建防護堤 的英文怎麼說

中文拼音 [jiànfáng]
建防護堤 英文
riveting
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : Ⅰ動詞(防鷥) provide against; defend against; guard against Ⅱ名詞1 (防守; 防禦) defence 2 (堤...
  • : 動詞1. (保護; 保衛) protect; guard; shield 2. (袒護;包庇) be partial to; shield from censure
  • : 堤形容詞[書面語] (水清見底的樣子) (of water) clear
  • 護堤 : reinforcing dam; dike-dam; protect a dike
  1. Sediment and soil were removed to expose the bedrock and enable the dams to be erected on solid rock. the cofferdams were retained, and the seaward one served as a protective structure. the seawardside of the cofferdam for the east dam was placed with more than 7, 000 dolosses, each weighting 25 tonnes to stop the pounding ocean waves

    成后,圍堰仍然保留,用作主壩的,西壩的,向海的一面更安放了七千多塊每塊各重25噸的波石,阻擋來自南中國海及太平洋海浪的沖擊。
  2. Article 55 any violator of the provisions of article 19 of this law who fails to follow the planned realigning and leading line to realign river courses and build up construct ion projects for leading the river direction or protecting embankments shall, if the flood control work is affected, be ordered to stop the illegal act, restore to the original state or take other remedies and may be concurrently fined not less than rmb 10, 000 yuan and not more than rmb 100, 000 yuan

    第五十五條違反本法第十九條規定,未按照規劃治導線整治河道和修控制引導河水流向、保岸等工程,影響洪的,責令停止違法行為,恢復原狀或者採取其他補救措施,可以處一萬元以上十萬元以下的罰款。
  3. In case where violation of requirements in the consent document for planning affects flood control but remedies can be taken, the violator shall be ordered to take remedies within a time limit and may be concurrently fined not less than rmb 10, 000 yuan and not more than rmb 100, 000 yuan

    第五十五條違反本法第十九條規定,未按照規劃治導線整治河道和修控制引導河水流向、保岸等工程,影響洪的,責令停止違法行為,恢復原狀或者採取其他補救措施,可以處一萬元以上十萬元以下的罰款。
  4. This paper summarize the estuary sediment management methods also, analyze and the following aspects and give evaluations : estuary dredging and lead the flow, lead water to scour the river channel, build the xihekou reservoir, estuary gate deposition management, dike reinforced etc

    本文還對河口泥沙的處理途徑和措施進行了概括總結,對河口疏浚與導流、引海水沖刷河道、設西河口水利樞紐、攔門沙治理、人工有計劃改道和出漢、加高和加固工程和挖河固工程等進行了分析評價。
  5. Because of obstructing by impermeable wall, groundwater drainaged long time brings about immersion, whether or not this will result in a series of water surroundings problems, such as farmland salinization, marsh, lowering of ground temperature and so on, which are all focused on by government, resident, experts in engineering, hydrogeology, agriculture and surroundings

    而是否會因為滲墻的阻隔,地下水長時間得不到排泄而產生浸沒,造成農田鹽堿化、沼澤化和地溫降低等一系列水環境問題,均系設區各級政府、沿江居民和國內外部分工程及水文地質專家、農業與環境保專家共同關心的話題。
  6. Breakwater is the structure that formed inner harbor with protected water area, it is the important structure of harbor, of which the function is ensuring the water area inner be protected of being suffered from wave attack when ship navigating, anchoring and operating

    是港口中形成有掩的水域的築物,也是港口的重要組成部分,它的作用是保證內水域在船舶航行、停泊及作業期間不受外部入侵波浪的影響。
  7. It really isn t about building higher flood defences around battery park

    氣候變化絕對不是圍繞著炮臺公園( battery park )多高的的問題。
  8. Wave screens are often constructed on the top of sloping wave protection constructions such as seawall, revetments, etc. to meet the requirements of overtopping and stability and cut down engineering cost

    摘要在海岸等斜坡式築物中,為滿足越浪與穩定要求,減少工程投資,通常在頂設置浪墻。
  9. Is a professional production of highways, railways, bridges, municipal use protective use nets, gelizha ; buildings, bridges, roads, dams, electricity, etc. used in the construction of a large network of films and music board shu network, the supermarket shelves, revolving boxes, bakery network, a large range of products such as pet cage manufacturers

    是一家專業生產公路、鐵路、橋梁、市政用的用網、隔離柵;樓房、橋梁、路面、壩、電力等用的大型網片及築用舒樂板網、超市貨架、周轉箱、烘烤網、寵物籠等系列產品的大型生產廠家。
  10. There are two purposes in numerical harbor : one is to reduce the investment of harbor, it includes planning breakwater and selecting water way more reasonably, the other is to increase the benefit of harbor, the main content of which is to reduce maintenance cost and to take operation decision according to the natural conditions

    立數值化港區的目的有兩個:一、降低港口的設投資,更為合理地進行布置和航道選取;二、提高港口效益,其中的主要內容是降低港口的維費用,並智能化地根據當前自然條件進行港口營運決策。
  11. Though the flood control engineering system improved the flood control standard and reduce the frequency of flood inundation and enlarger the protected area, but at the same time, the risk of dike broken and dam failed were added. moreover, people found that human living environment become worsen increasingly and the river ecosystem was destroyed

    然而,在與洪水斗爭的過程中,人們發現雖然通過大規模的水利工程設,提高了江河的洪標準,減少了洪水泛濫的幾率,擴大了洪保的范圍,但同時也增加、大壩潰決等的風險,而且人類發現生存環境日益惡化,河流生態系統被破壞等諸多問題。
  12. The paper researches planning of breakwater, and studies the optimizing method during harbor planning. as well known, the shorter the length of outer dike is, the less the investment of the construction costs, and vice versa. it is a complex problem to plan the axis

    眾所周知,從工程投資考慮,外的總長度應力求縮短,以減少工程量和設經費;而從掩效果的好壞來看,外布置長度越大,其范圍越廣,效果越佳。
  13. This experiment suggested the rate of flow could be cut by a half to three - quarters, which would help those in the path of the expanding, gooey lake to prepare by building adequate levees

    實驗模型由塑料布和軟管構成,實驗證明泥漿流速可減少一半甚至四分之三,從而為人們造足夠的壩爭取寶貴時間。
  14. More than half the city remains underwater 10 days after hurricane katrina overwhelmed levees designed to keep the low - lying city dry

    卡特里娜颶風摧毀了為保這個地勢低洼城市而10天之後,新奧爾良市一多半地區仍然浸泡在水裡。
分享友人