巖面 的英文怎麼說

中文拼音 [yánmiàn]
巖面 英文
floor
  • : 名詞1. (巖石) rock 2. (巖峰) cliff; crag
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  1. Abraded bedrock surface

    浪蝕基巖面
  2. More esoteric but useful rests include elbow cu ( placing your elbow in a dish of rock and bracing on it ), meat hooks ( using the fleshy heel of your hand to smear on a small rock feature ), and - - wild as it may seem - - facing away from the rock

    更需要練習卻也是很有用的休息方式包括用手肘撐住(將手肘放在石盤上並撐開) ,用手掌多肉的部份摩擦小點,以及看起來似乎很瘋狂背向巖面
  3. More esoteric but useful rests include elbow cups ( placing your elbow in a dish of rock and bracing on it ), meat hooks ( using the fleshy heel of your hand to smear on a small rock feature ), and - - wild as it may seem - - facing away from the rock

    更需要練習卻也是很有用的休息方式包括用手肘撐住(將手肘放在石盤上並撐開) ,用手掌多肉的部份摩擦小點,以及看起來似乎很瘋狂背向巖面
  4. The study on the movability of the face - contacted blocks in overlying strata above the longwall face in datong

    大同采場覆巖面接觸塊體可動性判定研究
  5. The only road was of the "shelf" variety.

    其間僅有的路為各種「巖面」。
  6. With practical engineering examples, this paper deals with the collection of surface wave signal along with seismic refraction exploration, the utilization of surface wave components to make analysis during data processing, the thickness division of overburden bed, strongly - weathered bed, intermediately - weathered bed and weakly - weathered bed in combination with the refraction data, and mutual reflection and interpretation of the burial condition of the bedrock surface

    筆者結合工程實例,介紹了在地震折射勘探中同時採集波信號,在資料處理時利用波組份進行分析,配合折射資料對測區覆蓋層、強風化層、中風化層及弱風化層厚度進行劃分,同時相互映證解釋基巖面的埋藏情況。
  7. Up at sea level, the dry wash cuts through the yellowish mud - stone and siltstone for which the canyon is named, this is the place you want to see in late afternoon just hour before sundown, the hills are glowing at 24 carats. a drive to zabrishie point for fine views of the valley

    站在巖面扭曲起皺顏色,或紅或紫或黑的火山的危崖絕壁上,看各式古代大湖乾涸后,留下來厚達兩千尺白雪狀的鹽土層,實在覺得人在時光中的渺小。
  8. The latest constructing machine and the newest technology were adopted to ensure that the borehole is perpendicular to the rock face of roof and that the depth of borehole and the torsional moment of the anchoring bolt meet the design requirement

    採用最新錨桿施工機具及工藝,保證鉆孔垂直於頂板巖面,孔深及錨桿扭矩滿足新型機械錨桿的設計要求。
  9. Abstract : this article discusses the formation of the drilling rig platform, selection of the hole forming equipment and treatment of some incidents occurred during the construction of the bored pile foundation of the qi ? ao bridge in zhuhai under different geological conditions. it also studies such issues as the embedment of the steel casing and bottom elevation of the bored pile on the inclining rock and katarock

    文摘:筆者介紹了淇澳橋主橋鉆孔灌注樁基樁施工中,在不同地質條件下,水上鉆機平臺的搭設、成孔設備的選型、事故的處理,並對鋼護筒的埋設及破碎帶傾斜巖面上鉆孔嵌巖面上鉆孔樁孔底標高問題作了探討
  10. This paper is on the basis of analysedding and summarized that these projects were blown up and tested materials in the past, use fracture mechanics, the dynamics blast theory and finite element analytical method, have carried on the system, detailed analysis and describes to this kind of method of blasting, proving theoretically that can cut the base rock effectively in this kind of method of blasting, reduce base blowing up stress value inside the rock, play and protect underpart base rock blow up into the function influenced in vibration, and blew up mechanism and analysed the main influence factor blown up according to it, had put forward the rational optimization measure to the relevant parameter when implementedding and blown up

    本文在分析總結以往這些工程爆破試驗資料的基礎上,運用斷裂力學、爆破動力學理論及有限元分析方法,對這種爆破方法進行了系統、詳細的分析及論述,從理論上證明此種爆破方法可以有效地切割基巖面,降低基內部的爆破應力值,起到保護下部基不受爆破振動影響的作用,並根據其爆破機理分析了爆破的主要影響因素,對實施爆破時的相關參數提出了合理的優化措施。
  11. The carbonate area is to 32 thousands km2 and it occupies to 38. 83 % of chongqing dimensionality area. and it mostly distributes in the northeast and southeast. the districts and vi counties, which carbonate distribution area is beyond 50 % of dimensionality area, include nantong, nanchuan, wulong, pengshui, qianjiang, youyang, xiushan, wuxi and chengkou

    重慶市幅員積8 . 24萬km ~ 2 ,碳酸鹽出露積3 . 20萬km ~ 2 ,占幅員積的38 . 83 ,主要集中於渝東北和渝東南各縣,其中碳酸鹽巖面積占土地積50以上的區縣有南桐礦區、南川、武隆、彭水、黔江、酉陽、秀山、巫溪、城口,佔30以上的縣有豐都、奉節、巫山,石柱和涪陵都在28以上。
  12. Engage the creative right side of your brain and look for po ible mixes like a leg - hook / toe - hook setup ( figure 1 ), hand - jam / hip - scum fusion, or stem / meat - hook combo

    發揮右腦的創意並找出可能的組合,例如一個用腿和腳趾勾住的姿勢(圖1 ) ,同時塞手並用臀部推擠,或是結合把腳踢開以及用掌摩擦巖面的方式。
  13. Engage the creative right side of your brain and look for possible mixes like a leg - hook / toe - hook setup ( figure 1 ), hand - jam / hip - scum fusion, or stem / meat - hook combo

    發揮右腦的創意並找出可能的組合,例如一個用腿和腳趾勾住的姿勢(圖1 ) ,同時塞手並用臀部推擠,或是結合把腳踢開以及用掌摩擦巖面的方式。
  14. Sloper : any hold that slopes downward so that you can " t lock onto it. slopers are easy to slide or " grease " off of

    巖面向下傾斜的點,你無法很穩的固定在上,很容易滑掉。
  15. Old bolts must not be left protruding from the rock surface

    留在壁上的老舊固定支點決不能凸出巖面
  16. Bottom hole rock surface

    井底巖面
  17. The empty niches that once held bamiyan ' s colossal buddhas now gape in the rock face ? a silent cry at the terrible destruction wrought on this fabled valley and its 1, 500 - year - old treasures, once the largest standing buddha statues in the world

    一度為巴米揚巨佛落座的空洞佛龕如今巖面崩裂坍塌,似在對這個為人傳誦的山谷及其有1 , 500年歷史的古跡,那個一度是世界上最大的立佛雕像,遭到恐怖摧殘的無聲吶喊。
  18. Reflectivity depends on the velocity and density of rocks.

    反射能力取決于巖面的速度和密度。
  19. This paper gives detailed analysis and summary to the weathering and erosion process of rock slope, discovery the weathering velocity of rock slope is mainly controlled by such factors as lithology, structures, climate, structural characteristics of rock mass, the undulation and exposed area of rock surface, and man - made factor, furthermore, analysis the eroding mechanism of rock slope and its influencing factors

    摘要對石邊坡的風化和侵蝕過程作了較為詳細的分析和總結,發現石邊坡的風化速度主要受性及構造、氣候、體結構特性、巖面起伏及其裸露程度和人為因素的控制。
  20. 9 where old fixed protection cannot be removed the old protection should be cut off flush with the rock or ( preferably ) sheared off below the rock surface and the hole then plugged

    9當老舊的固定支點無法移除時,應將其切除,使其與巖面齊平;或最好在切除時,使其低於巖面,再將洞口補平。
分享友人