庫內內河 的英文怎麼說

中文拼音 [nèinèi]
庫內內河 英文
cunene river
  • : 名詞1. (內部; 里頭; 里邊) inner; inside; within 2. (妻子或妻子的親屬) one's wife or her relatives 3. (姓氏) a surname
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • 庫內 : cune
  1. The management work data of oil - field earthquake exploration and oil - well position, which has not only data of current space position, but also entitative attribute data describing, have great capacity, traditional cad graphics describing the data plus the model database managing mode ca n ' t already adapt the modem exploration with well geography information for management work demand, so it is necessary to realize the unique management of exploration and oil - field well space data and attribute data use advanced geography information system ( gis ) technique, this thesis is based on the excellence ' s table ' s top geography information system - the maplnfo software, using the second process technique, the digital relief map and tectonic map as the base map, the earthquake exploration database as the original data, established the gis of the exploration and oil - field well in the area of the liaohe oil - field, realize visualization management, it provides a reference thereunder for the earthquake exploration deplo ying the workload and proceeding the technique design, and completed lots of practical work

    油田地震勘探與油井井位管理工作數據量大,既有空間位置數據,又具有實體的屬性描述數據,傳統的cad制圖+屬性數據管理模式已經不能適應現代勘探和井位管理工作的需要,採用先進的地理信息系統( gis )技術,實現勘探和油田井位空間數據和屬性數據的統一管理是必然的趨勢。本文以優秀的桌面地理信息系統mapinfo軟體為開發平臺,在此基礎上進行二次開發,以數字化地形圖、構造圖為載體,以地震勘探數據為數據源,建立了遼油田范圍的地震勘探和油田管理信息系統,實現了數據的可視化管理,為地震勘探部署工作量、進行技術設計,提供了圖形和數據的參考依據。並完成了很多實際工作。
  2. Article 24 : in any river, lake, reservoir and canal, the following activities are prohibited : discarding or piling objects impedimental to flood passage and navigation ; planting trees and growing crops of long stalk variety impedimental to flood passage

    第二十四條在江、湖泊、水、渠道,不得棄置、堆放阻礙行洪、航運的物體,不得種植阻礙行洪的林木和高桿作物。
  3. The donghuayu aqueduct bridge located in meixian county in shaanxi province was first built in 1980 ' s

    位於陜西眉縣境石頭東乾渠上的東滑峪渡漕,始建於上世紀80年代。
  4. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流增建旁通管設計提供依據。
  5. The ecological resources recorded within the assessment area include shrubland, stream ravine, coastal backshore and reservoir pond marsh

    在研究區所錄得的生態資源包括灌木叢谷海岸后灘和水塘蓄水沼澤。
  6. The inner factors refer to the mechanical behavior such as the rock type, density, construction parameter, etc. and the outer factors refer to the foundation condition, geological condition, valley shape, rise and fall of water level, seepage due to respiration

    因是指堆石料的巖質巖性、密實程度、施工參數等組成壩體的各種力學性質;外因是壩址所處的基礎條件和兩岸的地形地質等條件、谷形狀、水水位的變化、降雨浸潤等因素。
  7. The power station is diversion type power station of low gate dam with a normal storage level of 1268. 0 m, a highest gate dam level of 31 meters and a reservoir capacity of 2, 974, 000 cubic meters, the length of diversion tunnel of which is 19. 57 kilometers, installed capacity is 360mw futang power station is constructed on the basis of deep and thick overburden, the foundation of which mainly consist of five overburdens which, in general, belong to multiple, complex foundation

    福堂水電站位於四川省阿壩藏族羌族自治州汶川縣境的岷江段上,電站為低閘引水式開發。正常蓄水位1268 . 0m ,最大閘高31m ,容297 . 4萬m ~ 3 ,引水隧洞長19 . 57km ,裝機360mw 。福堂水電站閘壩建於深厚覆蓋層基礎上,基礎主要存在五大覆蓋層,總體屬于多層復雜地基。
  8. The fresh soil and water loss caused in the road construction often appears at the roadbed, rock slope and the place for the discarded soils and gravel, which will do harm to the rivers, reservoirs and the crop fields and pollute the surrounding environment

    道路建設產生的新的水土流失主要發生在挖方、填方路基、邊坡、棄土(石)場以及施工過程中的亂挖、亂堆、亂倒,它主要危害建設區流、水、農田和村莊,污染周圍環境。
  9. Length of navigable inland waterways : refers to the length of the natural rivers, lakes, reservoirs, canals, and ditches open to navigation during a given period, which enables the transport by ships and rafts

    航道里程:也稱「通航里程」 ,是反映水運網規模、水平和發展情況的主要指標;是指在一定時期,能通航運輸船舶及排筏的天然流、湖泊水、運及通航渠道的長度。
  10. ( 2 ) aiming at the bigger irrigation quota of fall irrigation system and the complicacy of the salt movement in soil, the paper applies reservoir leaching model bring forwarded by w. h. van der molen to hetao irrigation district located in aridity area, and establishes salt leaching simulational model under the fall irrigation system. through calculating, the feasible fall irrigation quota is 100 - 120m2 / 667m2 in light salinization soil, and the feasible fall irrigation quota is 120 - 150 m2 / 667m2 in mild salinization soil. the model is reasonable and exact, and it can be researched deep

    ( 2 )針對在秋澆灌溉制度中秋澆定額較大,土壤中鹽分運移規律復雜的特點,利用w ? h ? vandermolen提出的水沖洗模型,建立了地處乾旱地區的套灌區區域的秋澆制度鹽分淋洗模擬模型。經計算在輕度鹽漬化土壤中秋澆的灌溉定額以100 120m ~ 3 667m ~ 2為宜;中度鹽漬化土壤秋澆的灌溉定額以120 150m ~ 3 667m ~ 2為宜,模型合理可靠,準確可行,可進一步向縱深方向進行研究。
  11. The logistics center covers an area of 100 acres and is provided with 20, 000m 2 steel - structure warehouse, 30, 000m 2 depot and 4 berthes of 1, 500 ton ; 6 pier cranes capable of lifting 8 tons, 3 full container lifts and 11 forklift trucks of different kinds

    物流中心佔地100畝,擁有20000平方米的輕鋼結構倉、 30000平方米的作業場地和1500噸級的碼頭泊位4個;配有8噸碼頭吊機6臺、集裝箱重吊3臺、各類叉車11臺。
  12. The dam for chahanwusu hydropower station is the first one among the concrete faced rock - fill dams under construction with the height of over 100 m and the toe slab being constructed on thick and deep cover in china

    摘要察汗烏蘇水電站水大壩為目前在建的床趾板建在深厚覆蓋層上國首座百米級的混凝土面板堆石壩。
  13. Taken yanjia river watershed as an example, this study extracted watershed digital characters from dem, and simulated rainfall - runoff with the rainfall - runoff model based on gis and wms. the main contents and results include : ( 1 ) the building of the spatial database of watershed

    本研究應用地理信息系統和wms模型系統,以三峽區晏家流域為例,由dem提取流域數字特徵,再與降雨徑流模型有機結合進行了降雨徑流數字模擬研究,主要的研究容和結果包括以下幾個方面: ( 1 )建立了流域空間數據
  14. Considering natural and social characteristics, the ecological restoration of water and soil conservation is proposed for rivers, reservoir entrance and reservoir region to purify water and ensure sustainable development of water supply

    結合水水源地的自然、社會特點,提出對保護區、入口門、區等處及水土保持生態修復的設想,使水體水質得到凈化,進而保證水供水的可持續發展。
  15. B ) utilizing dong zhuang reservoir to adjust during on year. thus can decrease the sediment deposit of lower wei - river as result small flood and non - flood season

    利用東莊水調節涇小流量洪水,進行年調節,盡可能減少小洪水和非汛期小水對渭下游的淤積。
  16. Viewing the overall condition, this numerical value can reflect the fill condition of inner mongolia section since the longyangxia reservoir putting into operation in 1986

    總體看,這一數值可以反映1986年龍羊峽水運用以來蒙古道的淤積情況。
  17. The paper introduces and amends the composite indexes of soil erosion intensity and regional soil erosion intensity and conducts quantitative analysis on spatial relationship of types of land use and soil erosion intensity of whole china territory, the middle and lower areas of liaohe river, headwater area of danjiangkou reservoir of south - north water transfer project of hubei part and 4 regions of huidong county in guangdong based on sum up of general study methods of spatial relationship of land use and soil erosion

    摘要在總結土地利用與土壤侵蝕空間關系一般研究方法的基礎上,引入並修正了土壤侵蝕強度綜合指數和區域土壤侵蝕強度綜合指數,時整個中國境、遼中下游地區、南水北調丹江口水水源區湖北部分和廣東省惠東縣4個區域土地利用類型與土壤侵蝕強度空間關系進行了定量比較分析。
  18. The co - action of wind wave and structures model tests of anti - typhoon wave ability of sea dike works the observation and analysis of wind and waves in reservoirs and ship wave in inland waterways

    風浪與建築物的相互作用,海堤工程和抗臺風性能的模型試驗;海岸、水風浪、航道航行波觀測及分析計算。
  19. Main to three gorges water conservancy vital point the engineering ' s general situation, main building, construction work period main influence towards yangtze river shipping of developments of three gorges engineering of great significance for with main function proceeding introducing, the domestic and international inland river shipping develop the general situation, clear and definite inland river shipping to develop the trend, indicating that three gorges engineering developments yangtze river shipping of right development, analysis, for bring upping establish the three gorges water area the third part is a yangtze river upper stream shipping the characteristics of the safe condition and because of

    主要對三峽水利樞紐工程的概況、主要建築物、施工工期和主要作用進行介紹,根據國航運發展概況,明確航運發展趨勢,指出三峽工程建設對發展長江航運的重大意義,分析三峽工程建設對長江航運的主要影響,為提出建立三峽區航運安全管理體系打下基礎。第三部分是長江上游航運安全狀況的特點及成因。
  20. The bingling ( si gou xia ) hydropower station is a series of power stations on the yellow river, in order to the expropriation and the emigration be reduced, after studied the relation of water level and flux of the bingling hydropower station on the taping dam location, under the different running circumstances of the liujiaxia reservoir, to located the bingling hydropower station on the head of the liujiaxia reservoir, and keeping the total installation and the generated energy not be changed all made use of the floodwater of the liujiaxia reservoir

    摘要黃炳靈(寺溝峽)水電站是黃幹流上的一個梯級電站,為了減少征地移民損失,經對炳靈水電站(塔坪壩址)尾水斷面在劉家峽水不同運行方式下的水位與流量關系進行分析研究,在總裝機和年發電量基本不變的情況下,充分利用劉家峽水汛限水位,將電站樞紐選址在其電站
分享友人