彎閘 的英文怎麼說

中文拼音 [wānzhá]
彎閘 英文
knee brake
  • : Ⅰ形容詞(彎曲) curved; bent; crooked; flexuous; tortuous Ⅱ動詞1 (使彎曲) curved; bend; flex 2 ...
  • : anchor gate
  1. Two numerating methods are used in traditional structural design of gate chamber. first, considering the gate frusta to be fastened on the weir body, it is calculated as plane stress problem independently. then applying the results ( moment and vertical force ) on the bottom of gate frusta as concentrating load on the weir body, and the weir body is viewed as a elastic foundation beam or plate and unilateral stress analysis was performed

    傳統室結構計算有兩種計算方法,其一是將墩視為固端于堰體上,單獨進行墩平面受力計算,再將墩下部的計算結果(矩和垂直力)作為集中荷載作用於堰體上,堰體作為彈性地基梁或板進行片面應力計算。
  2. The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures, such as placement of the warping sluice on the concave bank of a bending reach ; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc

    分析表明,採用將放淤布設在道上段的凹岸、道設置溢流堰、淤沙條渠的合理分區和科學調度等措施,可以實現試驗工程淤粗排細的目標。
  3. 5 ) a new type of superposed beam used in wutaizha terminal market, with notch at each end of the prefabricated member, is analysed, and design method of it is also regard as the representative of the superposed beam with notchs

    5 )針對武泰農副產品市場工程中使用的帶槽預制構件疊合梁,根據前面提出的計算方法,總結了這類形式的疊合式受構件的設計計算原則以及計算方法。
  4. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制、進水、泄水等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  5. Ordinary it takes over 30 % cost of total irrigation buildings. in seasonal frozen soil area, frozen heave produces frozen - heave forces on the slab - foundation. it often make the slab - foundation damage due to bending, twisting and growth - up if the construction is build following non - frozen soil design methods

    季節凍土區涵工程是水利工程建設中常見的一種結構,一般占水工建築物工程造價的三分之一以上,在季節凍土區由於土凍結后產生的凍脹,對板基作用有凍脹力,所以按照融土壓力設計的板基經常發生曲、扭轉、上抬等破壞。
  6. And matrix equations calculating the responses of coupled vibrations are deduced. a set of software analyzing coupled vibrations is developed. the responses of flexural vibration, torsional vibration and torsional torque are analyzed under some fault cases, including mass escaping of low - pressure and generator rotors

    利用該軟體,分析了低壓缸和發電機轉子發生質量飛脫事故,發電機出口端發生三相、兩相短路故障,發電機非同期並網故障以及電網三相短路重合故障時,機組軸系的振、扭振及扭矩響應情況。
分享友人