壩長 的英文怎麼說

中文拼音 [zhǎng]
壩長 英文
dam length
  • : 名詞1 (攔水建築物) dam2 (固堤建築物) dyke; embankment 3 [方言] (沙灘; 沙洲) sandbar; sandba...
  • : 長Ⅰ形容詞1 (年紀較大) older; elder; senior 2 (排行最大) eldest; oldest Ⅱ名詞(領導人) chief;...
  1. After like near future arrowroot continent dam flies a shop sign afresh go situation and to the limit of one ' s capacity rises should notice early days goes situation, if be pulled considerably, magnify again quantity, be about vigilance is banker shipment ( this time may be a few longer, banker is sucked prepare time to grow more, shipment time is long ), island visitting extensive region goes situation ( be about in first time to the limit of one ' s capacity first shipment ) if early days is to pass dish of full share, ( at present the individual thinks to have treasure new the sources of energy ) in the to the limit of one ' s capacity when breaking through strong line or resistance line but follow - up, that ability is really true the quantity adds valence to rise dropping is not must to the limit of one ' s capacity, and shrink the volume drops consequence is more serious, because early days banker already gave money, basically be, use odd amount to be bungled again dish, medicinal powder door meet disastrous

    如近期葛洲重新開牌后的走勢而放量上升要注重前期走勢,假如大幅拉升后再放大量,就要警惕是莊家出貨(這個時間可能比較一些,莊家吸籌時間越,出貨時間就) ,看看寰島走勢(在第一次放量就要先出貨了)假如前期是經過盤整的股票, (目前個人認為有寶新能源)在突破勁線或阻力線時放量就可跟進,那才是真真正正的量增價升下跌不是一定要放量,而縮量下跌後果更嚴重,主要是因為前期莊家已出完貨,利用剩餘數量再砸一下盤,散戶就會損失慘重!
  2. Impermeable wall of the dam is very long, so the task is burdensome

    由於堤防滲墻度很大,因此檢測任務繁重。
  3. The main sedimentary microfacies are submerged distributary channel, debouch bar, submerged natural levee and flood - plain splay. the research shows that the physical property of subermerged distributary channel sandbodies are the best and debouch bar comes second

    4 + 5262油層砂體的沉積微相類型主要有水下分流河道、河口、水下天然堤和水下決口扇等,其中水下分流河道砂體的物性相對最好,其次為河口砂體。
  4. Relationship between the tolerance loss value of soil and the weathering and denudation rate of parent rock

    江三峽區風化花崗巖土壤為例
  5. The analysis of the influence of the degan gravel pits on riverbed development

    江上游德感采砂坑對河床演變影響分析
  6. The effect of groyne length and layout on water surface is analyzed in the paper. based on the results of simulation and experiment, the local energy loss of the flow due to the groyne is studied. consequently the surface variation and height of damming are also analyzed

    論文分析了丁壩長度與布置對水面線的影響,根據流場、紊動場模擬結果和實驗結果研abstract究丁造成的水流局部能量損失,並對水面變化和丁奎水高度進行了分析。
  7. You may take an optional cruise on lake powell, with a shoreline of 1960 mile to navajo indian reservation. arrive at the mountain valley in the afternoon. mammoth monoliths and immense rock spires stretch heavenward from the desert floor

    早上驅車前往參觀位於大峽谷上游科羅拉多河上的榕林峽谷水,偉大的水利工程,造福了三百萬亞利桑那州的居民同時,可以自費乘船游覽包偉湖,其湖岸線1960英哩,其中有96個峽谷,猶如將大峽谷搬到湖上一般。
  8. The south part was slope and deep floor of the lake, and the north part was a broad shallow - water platform of the latchstring shore. in the north part, chang - 6 and chang - 7 oil - bearing beds of yanchang formation were typical shallow - water platform delta with an incomplete progradational sequence, in which the delta plain facies were well developed and the river - mouth bars were not developed

    受沉積基底地形的嚴格控制,發育于淺水臺地背景上的延7 ?6油層組表現出典型的淺水三角洲沉積特徵,具有發育的三角洲平原沉積,而前緣河口不發育,剖面上難以形成完整的進積序列。
  9. Taking the caiyuanba changjiang river bridge in chongqing as an example, this paper makes a study of the effect of tilting angle of basket handle arch rib on the stability of the overall arch bridge and gives the rational tilting angle of the arch rib, using the finite element method

    摘要以重慶菜園壩長江大橋為例,利用有限元方法研究提籃拱的拱肋側傾角對全橋穩定性的影響,給出拱肋的合理側傾角。
  10. Corrosion protection of steel truss girders of caiyuanba changjiang river bridge in chongqing

    重慶菜園壩長江大橋鋼桁梁防腐
  11. This paper presents the corrosion protection system and part of the coating workmanship for steel truss girders of the caiyuanba changjiang river bridge in chongqing

    摘要介紹重慶菜園壩長江大橋鋼桁梁的防腐體系及部分塗裝工藝。
  12. The upper reservoir had a concrete dam 400 ft. long and 138 ft. high with a storage of 175, 000, 000 gallons. the dam of the lower reservoir was modified and reconstructed from that of the former tai shing paper manufacturing co.

    建成後分上、下兩個水塘,上塘是用混凝土築堤壩長400尺,高138尺,存水量為1
  13. The office has required that a thorough inspection on embankment security be conducted instantly to prevent possible backlash

    盡管中游水位已經開始下降,但是,由於堤壩長期被水浸泡,新的險情隨時會發生。
  14. And, we also have had the relation between the size of the horizontal circulation regions and the fr number around the dike for the flow - deflection method. the results of this study show that, using the method of flow - deflection or " sucking - spouting " water, the flow pattern can be improved, the size of the horizontal circulation regions and the sedimentation volume caused by the horizontal circulation can both be reduced. so, they can be adopted to improve the navigation condition of upper approaching channel of three gorges project, which could guarantee the safety of navigation

    通過試驗,得到了以下創新的成果: 1 、不加吸、噴水時,丁后的迴流度約為丁壩長度的8倍; 2 、加吸、噴水可以減小丁后的迴流尺度和強度,並得出了有理論根據的吸、噴流量與迴流尺度減小之間的定量關系以及吸、噴流量與丁周圍流速梯度之間的定量關系; 3 、加吸、噴水可以減小迴流淤積,並得出了吸、噴流量與淤積量減小之間的定量關系以及迴流尺度減小與淤積量減小之間的定量關系; 4 、加導流板可以減小丁后的迴流尺度,並得出了丁周圍的水流fr數與迴流尺度減小之間的定量關系。
  15. In nov. 1921, the line from gejiu to caotu was opened. oct. 1928, the branch line from jijie to linan was opened and this line was extended to shibing at oct. 1934. these railway lines were called the gebishi railroad

    該鐵路公司得到鐵路鋪設和礦採的權利,可是因修建資金不足,推退到1915年才開工, 1921年11月完成了個舊經由雞街蒙自到草壩長72 . 2公里的鐵路。
  16. The main structure of caiyuanba yangtze bridge in chongqing, up to date the largest - span tie bar arch bridge, is formed by two side tie bars and one middle tie bar which unite the y - shape rigid framework and arch rid. therefore, tie bars are one of the key components

    重慶菜園壩長江大橋是迄今為止世界上跨度最的系桿拱橋,該橋的兩根邊系桿和一根中系桿將南北兩岸的y型剛構和中間的拱肋連成一個受力整體,構成該橋的主結構,因此系桿是該橋關鍵受力部位構件之一。
  17. The newly - built dam this year is again as long as that old one

    今年新建的水比那座舊水壩長一倍。
  18. When completed the concrete dam was 150 ft. high and was the most magnificent of its kind in hong kong. aside from the main dam, there were three subsidiary dams, 37 kms of catchwaters, a water treatment works in tsuen wan and service reservoirs in lai chi kok, ma tau wei, diamond hill and ngau tau kok

    除主外,還包括了三條副37公里的引水道、配合水塘供水的荃灣濾水廠,以及荔枝角、馬頭圍、鉆石山、牛頭角等配水庫,集水區廣達2 , 000畝。
  19. In the light of the characteristics that the joint parts between the concrete rigid - frame structure and steel box arch ring of caiyuanba changjiang river bridge in chongqing mainly work as the compressive elements, the design of the parts is carried out by means of improving the steel plates, and the design methods and local details design of prestressing steels are put forward in order to ensure the safety of the bridge structure

    摘要針對重慶菜園壩長江大橋混凝土剛構與鋼箱拱接頭主要為受壓構件的特點,採用改進鋼板形式進行設計,提出預應力鋼筋的設計方法及局部細節設計,確保結構安全可行。
  20. On may 8, 2007, we had successfully undertaken the construction of chongqing caiyuan dam bridge ' s pavement

    昨日,從市場開發部傳來好消息,我司中標重慶菜園壩長江大橋鋼橋面鋪裝工程。
分享友人