壩的心墻 的英文怎麼說

中文拼音 [dexīn]
壩的心墻 英文
core of dam
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : 4次方是 The fourth power of 2 is direction
  • : 名詞(磚、石等築成的屏障或外圍) wall
  1. Construction of rockfill dam with asphalt concerte core wall

    瀝青混凝土堆石施工
  2. Applying placement asphalt concrete core wall in rock - filled dam

    澆築式瀝青混凝土在堆石應用
  3. Adaptability of pouring asphalt concrete core wall for earth - rock in cold region

    土石澆築式瀝青混凝土在寒區適用性
  4. Applied techniques for the asphalt concrete anti - seepage wall

    澆築式瀝青混凝土堆石應力分析
  5. Broken gravel soil as impervious material for rockfill dam with core

    石土作為堆石防滲土料初步研究
  6. Using the three ? arameter solid model and the burgers four - parameter model to fit the creep curve separately, it was found that the burgers model can describe the creep process more well, and then provide parameters for finite element analysis of asphalt concrete cores for embankment dams

    用三元固體模型和burgers四元模型來擬合瀝青混凝土蠕變曲線,發現burgers模型能夠更好描述瀝青混凝土蠕變過程,為土石瀝青混凝土有限元計算提供參數。
  7. Hada mountain embankment dam is located at strong motion earthquake area with 7 degree. it is a sand - fill dam with clay core, stability of the dam under earthquake and the preventive of foundation liquescence is very important for the dam design

    哈達山土是位於七度地震區,坐落在厚覆蓋層上粘土砂殼抗震穩定、基礎抗震液化是本工程技術關鍵問題。
  8. The dispersibility as well as seepage distortion and salt transference under long - term seepage condition of soil samples obtained from the clay core wall in xijiao and sanping reservoirs were studied by physical and chemical properties of soil and composition of clay mineral and the tests for identification of dispersive clay soils which included double - hydrometer test, pinhole test, crumb test, tests to defermine salt content of pore water and percentage of exchangeable sodium

    摘要應用碎塊、針孔、雙比重計、孔隙水可溶鹽和交換性鈉百分比等五種試驗方法,結合物理化學性質和礦物成分分析,對西郊、三坪兩水庫大土樣進行了多種方案分散性試驗及長期滲流條件下滲透變形試驗和鹽分運移試驗。
  9. According to status of mengshan clay core dam in zibo, shandong province, using numerical value analysis theory and technique of dam construction, this paper put forward efficiency strengthen method hi the base of study and analysis

    本文結合山東省淄博市萌山水庫具體情況,利用數值分析理論及土石加固新技術,在深入分析研究基礎上,提出相應有效,可行加固措施。
  10. In order to understand the characteristics and mechanism of flow washout for the crevice of core wall in earth - rock dam, according to the exemple of crack washout test for the core of heihe dam, constant water level washout test and changing water level washout test are adopted differently, the process of test and the character of the flow washout for the core crack are gone into particulars

    摘要為了解水流沖刷作用下反濾層對土石裂縫發展保護作用特點和機理,以黑河土石裂縫沖刷試驗為例,分別採用常水頭和變水頭兩種方法,探討了土石裂縫在水流沖刷過程中特點。
  11. Taking the earth - rock dams with straight clay core constructed on thick moraine cover foundation and directly built on bed - rocks with the same sizes and the same materials for example, two - dimensional dynamic fem programme is used to contrast and analyze the static stress distribution and dynamic response difference of two types of high earth - rock dams in the intensive earthquake zones

    摘要以相同尺度和相同材料建造在深厚覆蓋層上直土石和直接建設在基巖上土石為例,採用二維動力有限元程序對比和分析了強震區兩種高土石靜應力分佈和動力反應差異。
  12. Preliminary research on creep and dynamic characteristics, which are two important properties of asphalt concrete cores for embankment dams, through triaxial compression creep tests and dynamic triaxial test with the aid of the viscoelastic theory and the soil dynamics theory

    本文通過三軸壓縮蠕變試驗和振動三軸試驗,藉助粘彈性理論和土動力學理論,對土石瀝青混凝土材料兩個重要性質? ?蠕變性能和動力特性進行了初步研究。
  13. The construction techniques and mechanics are approaching or even reaching the international advanced level in the asphalt concrete impervious deck of the recent completed tianhuangping pumped - storage hydroplant and the counter dam in the yangtze river which is being built with the height of 104 m, the volume of asphalt concrete core of 5x104m3

    最近建成天荒坪抽水蓄能電站上庫瀝青混凝土防滲面板和正在建設高104m 、瀝青混凝土方量達5萬多m ~ 3長江三峽水利樞紐茅坪溪防護工程,施工工藝和施工機械化程度已達到或接近國際先進水平。
  14. An approach to high rockfill dam core anti - crack measures

    高堆石抗裂措施探討
  15. In this project, the maximum height of the dam is 81m, but the deep overburden in the riverbed has the depth of 147. 95m which is about two times of the maximum height of the dam body, so the seepage and liquefaction prevention of the dam foundation becomes the key and important problem in the design of the dam project. the static stress and deformation under three different projects - horizontal blanket project, clay core project and asphalt core project - for the dam is analyzed comprehensively. the damage that may be induced by variable factors on the dam body in time of engineering completion and water impounding operation period is seriously studied

    其次,將這一模型用於分析下坂地水利樞紐工程,由於該工程河床覆蓋層深度最深達147 . 95m ,是體高度近兩倍左右,滲流和液化成為體安全主要問題,本文對該三種設計方案即水平鋪層防滲方案、粘土防滲方案及瀝青防滲方案靜態應力位移及體在竣工期、蓄水期等各個階段可能產生破壞進行了認真研究。
  16. The choice dam type is especial importance, during the designed research of the rock - fill dam, particular under the rock - fill dam with very deeply cover layer, the stress and strain of the middle wall and cutting interpenetration wall of the dam foundation is mostly sensitive, whether the. design of dam is scientific and reasonable, it is very important for cutting interpenetration and stability of the dam, the article offer the reference for the design of cutting interpenetration in the foundation with deep cover with earth the water conservancy in xiaban zone, based on the study and analysis the design of cutting seep in the foundation with deep cover with earth, cutting interpenetration concrete wall and the joining model of cutting interpenetration material in body of dam and the applying effect in the practical worko based on the foundation which absorbed and summarize the achievement of design and research in the inter and outer country, for the project of the clay vertical middle wall and vertical cutting interpenetration, the asphalt concrete vertical middle wall and vertical cutting interpenetration the clay inclined middle wall and the lever carpet layer cutting interpenetration, respectively in terms of the different stage of complete period sluice period and working condition, adopting nonlinear calculate and analysis with the finite element method ; carrying the analysis and study with the 3d finite element method as to the different joining model of the left bank high slope cutting interpenetration body and the foundation concert cutting interpenetration wall ; carrying the analysis and study with the 3d finite element method as to the effect of the wall stress and strain because of the different elasticity modulus of the concert cutting interpenetration wall through the analysis and study with the different project. have comparatively all - around comprehended the various model dam, particular the distribute rule of stress and strain of the cutting interpenetration system, provide for the important evidence of the plastic area size the join model of the foundation cutting interpenetrate wall and dam body cutting interpenetrate system the choice of the dam model and the design of the structure of the dam body, the result of research and advice have very importance value in design and building for the similarity project

    工程設計中,選取顯得尤為重要,特別對于基有深厚覆蓋層堆石基防滲應力和變形是體、基最敏感部位,設計方案是否安全、科學和合理,對大防滲和穩定起到至觀重要作用。本文研究分析了國內外深厚覆蓋層基礎防滲設計、基混凝土防滲體防滲體銜接形式及工程實際應用效果,為下坂地水利樞紐工程深厚覆蓋層基礎防滲設計方案選擇提供了參考;在吸收和歸納了國內外堆石設計研究成果基礎上,對粘土基垂直防滲方案、瀝青混凝土基垂直防滲方案以及粘土斜基水平鋪蓋防滲方案,分別按竣工期和蓄水運行期不同工作情況進行了有限元非線性計算分析;對左岸高陡邊坡防滲體與基礎混凝土防滲不同結合型式進行了三維有限元靜力計算分析和研究;對混凝土防滲不同彈性模量對體應力和變位影響進行了三維有限元靜力計算分析和研究。通過對不同方案計算分析和研究,比較全面了解了各方案體,尤其是防滲體應力和變形分佈規律,為型選擇、體結構設計、基礎防滲體防滲體結合型式以及塑性區大小確定提供了重要依據。
  17. There are many main buildings in the plant such as concrete - faced rockfill darn, the second darn with clay core, spillway, diversion tunnel, surge tank, ground workshop and switch mom etc

    電站主要建築物有砼面板堆石、粘土、溢洪道、引水隧洞、調壓井、地面廠房和開關站等。
  18. So far as the mixing material for building the earth - rock fill dam with clay core for shiquanhe hydropower station is concerned, the effect from the variation of the sand content for the filter material on the maximum dry density and the relevant parameters are to be determined within the variation area of the mixing mass ratio of ( 46 ~ 54 ) : ( 54 ~ 46 ) through this experiment, due to the max, dry density is largely influenced by the mixing ratio of both the lifter material and the clay and the sand content of the filter material, so as to determine the actual filling compactness of the mixing material of the core

    摘要由於獅泉河水電站粘土土石摻合料最大幹密度受反濾料與粘土料摻合比例、反濾料含砂率影響較大,因此擬通過本試驗確定摻合質量比在( 46 ~ 54 ) : ( 54 ~ 46 )范圍變化時,反濾料含砂量變化對最大幹密度影響程度及相關參數,從而確定摻合料填築實際壓實度。
  19. Determination of compaction parameters of clay - core dam of ni ' erji reservoir

    尼爾基水利樞紐工程粘性土料壓實參數確定
  20. Study on influence of fault dislocation on a core rockfill dam

    基巖斷層錯動對堆石影響研究
分享友人