主要強震構造。
  5. The known copper deposits in the distributive area of bikou group and the newly - discovered faziba medium - size copper deposits are all located in the favorable positions indicated by the optimal indicator elements for the eruptive - sedimentary copper deposits of this area

    碧口群分佈區的已知具規模的銅礦床及新探明的伐子中型銅礦均於本區火山噴發沉積型銅礦的最佳指示元素所指示的有利部
  6. For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem

    摘要對江坪河雙曲拱進行了三維彈塑性有限元分析,利用有限元應力成果分別計算了正常蓄水、設計洪水等3種工況下加固前後肩系統的點安全系數和7個可能滑動塊體的抗滑富餘系數。
  7. The studying on the mechanism of beiyin main channel gliding slope heilongjiang beiyin project lies in the west of heilongjiang which lies the center of nenjiang. geographical location is east longitude 124 - 126 ? and north latitude 46 - 48 ?. aims of the project are providing water to petrol and chemical industry of daqing and living water. at the same time it is also a big comprehensive conducting water project without dam which resolves 24 irrigation regions of beiyin using water along beiyin

    黑龍江省北部引嫩工程於黑龍江省西部,地處嫩江中游左岸的松嫩平原腹地,地理置在東經126度128度,北緯46度48度之間。該工程以滿足大慶石油和化工生活用水為主,同時解決沿途24個分灌渠用水的綜合性大型無引水工程。
  8. You may take an optional cruise on lake powell, with a shoreline of 1960 mile to navajo indian reservation. arrive at the mountain valley in the afternoon. mammoth monoliths and immense rock spires stretch heavenward from the desert floor

    早上驅車前往參觀於大峽谷上游科羅拉多河上的榕林峽谷水,偉大的水利工程,造福了三百萬亞利桑那州的居民同時,可以自費乘船游覽包偉湖,其湖岸線長1960英哩,其中有96個峽谷,猶如將大峽谷搬到湖上一般。
  9. Firstly, the status of our nation ' s water resources, flood and arid hazards is overviewed to illustrate the necessity for study on dynamic control of flood season limited water level. disadvantages in traditional limitsd water level design, static control of limited water level design, static control of limited water level and fuzzy limited water level curve are pointed out, and mending methods for these are introduced. dynamic control and its key problems are analyzed hi next section. the allowable range of limited water level is determined, so as the allowable extreme risk index. the definition of extreme risk is re - illustrated, risk analysis methods in reservoir operation is discussed either. according to the definition of extreme risk rate, the allowable extreme risk rate of reservoir is systematically demonstrated with variant extreme risk indexes and flood season limited water level

    本文首先闡述了我國水資源狀況和水旱災害、說明水庫汛期限制水動態控制研究的必要性;介紹了傳統汛限水設計、汛限水靜態控制、模糊汛限水過程線存在的問題及其初步改進方法;分析汛期限制水動態控制的方法及關鍵問題;進一步闡述了水庫極限風險率的定義;根據極限風險率定義,詳細敘述了不同極限風險指標時、不同汛期限制水下起調,水庫所能承受的極限風險率計算方法。然後,基於極限風險率計算方法,以白石水庫為背景,研究「考慮體自身安全、考慮體安全與下游防護對象控制下泄流量的汛限水動態控制的極限風險率」 。
  10. This complex is located near the intersection of northeast-trending littoral marine bars and a southeast-trending delta system.

    該復合體於北東走向的濱海沙與南東走向的三角洲體系交匯處附近。
  11. With the mechanics simulation of temperature load and time independent, it is on time made to monitor the corresponding load displacement field and the change tendency at any time, and is monitored the dam work regularity

    並對溫度和時效進行力學的模擬,使其及時監測在任何時刻所對應荷載的移場和變化趨勢,從而監控大的運行性態及規律。
  12. There will eventually be a total of 12 turbines on the right side of the three gorges dam, which is in the midsection of the yangtze, china ' s longest river

    三峽大右側未來一共將有12個水輪發電機組。三峽大壩位於中國最長的河流長江的中段。
  13. A dam constructed across a stream to raise the water level so that the overflow will have sufficient power to turn a mill wheel

    磨坊水橫跨溪流建造的堤,以提高水使溢滿的水有足夠的動力轉動磨坊的水輪
  14. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江河口,動力強勁,破壞力極大.回顧錢塘江河口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江河口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮水比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代」和丁頭保護等工程措施.分析錢塘江河口大規模治江圍塗后對錢塘江河口潮汐、洪水、河床以及杭州灣北岸深槽的影響
  15. From the site explorations, tentative sketches can be made of the dam location and project features such as power plants.

    通過址查勘,就能繪制置和工程附屬建築物如發電廠方的示意圖。
  16. So as the enter point of the stream, the income of the reservoir, the time of the flood peak lasted, the quantity of sandiness income and the strobe of the darn. we must do some work to forecast and watch the different density stream. by experiments, we made out that it is impo rtant for us to reduce the water lever in work of the river belongs lots of sandiness

    從異重流試驗看,在正常運用下,水庫產生泥沙異重流的機率較大,能否運動到前排出庫外,還要看異重流潛入點置、入庫流量、洪峰歷時、入庫含沙量、水庫閘門運用等因素,需要做好異重流預報監測工作。
  17. Study on the predictive model of hongmen dam displacement and safety control index

    洪門大壩位移預報模型與安全監控指標的研究
  18. Olive dam locate in from permit scene flood along lan dark blue river direct current 37 kilometers of place, it can be reached that contract needs 1 hours

    橄欖壩位於從允景洪沿瀾滄江順流而下37公里處的勐侖鎮,約需1小時就可到達。
  19. Inverse analyses of arch dam displacements using improved parallel genetic algorithm

    基於并行改進遺傳演算法的拱壩位移反分析
  20. Construction has already started. the dam will be about 6, 860 feet wide and 611 feet high, at a spot called sandouping near yichang

    工程建設已經起步,大壩位於宜昌附近的三斗坪,寬約6860尺,高約611尺
分享友人