小鉆機 的英文怎麼說

中文拼音 [xiǎozhēn]
小鉆機 英文
drilling-in unit
  • : Ⅰ形容詞1 (體積、面積、數量、強度等不大) small; little; petty; minor 2 (年紀小的; 年幼的) youn...
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : machineengine
  1. The gremlins have got into the computer again

    搗亂的精靈又進計算里了
  2. With the standardized workshop occupied 11600m2 and 630t hydraulic presses, 315t two axle punch presses, 250 sets of large, middle, small equipments, the company has the whole series production line. main equipments include cut - board machine, incurvate machine, opened incline pressure machine, drill attack machine, auto - moving hang machine, various kinds of moulding plastic machine, lathe, planer, drilling machine, horizontal axis rectangle platform flat grinder, universale lifting platform milling machine, eccentricity axis punching machine, liquid pressure derrick car, etc

    主要設備有: 630噸液壓315噸雙軸沖壓250噸沖壓等大型沖壓床,剪板折彎攻兩用自動走軌起吊各式型號注塑各式車床刨床床臥軸矩臺平面磨床萬能升降臺銑床偏心軸沖床液壓起重車等大中設備386多臺套,形成具有自動沖壓步進的生產線。
  3. Injection mold tooling more than 40 craftsmen, and the daytime hours, night work, machine tools include taiwan sparks seven aircraft, six washing bed, grinder 12 taiwan and size over drilling

    注塑模製模技工四十多名,分日班與夜班工作,工作母計有火花七臺、洗床六部、磨床十二臺及大床多部
  4. After every work day he sat into the small house with his wireless, listening to the chatter of morss, logging and analyzing it, ready for the next day.

    他每天下班后就屋擺弄無線電接收,直到深更半夜。他坐在那裡收聽莫爾斯電碼的響聲,對它進行登記和分析,為第二天的研究做準備。
  5. Abstract : three - stage dust removal system of impinger, centrifugal dust collector, wet fibre - grid scrubber applying to dust collecting of driller in opencut mine is reported in this paper. the operational results show that this system has stable operation, higher dust removal efficiency, less drop pressure and dust concentration of outlet of the system meets emission standard

    文摘:介紹了用慣性除塵器、旋風除塵器、濕式纖維柵除塵器組成的三級串聯除塵系統進行露天礦的收塵,運行結果表明該系統運行可靠,阻力,除塵效率高,系統出口含塵濃度達到排放標準。
  6. The irreparability of the past : once at a performance of albert hengler s circus in the rotunda, rutland square, dublin, an intuitive particoloured clown in quest of paternity had penetrated from the ring to a place in the auditorium where bloom, solitary, was seated and had publicly declared to an exhilarated audience that he bloom was his the clown s papa

    有一回艾伯特亨格勒馬戲團在都柏林市拉特蘭廣場的圓形建築153里演出,一名富於智的丑身穿色彩斑駁的服裝,為了尋找乃父,竟走出馬戲場,進觀眾席中,來到孤零零地坐著的布盧姆跟前,在大庭廣眾之下,向興奮不已的觀眾公開宣稱:他布盧姆是他丑的爸爸。
  7. A new type of mud pump with high flow, high pressure, compactness and light weight is designed for truck mounted water well drill rig, tackling the difficulty in mud pump matching

    為車裝水文水井設計大流量、高壓力、體積、質量的新型泥漿泵,解決其泥漿泵配套難的問題。
  8. Chu added : " i was seldom in the tf3 offices. usually i would be in the office of carrian s liquidator an accounting firm digesting the carrian accounts with the assistance of accountants

    朱敏健補充說:那時候我比較少會回到專案組辦公室,每天只往佳寧清盤人一會計師樓的辦公室
  9. It is used for all series of domestic and overseas machines with a drill diameter, guiding angle, guiding point, large segment grind, small segment grind, furrow grind and starting disc of tungsten carbide

    用於國內外臺碳化鎢頭外徑導角導尖大段研段研溝研開刃等全系列加工。
  10. The plane was late and detectives were waiting at the airport all morning. they were expecting a valuble parcle of damonds from south amaric. a few hourse earlier, someone had told the polic that thieves would try to stolen the damons. when the plane arrived, some of the detectives were waiting inside the main building, while others were waiting on the airfiled. two men took the parcle off the plane and carried it into the custom house. while tow detectives are keeping gurd at the door, two others opened the parcle. to their surpprise, the prisoce parcle was full of stones and sands

    晚點了,偵探們在場等了整整一上午.他們正期待從南非來的一個裝著石的貴重包裹.數時以前,有人向警方報告,說有人企圖偷走這些石.當飛到達時,一些偵探等候在主樓內,另一些偵探則守候在停坪上.有兩個人把包裹拿下飛,進了海關.這時兩個偵探把住門口,另外兩個偵探打開了包裹.令他們吃驚的是,那珍貴的包裹裏面裝的全是石頭和沙子
  11. Dr hawass said the next job for researchers was to study the video tape and plan for further inspections, which could take up to 12 months

    故於電視直播前的兩天,器人早已進入秘道,並用把九厘米厚的石門穿了一個洞。
  12. It also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. in addition, it is also used for drilling small size water wells and high - pressure jet grouting holes. it has been already widely used in various projects such as water power stations in yunnan, guangxi, sichuan and hubei provinces. it has also become the first priority machine for medium - duty anchoring - reinforcing projects in china

    在雲南灣廣西灘糯扎渡及景洪水電站,長江上游的溪洛渡水電站向家壩水電站金安橋水電站,烏江上的洪家渡水電站構皮灘水電站,黃河上的拉西瓦水電站公伯峽水電站,雅江上的錦屏水電站已經大量使用, yg - 80型錨固已成為國內水電站巖土錨固工程中的主力型。
  13. Introduction : not go envy gba 89509 sometimes global popular game drilling to jerry, finally landing to our flash

    不用再去羨慕gba的玩家,全球風靡的掌游戲子終于登陸到了我們的flash世界!
  14. This product is under pressure, small bending radius, the anti - fatigue properties of strong, long life and other characteristics, widely used in metallurgical casting side, oil drilling, engineering machinery, and various types of hydraulic mining extraction machinery

    本產品具有承受壓力高、彎曲半徑、抗疲勞性能強、使用壽命長等特點,廣泛應用於冶金邊鑄、石油探、工程械、礦山採掘及各類液壓械等。
  15. The complete machine has good stability, convenient operation, low noise, good pore forming quality and high drilling efficiency

    穩定性好,操作簡便,噪音,成孔質量好,進效率高。
  16. The filling pile drilling machine of kp2000 type applies to pore forming construction of various architectural base and shallow well with heavy caliber, vertical well of small coal mine, defense engineering bore using and other drilling projects

    Kp2000型灌注樁適用於各種建築基礎成孔施工以及大口徑淺水井、煤礦豎井、國防工程用孔等孔工程。
  17. Analyzed with the developed software, the stress and deformation distributions of f320 derrick and j250 / 42 - k derrick under several working conditions are obtained. the results obtained here are consistent with tha t obtained with supersap93, which illustrates the program is correct and practicable. finally a fem pre - processor and post processor is developed

    本論文用編制的程序分析了f320型和jj250 / 42 - k型石油井架在幾種工況下的應力、變形分佈,及兩種井架的固有模態、屈曲模態和可靠性,所得結果與supersap93的計算結果比較,應力和位移誤差均相差很,說明本程序系統是正確可行的。
  18. The result of simulation of model 8 ? 1 / 2 ? xhp2s bit shows that, the torque on the bit changes randomly, and the degree of the change increases with the increase of the weight on bit ; the change of the torque on the upper part of the drillstring is not so large as that on the string ' s lower part, and the rotary speed of the bit changes smoothly overall

    對8英寸xhp2s頭做了模擬,結果表明,頭處受巖石的阻力扭矩是隨變化的,並有負扭矩出現,扭矩的變化幅值隨靜壓的增加而增加;柱頂部轉盤施加的扭矩變化不如底部劇烈;頭的轉速在局部有較的波動,其總體變化較為平緩。
  19. Metal molding machines include : wire - six, sparks a drilling machine, grinder channel 18, washing bed size 8 and a number of punch, arch - use system, modeling technology and die assembly workers a total of more than 20

    五金制模械包括:線切割六臺、火花打孔一臺、磨床十八臺、洗床八部及大床多部,拱制模人員使用,制模技術及模具裝配工共二十多名
  20. It also used to prevent or solve geologic calamity, such as landslide and rock collapse etc. in addition, it is also used to drill small size water well and high - pressure jet grouting hole

    Yg - 80a適用於水電站工程鐵路公路邊坡大噸位預應力錨固孔排水孔的施工,以預防滑坡巖石崩塌等各類地質災害治理工程也適用於型水井高壓旋噴引孔的施工。
分享友人