壩接頭 的英文怎麼說

中文拼音 [jiētóu]
壩接頭 英文
abutment of dam
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : Ⅰ動詞1 (靠近;接觸) come into contact with; come close to 2 (連接; 使連接) connect; join; put ...
  • 接頭 : 1 (連接起來) connect; join; joint 2 (找人聯系) contact; get in touch with; meet 3 (了解情況...
  1. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用永久性免拆金屬模板網作為一期混凝土模板;鋼筋連改進傳統的電焊連方式,採用大量採用鋼筋機械連技術,有效提高了強度和鋼筋連速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一流工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐久性。
  2. At the same time, as a result of human activity and natural matters etc, the falling and breakage of dams, bridges, docks happened frequently, which influence the economy development of fuzhou and people ' s living in this area

    同時,由於人類活動、以及自然問題等諸多原因,導致沿江兩岸二連三發生堤、橋梁、碼等建築物的崩塌和破壞,嚴重影響了福州市的經濟發展和兩岸人民的正常生活。
  3. In the light of the characteristics that the joint parts between the concrete rigid - frame structure and steel box arch ring of caiyuanba changjiang river bridge in chongqing mainly work as the compressive elements, the design of the parts is carried out by means of improving the steel plates, and the design methods and local details design of prestressing steels are put forward in order to ensure the safety of the bridge structure

    摘要針對重慶菜園長江大橋混凝土剛構與鋼箱拱主要為受壓構件的特點,採用改進鋼板形式進行設計,提出預應力鋼筋的設計方法及局部細節設計,確保結構安全可行。
  4. From the tai mei tuk peninsula, a 1. 25 - mile long dam was to be built across the strait, to connect it with the small island of pak sha tou. this would change the shoreline and create a man - made lake measuring 3. 5 miles long, 1 mile wide and 2, 950 acres in surface area. the seawater would be pumped out before it could be used to store fresh water

    25哩的水,橫越海峽,連大埔海岸對開半島白沙洲,改變原來的海岸線,使之成為一個長3哩半、闊1哩、面積達2 , 950英畝的海濱之湖,再將湖內海水抽乾,儲存淡水。
  5. On 10 march 2006, the western kerbside lane of wing shun street from its junction with yi hong street to its joining point with ma tau pa road will be designated a restricted zone for goods vehicles from 7. 00 a. m. to

    時起,永順街由其與怡康街交界處起,至其與馬道的合點止的西面路旁行車線,每日由上午
分享友人