崩解巖 的英文怎麼說

中文拼音 [bēngjiěyán]
崩解巖 英文
frangite
  • : 動詞1 (倒塌; 崩裂) collapse 2 (破裂) crack; burst 3 (崩裂物擊中) hit 4 [口語] (槍斃) shoo...
  • : 解動詞(解送) send under guard
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • 崩解 : (物理風化) disintegration; sputtering
  1. It may develop in place by the decay and disintegration of bedrock.

    它可能是通過基的腐蝕和就地生成的。
  2. A study on calving property and softening damage parameter of grs

    花崗殘積土的性及軟化損傷參數研究
  3. Weathering prepares the rock for transport by decomposing and disintegrating it.

    風化作用通過分準備了要搬運的石。
  4. Application of caving mining technology with bottom under condition of flat dipping mid - thick body and unstable rock caused the most of trench and bottom drift, located in abutment, to be destroyed and low recovery in south area, xishimen iron mine

    摘要在緩傾斜中厚礦體底板性不穩固的條件下,採用有底柱落法,由於電耙道大多處于空區邊部應力集中的部位,致使塹溝及底部結構巷道破壞嚴重而使回收率極低,採用無底柱落卸壓則可有效決上述難題。
  5. Standard test method for slake durability of shales and similar weak rocks

    油頁和類似弱石抗持久性的標準試驗方法
  6. The top of it is flat, the neck is a bit thin and the thinnest part is only seven metres in diametre

    海拔1200餘米,相對高度128米,由風化和重力作用而形成的巨型花崗石柱,峰身上有數道橫斷裂痕,但經過億萬年風雨,依然屹立不倒。
  7. Because of the little content of montmorillonite in the red bed weak rock, the contents of illite show fine correlation with slaking durability of the rock, which indicates that unstable clay minerals always have deep influence on the slake durability of weak rock

    因為紅層軟中蒙脫石含量少,因此在各種成分中伊利石含量對紅層軟性影響最大,說明水理特性不穩定的礦物含量始終是影響軟的主要因素。
  8. The analysis shows that, compared with mineral and chemical component content, the granularity fractal characteristics have higher correlative degrees with slaking durability, which reflects that the deposit environment influences slake durability deeply than other factors

    分析發現,與成分相比,紅層軟的粒度分佈分形特徵參數與特性具有更高的關聯度,表明沉積形成時的環境決定了成后的紅層軟性強弱。
  9. On the basis of a full investigation and study and an integrated analysis of the geological setting and rock - mass mechanical environment of the bank slopes of the hydroelectric project area on the mainstream of the jinsha river and by combining the qualitative analysis with the quantitative evaluation, the authors calculated the instability of the sliding masses according to 1 / 8 and 1 / 11 of the total cubic capacity of the materials falling into the river and the surge wave heights at the falling sites as well as at the xiangjiaba and xiluodu dam sites and in adjacent townships according to the calculation method of the surge wave diagram given by the american society of civil engineers, made the risk evaluation of the bank slope instability with respect to the operation safety at the dam, safety of the cities and townships around the reservoir and safety of the reservoir operation, and put forward precautionary measures for bank slope instability

    摘要筆者通過調查研究和綜合分析金沙江幹流水電工程區岸坡地質背景和體力學環境條件,定性分析與定量評價相結合,採用與三峽工程庫區岸坡失穩危險性評價相類比的方法,針對滑體失穩按總體積的1 / 8和1 / 11入江方量進行了計算和按美國土木工程學會涌浪圖計演算法計算了入水點及在向家壩壩址、溪洛渡壩址和鄰近城鎮的涌浪高度,並圍繞大壩施工安全、庫區周邊城鎮安全,水庫運營安全等方面對岸坡失穩的危險性進行了評價預測,提出了岸坡失穩的防治對策。
  10. Utilizing the scanning electron microscope, x - ray diffractometer, type 9310 microporosity analyzer, the microstructure and chemical composition of mudston, and its macro - variation of physical and mechanical character are measured and analysed, the mechanism of mudstone degradation and softening in water is systematically studied in this paper

    以掃描電子顯微鏡、 x射線衍射儀、 9310型微孔結構分析儀等先進的設備為測試手段,從泥的微觀結構及物質組成等方面入手進行研究,結合泥遇水后宏觀物理-力學性質的變化規律,全面闡述了泥遇水的軟化機理。
  11. Applying the grey correlation methods, this paper analyzed the correlation of slaking durability and granularity fractal characteristics of red bed weak rock as well as the experimental data of mineral and chemical component

    摘要採用灰色關聯度法對紅層軟的粒度分形特徵以及礦物、化學成分試驗數據與其性進行了關聯分析。
  12. German restorers from the international council on monuments and sites have spent two years carefully sorting through the debris from both buddhas, lifting out the largest sections by crane ? some weigh 70, even 90 tons ? and placing them under cover, because the soft stone disintegrates in rain or snow

    來自國際紀念碑及遺址委員會的德國修復人員花了兩年時間小心過濾兩尊巨佛的殘骸,並用怪手運走最大的塊,有些重達70 、甚至90噸重,再把它們覆蓋好,因為軟在雨雪中容易
分享友人