  1. By the check - out, inspection and measurement to start construction the industrial art to this test pile with the examination between stake body mass and bearing power, made sure the stroke reasonable operation method drilling under the dissolved cavern geology term ; the pier foundation loading test expressed the lading and rub the lading that resistance drag a glazing for of relation, and to the borehole cast - in - place concrete pile in the karst terrain deliver with break the mechanism, the characteristic of bearing power, proceeding the spot test job of the full of result ; the test data expresses the stake side friction resistance to rises with a bat batch terminal friction resistance very important function, the of tip of pile resistance drag occupies the proportion very few

    通過對本次試樁施工工藝的檢測和樁身質量及承載力的檢驗,確定了沖擊鉆在溶洞地質條件下的合理使用方法;基樁承載實驗表明了荷載與摩擦阻力之間的關系,並對溶地區的灌注樁的荷載傳遞和破壞機理、承載力特性,進行了富有成果的現場測試工作;試驗數據表明樁側摩阻和支盤端阻起很重要的作用,樁端阻力所佔比例甚少。這與設計樁基時的計算模式相差很大,承載力也較設計增加;使用力學數值分析方法和有限單元法,對鉆灌注樁樁端下的體強度和結構穩定性方面進行模擬計算和定量研究。
  2. Bearing behavior of large - diameter rock - socket piles

    大直徑人工挖樁的承載性狀
  3. In this section the author analyses the rules of the pile ultimate tip resistance and the shaft friction resistance distribution and their exertion of cast - in - place socketed piles instrumented with strainometers in soft muddy rock. the second aspect of the paper is the analysis on the current rock pile vertical bearing capacity in the four standards gb50007 - 2002, tb 10002. 5 - 99, jtj024 - 85 and jgj94 - 94, then the design method with correlated formula of socketed piles in xigeda - mudstone is given. at the end of this paper, based on the research of pressure grouting technique in recent years, and combined with in - site test result, this paper puts forward the design and calculation method to grouted pile in xigeda - mudstone and the principle of choosing grouting parameters, which provid es experiences for applying this technique and further studying

    本論文結合省級科研項目「西攀高速公路昔格達組泥層中鉆樁提高承載力的研究」 ,所做的研究工作主要在以下三個方面:一是根據8根樁身內埋設量測元件試樁的單樁豎向靜載荷試驗資料,分析了各試驗樁特別是常規沖灌注樁在昔格達泥中的軸向力、側摩阻和樁端阻力的分佈和發揮規律;二是在討論現行規范對樁承載力的計算公式的基礎上,探討了在昔格達泥層中的沖灌注樁的側摩阻和端阻的計算方法,並推薦了相應的計算公式;最後,在吸取近年來對灌注樁后注漿技術研究成果的基礎上,結合現場試驗研究結果,分析了該項技術在昔格達層中的應用效果,提出了相應的參數選取,從而為壓力灌漿技術的工程應用和進一步研究提供經驗,並為今後在該地層中合理選用樁型以及指導施工提供了依據。
  4. Borehole completion process of rock socketed piles for the piers of yongding river no. 2 bridge

    永定河2號大橋橋墩樁成工藝
  5. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋鉆灌注樁基樁施工中,在不同地質條件下,水上鉆機平臺的搭設、成設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜面上鉆面上鉆底標高問題作了探討
  6. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場試驗、力學數值分析和有限單元分析,對溶地段鉆灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及深度等方面作一些探討性研究,為該工程的設計和施工積累經驗,並為該類課題的進一步研究奠定了基礎。
  7. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對于溶地區鉆灌注樁的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對溶地段基樁的承載機理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通過現場施工試驗及力學、有限元分析,對溶地區鉆灌注樁的施工工藝、荷載傳遞機理、持力層厚度及深度等方面做一些探討性研究。
  8. Factors influencing quality of grouted baserock - inserting pile

    試論灌注樁的工程質量
  9. ( 3 ) rock bolts are used as an extension of the supporting piles. this structure solves the embedding problem of cantilever pile and is newly applied in foundation trench in china. no environment contamination appears in this old crowed town because no detonation or mechanical drilling

    ( 3 )利用石錨桿作為圍護樁的延伸成功地處理懸臂樁固的問題,該結構方式的應用為國內首例,避免了在舊城鎮老房屋密集區基爆破和機械成對周圍環境的影響和污染。
  10. Hand - dug rock socketed pile construction for a building in shenzhen

    深圳某大廈人工挖樁施工方法
  11. Analysis of bearing behavior of large - diameter hand holed socketed piles

    地基中大直徑挖樁的承載性狀分析
  12. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘探手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場試驗、理論計算和有限單元分析,對溶地區鉆灌注樁的施工工藝、荷載傳遞機理、持力層頂板厚度及深度等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。
  13. Application of pile underpinning technology in line three of guangzhou metro