壩基 的英文怎麼說

中文拼音 []
壩基 英文
dam foundation; the base of a dam壩基滲漏 leakage of dam foundation
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站位於西雅礱江的三灘至手爬溝河段,型為305米高雙曲拱,正常蓄水位標高1880米。址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. Study on influences of asymmetry on arch dam foundation

    壩基礎不對稱性影響研究
  3. Leakage in a dam foundation may sometimes be overcome by digging deep into it so as to build a cutoff wall into the foundation.

    壩基漏水的現象,有時可以用深挖地建造堵截水墻的辦法來克服。
  4. Based on total stress index of property of statics and dynamics of dam body and dam base materials which obtained from test, utilizing duncan - chang hyperbola model and equipollence linearity model to analysis static state and dynamic stress state affected by earthquake of hada mountain dam body and dam base

    根據試驗得到的體和壩基材料的靜動力學性質的總應力指標,計算中採用duncan ? chang雙曲線模型和等效線性模型,分析了哈達山體和壩基的靜應力狀態以及它們在地震作用下的動應力狀態。
  5. The information refers to slopes in opencast mines, quarries, dam foundation excavations and highway outs.

    這份資料提供了有關露天礦、採石場,壩基和公路塹的邊坡資料。
  6. In this article, seepage and stability against deep sliding are studied and discussed in detail as regard to dongzhang dam which has glacis weak surfaces in the dam foundation, some valuable results are obtained

    本文結合壩基含有緩傾角軟弱夾層的東張水庫大工程,對壩基滲流及抗滑穩定性問題進行了較為深入的研究,得出了一些有意義的結論。
  7. Finally, the stress and strain distributions of dam foundation in which there have glacis weak surfaces are studied by means of nonlinear fem. with deducing parameters of weak surfaces gradually, stability of the dam against deep sliding is verified. therefore safety of dam and foundation would be estimated

    5 、運用非線性有限元法研究了東張水庫重力含有緩傾角軟弱夾層的壩基應力、應變情況,用逐步降低夾層材料參數的方法核算大的抗滑穩定,以此評價大壩基的安全性。
  8. Study on seepage stability of a gravity dam foundation

    某水庫壩基滲透穩定性研究
  9. Past investigation found the rock in the right dam foundation composing of granite ( _ 4 ~ 3 _ 5 ~ 1 ) in dyas - trias, which has a very complicated mechanical environment. the complicated phenomenon is as follows : tectonism, alteration, rock mass demobilize, rock mass stress release and other factors. because of this several weakness rock zones and a loosen rock mass zone are develop in the right dam foundation

    前期的調查表明其右岸巖體力學環境復雜,表現為:構成右岸壩基(肩)巖體主體的二迭三迭紀花崗巖( _ 4 ~ 3 _ 5 ~ 1 )受構造變動、蝕變、風化卸荷等因素的影響形成了壩基軟弱巖帶和肩上部卸荷鬆弛巖體。
  10. In the dam foundation restraint area, mgo can be mixed into concrete to prevent dam longitudinal crack. research on autogenous volume change of rcc mixed with mgo, and research on thermal stress compensation of darn foundation prove that rcc mixed with mgo plays a role in dam crack control

    在材料措施方面,深入研究高碾壓混凝土壩基礎約束區採用外摻mgo措施,利用其微膨脹性能補償體降溫過程中產生的溫度應力,以防止大縱向裂縫的發生。
  11. Finally, respect to the beam effect induced by special high ratio of modulus of elasticity of baise gravity dam, the sensitivity analysis are carried out to study the relation among displacement, stress state of dam and rock bed parameters

    最後,針對百色重力特殊的高彈模比地質條件所致懸臂效應,對體及壩基的變形和應力狀態與壩基力學參數之間的關系進行了參數敏感性分析。
  12. The article discusses the strength analytical method of soil body dynamic stability apply to evaluate foundation liquescence of embankment dam combine with shock liquescence of dam foundation blanket sand layer about hada mountain project

    本文結合哈達山工程設計中壩基沖積砂層的震動液化問題,探討了土體動力穩定性的強度分析方法在評價土壩基液化中的應用。
  13. In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up. secondly, based on the well constructing technique which was discovered under the condition of in - situ bumping test and calculating the dewatering scheme of the two dewatering units with the calculation model, the final dewatering scheme was put forward. at last, the final dewatering scheme was appraised by observation during the construction, and it satisfied with the construction request

    本文主要通過壩基現場抽水試驗試驗資料整理,在揭示黃土壩基降水特性規律的礎上,確定可以反映現場抽水條件的的實用降水計算模型和參數;再根據現場抽水條件試驗開發的成井技術和計算模型計算壩基肩兩個水文地質單元的降水井方案,並按工程類比法確定最終的降水方案;最後,通過施工過程中的觀測情況對降水方案進行評價,降水方案能夠很好地滿足施工的要求。
  14. The characteristic of chemical grouting material should combind with construstion method directed by the theories, it is necessity guarantee for the good result in some special cases. by cw series material, various complicated engineerings have been successfully handled, such as the treatment of concrete fine cracks in three gorges project ( tgp ), foundation reinforcement to the fault in in three gorges project ( tgp ), and the seepage control and reinforcement for the dam base of jiangya hydropower - station. these illustrations are provided to proof the advantages of modified epoxy resin and its technique

    化灌材料特性與理論指導下的灌漿工藝的全面結合是化灌處理,特別是特殊條件下灌漿效果的必要保證, cw系改性環氧化灌漿材及技術對多種復雜工況工程處理對象成功處理,解決了三峽混凝土微細滲水裂縫防滲補強、三峽工程地質斷層泥化夾層加固以及江埡電站壩基溶蝕帶防滲等一系列工程技術難題,印證了該材料及技術的先進性。
  15. Foundation consolidation grouting treatment of xin ' anjiang dam

    新安江大壩基固結灌漿補強處理
  16. Inspection of xiluodu hydroelectric power station dam foundation consolidation grouting test

    溪洛渡水電站壩基固結灌漿試驗檢測
  17. Test process of consolidation grouting without ballast in dam foundation of goupitai hydropower station

    構皮灘水電站壩基無蓋重固結灌漿試驗工藝
  18. The cutoff wall near the dam axis, the consolidation grouting and the curtain grouting for the foundation, and the high pressure jet - grouted cutoff wall at the toe of the dam form a vertical anti - seepage system for the dam foundation

    軸線附近的防滲墻、巖固結和帷幕灌漿,以及上游腳處的高壓擺噴防滲墻,在壩基構成了垂直防滲體系。
  19. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩基處理和防滲的原則及設計要點.趾板礎和堆石體各區砂礫石礎開挖,除趾板與其下游1 / 9底寬范圍以及腳挖除沖積層至弱風化(局部微風化)巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石的設計和研究提供參考與借鑒
  20. With regard to its field drilling applications in the geologically loose sandy pebble layers, kl vegetable - gum drilling fluid showed itself with excellent rheological behaviours in its abilities of lubrication, lost circulation, suspension and removal of debris, anti - shear shinning, and high coring rates, which satisfactorily meet the demands of geological boring in the dam foundation of huangjin ping hydroelectrical power plant

    通過在黃金坪水電站壩基深厚砂卵石覆蓋層鉆探取芯的現場試驗,證明了kl植物膠沖洗液具有優良的流變特性,潤滑、堵漏、懸浮排除巖屑和抗剪切稀釋能力顯著,可實現高取芯率,能很好的滿足地質鉆探對取芯質量的要求。
分享友人