巖配基 的英文怎麼說

中文拼音 [yánpèi]
巖配基 英文
rockogenin
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : Ⅰ動詞1 (兩性結合) join in marriage 2 (使動物交配) mate (animals) 3 (按適當的標準或比例加以...
  1. The pges abundance patterns of residual mantle rock with a peleo - subduction background is characterized by pd, pt depletion and ir, ru relatively enrichment, while the basalt and basic dyke by the processing of partial melt in the same background take an opposite feature of pd, pt enrichment and ir, ru depletion. the existence of fluid in the subduction zone increases the degree of partial melt on the one hand, and on the other, activates the activity of pd, pt compare to ir, ru, and thus reduces the pd ir and pt ru in residual mantle rock. the pges patterns for basalt and basic dyke from two carboniferous volcano zones to south qoltag and north turpan - hami basin, xinjing uigur autonomous region, take a shape of gentle positive inclined curve with lower pt and pd differentiation and lower pges. all these features are obviously different from that of basic dyke and basalt from typical ophiolite and therefore the author believe that their fluid - rich paleo - subduction zone environment can be ruled out

    古俯沖帶背景下的殘餘地幔的pges分以pd , pt明顯虧損和ir , ru相對富集為特徵,而部分熔融產物的玄武脈則呈現相反的ir , ru明顯虧損和pd , pt相對富集特徵。俯沖帶中流體的參與一方面增加了部分熔融程度,有利於pd , pt從原始地幔進入熔融相另一方面,流體的作用使得pd , pt相對于ir , ru遷移活動性效率提高,造成地幔
  2. In the design, the construction measures such as application of shrinkage - compensating concrete, arrangement of spacing layer between the foundation rock and the bottom slab, adding outside waterproof layer, flexible connection between outlet pipe with side - wall, integerated concrete placement of pump seat with bottom slab and design of reinforcement with application of advanced calculation theory are used according to the characteristics of lager span, larger volume and complex loading conditions of the understructure

    針對下部結構跨度大、體積大、受力復雜的特點,在設計中採取多種措施,包括採用補償收縮混凝土、與底板間設隔離層、增設外防水層、出水管與邊墻採用柔性連接、機座與底板整體澆注、採用先進計算理論指導筋。
  3. With practical engineering examples, this paper deals with the collection of surface wave signal along with seismic refraction exploration, the utilization of surface wave components to make analysis during data processing, the thickness division of overburden bed, strongly - weathered bed, intermediately - weathered bed and weakly - weathered bed in combination with the refraction data, and mutual reflection and interpretation of the burial condition of the bedrock surface

    筆者結合工程實例,介紹了在地震折射勘探中同時採集面波信號,在資料處理時利用面波組份進行分析,合折射資料對測區覆蓋層、強風化層、中風化層及弱風化層厚度進行劃分,同時相互映證解釋面的埋藏情況。
  4. The d - s rule of the information fusion of rockmass mechanical parameters is presented. meanwhile, the basic probability assignments, belief functions, plausibility functions, and similar probability functions are given. this method is applied to an example of analysis and selection for rockmass mechanical parameters of the rock engineering, and the satisfactory results are obtained

    構造了體力學參數的識別框架,建立了體力學參數的本可信度分的應用模型,定義了體力學參數的信度函數、似真度函數、以及類概率函數,提出了體力學參數的d - s信息融合法則,明確了體力學參數d - s信息融合方武漢理工大學博士學位論文法的實施步驟。
  5. So it has good porosity. the sand body distribution is under the control of sedimentary faces ; source rock, reservoir rock and cap were affected by sedimentary sequence, porosity and permeability were affected by diagenesis, the three elements make the basis of petroleum system space - time unit distribution pattern

    鄂爾多斯盆地上三疊統延長組其沉積相帶控制著砂體的空間展布,沉積層序影響著生儲蓋的空間置,成作用影響著儲層物性的變化,三者在時間、空間上有規律的變化為生儲蓋組合的時空置奠定了礎。
  6. This thesis primarily makes below the work of a few aspects : ( 1 ) the method that measuring and solution of the control point ' s coordinate, calculation of the point, solution of intersection with polygons, and calculation the quantity of ore reserves in a drawing file by computer technology ; ( 2 ) the theory and the method to draw the diagram of the equivalent line by establishing the abnormal triangle net, and ore blending with the diagram of the equivalent degree ' s line ; ( 3 ) the principle and method to automatically divide the ore, and the method to adjust to the quantity of ore and search the ore ' s information ; ( 4 ) adoption the line program to beg to solve the problem to ore blending, and establish the linear programming model and the simplification model with ore blending. ( 5 ) establish the control model with ore degree based on modem control theories

    本論文主要完成了以下幾方面的工作: ( 1 )利用計算機技術直接在一張現狀圖中,實現了控制點的測量與求解、坐標展點計算、多邊形求交以及爆堆礦量的計算; ( 2 )提出了通過建立非規則三角網的方法來繪制等值線圖的理論和實現方法,通過等品位線圖指導礦工作; ( 3 )提出了礦塊段自動劃分的原理和方法,並在此礎上實現礦塊礦量調整和礦塊信息查詢; ( 4 )採用線性規劃的方法求解礦問題,建立了礦問題的線性規劃模型和簡化模型; ( 5 )建立了於現代控制理論的品位控制模型。
  7. During the year, a significant number of ground investigation works were undertaken to facilitate land production and infrastructure projects

    年內,由土力工程處負責的土勘探工作,大部分均旨在合與政府房屋政策有關的土地辟拓及建工程。
  8. It is shown how control of the melting of the coating on aluminum particles in a mining explosive helps control the split of the total energy released into shock energy, that supports the detonating shock wave and heave energy, that heaves the overburden off the ore body

    並在此礎上,對含鋁礦用硝胺乳化炸藥中的鋁粉反應過程進行了理論分析,認為鋁粉的吸熱和放熱反應過程對總能量分為沖擊波能(用於支持爆轟波以及破壞層)以及拋擲能(用於拋擲)的比例影響明顯。
  9. The contents of this paper include the following several aspects : ( 1 ) a model of the fractures leakage is built through counting and analyzing the wealthy geological records of hae field, and a model of the fracture water transporting is also built according to the fracture water condition of its recharge and its runoff and its discharge in hae field ; ( 2 ) this paper studies the chemical behavior and the migration parameters of the elenent sr2 + in ground water in hae field, the main contents include : the presence form of the element sr in ground water is analyzed by way of the rmodynamics ; the absorption mechanism that granite and sand stone absorbs sr element is analyzed based on theory and experiment test the diffusion parameters of the element sr in water and in granite and in sand stone are researched with laboratory experiment test ; the partition coefficient of sand stone and granite to sr is tested by the batch way

    其研究內容包括以下幾個方面: ( 1 )通過對我國hae預選處置場豐富地質資料的大量統計和分析,建立了該處置場的裂隙滲透模型。再根據hae預選處置場裂隙水的補給、徑流、排泄條件及水位動態特徵,建立了預選處置場裂隙水水運動模型。 ( 2 )對高毒性鍶元素在我國hae預選處置場地下水中的化學行為和遷移參數進行系統的研究,其中主要包括運用熱力學方法分析了鍶元素在地下水中的存在形態,利用理論分析與實驗測試相結合的方法分析了花崗和砂對核素鍶的吸附機制,採用室內實驗裝置研究了核素鍶在地下水中的擴散參數以及在花崗和砂中的本徵擴散參數,採用靜態批式法研究了鍶在砂和花崗中的分系數。
  10. 4. it is concluded that the es3 is a main member to accommodate the oil expelled from the source rock of the es3 member, that two assignment units of the type i are prospective areas where faulted reservoirs, fracture reservoirs, lithologic deposits may well be founded. the depth of threshold is among 2600 - 2800 meter and that of expulsion is around 3100 - 3400 meter, so the source rock of sha er member is totally immature and that of sha san member is partly mature

    4 、從歷史演化角度和二次運移理論出發,研究了德南窪陷下第三系低熟油灶的油氣運移作用和分,提出初次分主要指向是沙三下段;內部成藏系統是有效的成藏系統,其內部油氣的再次分主要指向德3井南和德1井南是兩個類油氣分單元;德南窪陷生烴深度2600 - 2800米間,排烴起始深度在3100 - 3400米間,按目前下第三系地層埋深深度,則沙一段生油本上處于未成熟狀態,沙三中、下生油處于低熟狀態,僅在窪陷深部分佈成熟生油
  11. On the basis of enough sources, better relations of space arrangement of oil generation, migration and reserver, good conditions of reservoirs and caprocks, subtle reservoirs are formed, such as lithological reservoirs, stratigraphic overlapping reservoirs, fault block reservoirs, palaeoburied reservoirs and fault - nose reservoirs

    在油源充足,良好的生運儲空間置關系,優越的儲層條件和蓋層條件的礎上,形成了性油氣藏、地層超覆油氣藏、斷塊油氣藏、古潛山油氣藏和斷鼻構造油氣藏等多種類型的隱蔽油氣藏。
  12. Yg - 80a construction drilling rig is a full hydraulic operated top drive power head drill. it is used to drill heavy duty pretension anchor hole at side slope of water power station, railway or highway projects, as well as drainage holes

    Yg - 80a型錨固工程鉆機是在yg - 80鉆機礎上研製的,科學分鉆機性能參數,使鉆機更適合石潛孔錘鉆進跟管鉆進,同時兼顧土層合金回轉鉆進螺旋鉆進工藝。
  13. With computer imitation and laboratory physical analog as the lead and on the basis of test ore blocks and industrial blownoff - ore rock tests, study on the enlarged - structure parameters of sublevel caving in meishan iron mine was carried out, which included single tests of drilling and blasting parameters , transition sublevels and equipment complementation. the timely popularization of this enlarging structural parameter technique has greatly improved the performances of the sublevel caving mining and promoted the technological advance of underground mining

    梅山鐵礦加大無底柱分段崩落法采礦結構參數研究,採用計算機模擬、實驗室物理模擬為先導,試驗礦塊、工業放出體試驗為礎,分別進行了采場鑿爆破參數、過渡分段、設備套等單項試驗,並在全礦及時進行了推廣應用,極大地改善了礦石開采過程中的各項指標,促進了地下礦山開採的技術進步。
  14. Chengdu longquan reixing engineering materials plant set product development, manufacturing and marketing its products and services into one, through the introduction, absorption, development and production of innovative self - drilling bolt grouting hollow products and exclusive ancillary machinery widely used in underground engineering ( traffic tunnel, hydraulic tunnels, mine roadway road and the various uses of anchorage support ) geotechnical engineering ( slope, dike rocks, the deep excavation anchorage support ) repair reinforcement project ( tunnels, dikes, dams, housing construction )

    成都龍泉瑞鑫工程材料廠集產品開發、生產製造及產品銷售與服務於一體,通過引進、吸收、開發、創新生產的自鉆式中空注漿錨桿系列產品及專用套機械廣泛應用於地下工程(交通隧道,水工隧道,礦山巷道和各類用途的錨固支護)土工程(邊坡,堤,深坑的錨固支護)修復加固工程(隧道,海堤,大壩,房屋建築) 。
  15. Being or the base of depositional systems, eight pieces of sequence paleogeographic map have been drawned up on condition of long - term cycle sequence as drawing unit, then discussing the distribution of depositional systems on different phases, paleogeographic spread and evolution have been disclosed

    在沉積體系研究礎上,以長期旋迴為編圖單元,編制了8張層序相古地理圖,討論不同時期沉積體系的置關系,揭示了不同時期相古地理展布特徵和演化規律。
  16. With the rapidly development of minefield and the rapidly increase of coal output, the excavation scope and depth will extremely rise, the excavation work is under the overlying by the thin rock strata, and under the thick loose bed, the population in mine field will be more and more, the relevant basic industries will also develop rapidly. the mines will discharge more water from the underground, and the production and living will also consume more water. so the original water resource balance system in the minefield will be broken, the ecological environment formed by the nature will be destroyed in some degree

    隨著礦區迅速發展而煤炭產量的快速增長,既定在薄厚鬆散層下的神東煤田開采范圍和深度勢必急劇增大,相應的人口也增加,與其相匹的其它礎工業一併迅猛發展,導致礦井外排水和生產生活用水直線猛增,這一系列生產和生活巨量用水必然會打破礦區原始的水資源平衡體系,不同程度的破壞自然形成的脆弱的生態環境。
  17. The study solves engineering problem as follows : ( 1 ) the systematic study on the historical course of xigeda strata deposit and geologic environment includes strata, lithologic characters and constitution et in the liangshan and panzhihua region. the results show that the xichang - panzhihua express way is controlled by the anninghe fault and the xigeda fault, the earthquake frequently happen in the region of pass, the different sedimentation number is more great, they effect the road building, safety in operation and structure belong road ( 2 ) because in some place the xigeda strata is foundation and roadbed, the study on the basic properties of the xigeda strata include density, moisture content plastic and liquid limit graduation. the results show that the xigeda strata is deposition in lake, the main component is mudstone and sandstone, the fine particle is main, it has some viscosity, the moisture content of mudstone is different the it of sandstone, the other property are likeness. the xigeda strata has no dilatation on total, some claystone have low and medium dilatation ; ( 3 ) the study on the basic properties of xigeda filler include the composition of matter the biggest standard dry density, the optimum moisture content the results show that xigeda filler can use as road material, it is well grade filler and admixture filler on essence, its compaction index should change in different place because the property is controlled by mudstone and sandstone that change is great in different place ; ( 4 ) the study on the xigeda filler craft used as express way roadbed, includes suitable thickness, compaction numbers and methods and equipment choice et

    公路沿線廣泛分佈有昔格達地層,昔格達地層能否用作高速公路路填料,國內沒有先例,本論文就是結合導師的科研項目,在非典期間,現場長達5個月的工作,完成了從試驗、現場施工工藝到路堤分層沉降監測等工作,是面對生產實際,認識昔格達地層的性質和其作為地、路和填料應用中面臨的問題進行的研究。主要的研究內容有:對攀西地區地層性、構造等地質環境和昔格達地層的沉積歷史過程作了系統的分析,研究表明西攀高速公路主要受安寧河斷裂和昔格達斷裂影響,通過地區地震活動頻繁,差異沉降較大,對公路建設、安全運行和沿線構築物設計有較大影響;由於昔格達地層在有些路段作為地、有些作為路,對其本性質進行了研究:包括天然密度、含水量、塑液限、顆粒級等指標的試驗研究。研究成果表明:昔格達地層為湖相沉積,主要為砂和泥,它以細粒組為主,同時粘粒的存在,使其具有一定粘性。
  18. The mafic rocks have high ( 87sr / 86sr ) j ( 0. 7046 - 0. 7077 ) and 207pb / 204pb ( 15. 47 - 15. 67 ), but relatively low in ( 143nd / 144nd ) i ( 0. 5125 - 0. 5127 ) and 206pb / 204pb ( 18. 26 - 18. 52 ). the negative correlation between 143nd / 144nd and 206pb / 204pb and the positive relationship between 87sr / 86sr - 206pb / 204pb suggest a mixing of a depleted mantle source and an em2 component in the study area. calculation reveals that the maopin - shaianjiao mafic rocks are formed by 5 - 15 % degree of partial melting of an lree - riched spinel iherzolite

    模擬計算表明,該墻群是尖晶石二輝橄欖地幔5 - 15部分熔融的產物;微量元素分模式及理論模擬表明茅坪?曬鞍角體的地幔源區在熔融前曾受到1俯沖沉積物熔體的源區混染和5流體交代作用。
  19. On the basis of brilliant exposition of macroscupic and microscupic features of cap rocks of deep - formation natural gas in songliao basin, the sealing capacity of cap rocks of natural gas in studied area is comprehensively evaluated, and creatively put forward a comprehensive cap rock - evaluating method using percolating velocity which natural gas pass though mudstone cap rocks

    登二段氣源的擴散量為55 . 55 10 ~ ( 12 ) m ~ 3 ,占該段生氣量的81 . 6 。在以上工作礎上,對深層天然氣源-蓋層系統的時空置進行了深入探討。
  20. Applying strain - energy distributing theory during col1iding and energy ruler during colliding, the paper put forwards the critical velocity equation which rock - mass destroy when colliding occuf, and other severa1 equations to make certain average velocity and motion direction after collide. at the same time, the equation to make certain the value of energy to make rock - mass destroy has been deducted, and on the base of this, the paper brings forward the equation to calculate average diameter after rock - mass falls into pieces by the way of word - cost theory. accordingly, the paper perfectly studies the effect of falling into pieces in the course of landslide colliding

    ( 3 )首次應用碰撞過程應變能「分」原理及體破壞的能量條件,導出了滑坡體在碰撞時發生破壞的臨界速度公式及碰撞后滑坡體的平均速度和運動方向的確定公式,導出了碰撞過程用於體破碎的能量計算公式,並在此礎上,利用功耗原理,提出了滑坡體破碎后平均塊度的計算關系式,從而較完整地分析了滑坡體碰撞的解體破碎效應。
分享友人