層站 的英文怎麼說

中文拼音 [céngzhàn]
層站 英文
landing
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電位於西雅礱江的三灘至手爬溝河段,壩型為305米高雙曲拱壩,正常蓄水位標高1880米。壩址區出露的地為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地,為此壩基的防滲成為重要問題。
  2. He was standing on the balcony of the saloon and his face was in deep shadow.

    在客廳的陽臺上,臉上籠罩著一濃重的陰影。
  3. At this moment hurstwood stood before a dirty four - story building in a side street quite near the bowery, whose one - time coat of buff had been changed by soot and rain

    這時候,赫斯渥正在離波威里街很近的一條小街上一幢骯臟的四樓房前。
  4. He speaks the words to burbage, the young player who stands before him beyond the rack of cerecloth, calling him by a name

    他隔著繃了一蠟布89的架子,呼喚著在自己對面的年輕演員伯比奇90的名字:
  5. This study is a post - cruise study of this leg, calcareous nannofossil samples from sites 1146, 1147 and 1148 of leg 184 were analyzed to provide a high - resolution biostratigraphy for this leg and to investigate morphological variation of coccolith genus gephyrocapsa. the main results of this study are : 1. 12 late pliocene to pleistocene bio - events were recognized and 6 zones of martini ( 1971 ) were determined for the upper sediment sequences of sites 1146 and 1148

    本文作為大洋鉆探項目船下后續研究的一部分,對184航次中的1146位和1147 、 1148位的樣品進行了分析和研究,在船上科學家已經建立起的地框架的基礎上進一步加密采樣,對生物事件標志化石類別進行數量統計,進一步確定了12個生物事件在鉆孔中的深度,建立起了兩個位的高解析度的鈣質超微化石生物地框架。
  6. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發電工程;大連船泊集團遠達地產公司的遠達公寓( 22) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗水庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山電力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  7. She still stood at her post, her flushed and perspiring face coated with the corn - dust, and her white bonnet embrowned by it

    苔絲仍然在她的位置上,累得通紅和滿是汗水的臉上落了一麥灰,白色的帽子也被麥灰染成了黃褐色。
  8. Because the chief office has key effect on station ' s development, the paper try to researching systemic on performance appraisal of station chief office in order to promoting its unfaltering development. based on an in - depth discussion of current research and application status of performance appraisal theory, the paper explores its performance appraisal linking with the actual situation of station chief office

    由於基層站段長是鐵路行業的脊樑,並且在相當程度上,對鐵路提高經濟效益、社會效益和逐步發展壯大起著關鍵性作用,因此,本文力圖對蘭州鐵路分局段長績效考評體系進行系統全面的研究,以促進蘭州鐵路分局穩步發展。
  9. A crowded car with a load near a preset value will bypass hall calls in order to maintain maximum operation efficiency

    如轎內擠滿乘客,或負載接近預定值,為保持最大運行效率,該轎將自動越過召喚層站
  10. Considering synthetically the elevator running characteristics, a new evaluating function for the elevator group control system ( egcs ) is suggested. a kind of fuzzy neural network is used in the elevator group algorithm. the fitness of each elevator servicing the hall call signal is deduced, so the elevator is dispatched reasonably

    綜合考慮電梯運行特性,提出一種新的電梯群控系統( egcs )評價函數,並用模糊神經網路的電梯群控演算法推出各電梯響應層站召喚信號的適合度,從而達到電梯的合理調度。
  11. You must not stand on the steps or the upper deck

    不可在電車的梯級或上層站立。
  12. The thesis analyzes empirically management information system of safety statistics in hengdaohezi branch of train affairs, which provides new method to compare safety statistical information on real time and in automation for primary level station

    4 、對橫道河子車務段安全統計管理信息系統進行了實證分析,為基層站段實施安全統計信息的實時對比、自動對比、科學化管理提供了新的思路。
  13. According to the situation request, we combine with the fact on the railway for the time being, raised the whole views and suggestions to the railway improvement, the first : to realise railway shareholding entreprises is the basic way of railway improvement winder the public ownership circumstance, the second : it is gotton the whole locatim to the function of ministery of rail ways, railway bureau. the branch of railway bureau and the units of railway department, it is designed the whole developing frame that the funtion of ministry of railways is macro - controler, the railway bureau or its branch is management substance which ouur legal qualifaction the unit of railway department is the basic product unit, the third : it describes kinds of faults on the present four level management, and tolal the data auording to the fact

    根據形勢要求,結合目前鐵路的實際情況,對當今鐵路的改革提出了整體的看法和建議:第一、實現鐵路企業股份制是公有制條件下鐵路改革的根本出路;第二、對鐵道部、鐵路局、鐵路分局、基層站段的功能給予了整體的定位;設計了鐵道部的功能是宏觀調控者,鐵路局或分局為法人代表的經營實體,基礎段為生產基本單位的整體改革框架;第三、對目前四級管理體制的種種缺陷作了描述,並根據實際情況進行了數據統計。
  14. Standing in the crossroads leading to future, the top management of company must make a painful choice. if you choose unchanged, it will be a dead road ; but if you choose changed, it may be a dangerous decision

    公司的管理高層站在通往未來的十字路口,必須做出痛苦的抉擇? ?不變革,是等死;若變革,則可能是找死。
  15. Mackerel steaks with out skin are packed in 100 grams net weight printed multy layer stand up pouches with vegetable oil and salt. self life 2 years at ambiant temperature

    鯖魚塊與皮膚出被裝入100克凈重印刷多媒體層站立袋蔬菜油和鹽.自壽命2年常溫
  16. The service function of assigned floor can be cancelled by manual to timer switch

    通過轉動安裝在特定樓上的鑰匙開關(可選擇) ,可對某些層站停止服務。
  17. Intellectual door machine system and microcomputer controlled new type non connecting bar structure can automatically adjust the door speed and torque according to actual door load of each stop and let passengers feel respect and enjoyment when the door open or close

    智能化的門機系統,運行微機控制的新型無連桿式結構,可根據各層站的實際門負載條件自動調節門速和扭矩,在門的開合之間,讓乘客體會到尊貴與享受。
  18. Various cars and landings of ford passenger lift have equipped with computer control system ( cpu ). it connects through the serial transmission line. it greatly lowers down the connection lines and interfaces between various components. all the computers have been allocated with the diagnosis program and back - up system. every computer also sets the software with reasoning capabilities. it extends the man - lift interfaces

    福德乘客電梯,在各個層站和轎廂,均設有電腦控制系統( cpu ) ,並通過串列傳輸線進行連接,大大減少了各部件之間的連接線和介面,各電腦之間所配有的診斷程序和后備系統,每一處電腦還專門設置了具有推斷能力的軟體,擴充了人梯介面。
  19. Controls, to automatically render data from a data source that represents hierarchical site navigation data

    控制項)可以自動呈現表示分層站點導航數據的數據源中的數據。
  20. As a result, classes that implement a site map provider for a hierarchical site map structure, such as

    因此,為了導航整個次結構樹,為分層站點地圖結構實現點地圖提供程序(如
分享友人