尾巴工程 的英文怎麼說

中文拼音 [wěigōngchéng]
尾巴工程 英文
tail construction
  • : Ⅰ動詞1 (急切盼望) hope earnestly; wait anxiously for 2 (粘住; 緊貼) cling to; stick to 3 (爬...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 尾巴 : 1 (動物身體末端突出的部分) tail 2 (尾部) tail like part 3 (無主見、完全隨聲附和的人) servil...
  1. The engineering work load detailed list reckoning method has the advantages of simple, clear, operation easily, remaining the account settlement rarely, etc compared with the present day running unit price budgeting method, which will be the direction of national engineering cost system reform, cost management first, this text states thoroughly the existing problem of the present day national engineering mode and price reckoning method, and the necessity of application right away and the existing problem, and then make a detailed discussion of the principle of quota reckoning and the engineering work load detailed list reckoning, so that we may be safe to draw such a conclusion that the new cost management system of the new price reckoning method is a necessary way to adapt to the international competition

    量清單計價法與目前我國實行的預算單價法相比,有簡單、清晰、可操作性強、不易留結算等優點;是我國造價體制改革的方向。本文首先全面闡述了目前我國造價管理模式和計價方式存在的問題以及現在推行的必要性及存在的問題,進而對定額計價和量清單計價的原理進行了詳細的論述,從而得出實行新的計價方式的造價管理體制是適應國際化競爭的必走之路。然後,對即將實行的量清單計價模式各單位需要面對的風險,提出幾點抵禦風險措施。
分享友人