恢復故態 的英文怎麼說

中文拼音 [huītài]
恢復故態 英文
reconvert
  • : Ⅰ形容詞1 (重復) repeated; double; duplicate 2 (繁復) complex; compound Ⅱ動詞1 (轉過去或轉過...
  • : Ⅰ名詞1 (事故) event; incident; happening; accident 2 (原因) cause; reason 3 (朋友; 友情) fr...
  • : 名詞1. (形狀; 狀態) form; condition; appearance 2. [物理學] (物質結構的狀態或階段) state 3. [語言學] (一種語法范疇) voice
  1. Restore the system state from a recent backup, or use the recovery console to replace a damaged file with a clean copy

    從最近的備份中還原系統狀,或使用控制臺,用干凈的版本替換損壞的文件。
  2. The research of soil degradation in pur country is mainly concentrated on the red earth hilly area in the south in the past, and is less on the loess plateau that is one of the most fragile areas. based on field experiment and laboratory analysis, discuses the degradation mechanism, and raises the methods of refreshing and reestablishing land productivity of huangshan soil in chunhua county of shaanxi. in the hope of serving development of western regions and ecological environment construction that concede the land to forestry ( the grass )

    我國以前對土壤退化問題的研究主要集中於南方紅壤丘陵區,對生環境最脆弱的黃土高原地區的土壤退化研究相對較少,本文以黃土高原地區陜西淳化縣的侵蝕性黃?土為對象,通過野外人工模擬降雨試驗和室內分析相結合的方法,探討了侵蝕性黃?土的退化機理,提出了和重建黃?土土地生產力的途徑和方法,以期服務于西部大開發和退耕還林(草)的生環境建設。
  3. With the development of automobile industry and road transportation , the traffic accidents happen every day in the world and become a serious society problem the vehicle collision accidents are over 2 / 3 times as much as all traffic accidents they cause a large amount of social infuence and serious economic loss therefore , it is urgent to study vehicle collision accidents comprehensively and systematically , and the research also is the academic foundation to analyze and deal with traffic accident it is difficult to authenticate car velocity after traffic accident to dig over locate witness is right way mechanics is avaid tool in this field it is important to establish math model and this is precondition to calculate vehicle velocity firstly on the basis of summarizing the research results , this paper deeply discusses the calculating model to analyze the instantaneous motion state in the vehicle collision, the interrelation among the every moving mechanics parameters in the every phase of the collision secondly , according to the collinear collision and two - dimension collision and the restitution coefficient , the paper estabishesthe post collision movement models it proves that these models are correct and valid thirdly , this paper try to research reconstruction of road traffic accident and put forward the method on it

    對交通事的科學分析應是建立在正確的數學模型與計算機模擬技術基礎上的定量分析,其基本條件就是要有能正確描述事過程中汽車狀的數學模型,只有建立正確的數學模型,才能較準確地推定事車輛的碰撞速度。所以建立正確地車輛碰撞模型和運動模型正是汽車事再現的關鍵問題。本文首先在總結前人研究的基礎上,深入地研究汽車碰撞理論,分析了車對車碰撞作用瞬間狀的計算模型及碰撞系數與碰撞前、后速度的關系;其次,根據交通事中最普遍的一維和二維碰撞的不同情況,採用系數和滑動摩擦系數等概念,分別建立了碰撞后車輛動力學模型;第三,對汽車碰撞事再現進行了初步研究,確定了車對車碰撞事模擬計算和反推計算方法,並給出相應的模擬程序流程圖。
  4. Abstract : the paper presents the study on problems of self - excitation , over - voltage , frequency and voltage stability , organizational measures and arrangement in the course of black start and restoration of the system. through simulation of black start on east china power system , above problems are analyzed and solved , it shows that working out strict black start scheme may not only speed up system restoration , reduce outage losses , but also have important significance to emergency release or power system islanding

    文摘:研究電力系統黑啟動的過程及中存在的自勵磁、過電壓、頻率和電壓穩定、組織措施及安排等問題,並通過華東系統黑啟動模擬對上述問題進行分析和解決,證明制定嚴格的黑啟動計劃不僅可以迅速系統、降低事損失,而且對處理緊急狀或地區性解裂有重要意義。
  5. Intelligent counter digital frequency rotating speed line velocity display control transmit instruments are all adopt used advanced microprocessor for smart control. input is pulsed quantity or contect switch quantity signal, after cpu operation processing, count, rotating speed or line velocity will be clearly intuitional indicated by high brightness led numeral tube, at the same time, these signals can be changed into standard voltage current signal to transmit output. and have the functions of super - limited alarm, standard serial communication function

    簡易后備操作器接收從dcs系統或pid調節器給定的模擬量信號,正常控制時,操作器輸入輸出相當于直通的,以實現dcs系統或pid調節器對執行機構的自動控制,當前級dcs系統或pid調節器發生障時,操作器接收到障狀信號,即轉為手動控制狀,由按鍵控制操作信號的輸出,當障解除,儀表自動自動狀
  6. Are all adopt used advanced microprocessor for smart control. input is pulsed quantity or contect switch quantity signal, after cpu operation processing, count, rotating speed or line velocity will be clearly intuitional indicated by high brightness led numeral tube, at the same time, these signals can be changed into standard voltage current signal to transmit output. and have the functions of super - limited alarm, standard serial communication function

    接收從dcs系統或pid調節器給定的模擬量信號,正常控制時,操作器輸入輸出相當于直通的,以實現dcs系統或pid調節器對執行機構的自動控制,當前級dcs系統或pid調節器發生障時,操作器接收到障狀信號,即轉為手動控制狀,由按鍵控制操作信號的輸出,當障解除,儀表自動自動狀
  7. After that, the author discusses a novel solid states limiting technology and provides a single - phase solid states bridge current limiter and a main circuit topology of three - phase fault current limiter. it can be found that the new type of three - phase solid states bridge current limiter can handle the fault conditions more flexibly. it can not only remove the fault circuit, but also control the value of stable fault current to cooperate with the existing line three - segment relay

    繼而,介紹了一種新型固限流技術,給出了單相、三相限流器的主電路拓撲,分析了其基本工作原理和控制方式,指出以全控橋結構為基礎的變壓器耦合橋式限流器能夠更加靈活地處理電力系統的各種短路障,及時地限制短路電流,並與現有的線路三段保護相配合,還可根據需要實現及時切除障電路,在時軟重合閘。
  8. In this way, in case any subsystem failure, general system can on - line maintain in stead of stopping to maintain, so other subsystems can keep working normally during the maintenance of the failure subsystem ; secondly the general system can quickly resume to normal work state with high quality within the common working permission time of integrating system in case of any system development or failure maintenance

    當子系統出現障時,並不需要以停止整個系統的工作為代價,在維護障子系統期間,其它子系統仍然能夠正常工作,獨立的完成其自身的功能;其次在實現系統擴展或系統出現障時,系統能夠保持正常生產的許可條件下,力求高質量、迅速正常的生產狀
  9. In the paper, firstly, we studied the theory and key technologies of virtual operation environment, proposed the scheme to achieve ha and self - management and analyzed research aim of system, i. e. the system can dynamically manage resource, self healing, self optimizing according to the business requirements and load information, and self protecting

    本文首先對虛擬操作環境系統的理論基礎進行研究,提出了採用分區和集群技術相結合解決系統的高可用性,採用策略管理技術實現系統自律性的技術方案;並確立了系統的研發目標,即系統能實行資源的動配置、障的自動、根據業務要求或負載信息進行自我性能優化以及自我保護等功能。
  10. With transaction log backups, you can recover the database to the point of failure or to a specific point in time

    有了事務日誌備份,您就可以將數據庫障發生時刻或某個特定時刻的狀
  11. Here and now, face to the embarrassment of our country ’ s environment pirate relief question, due to the result of the environment pirate of charter, the author thought offer the punitive damages to the hostile, serious environmental torts. in this way can correct interests to be damaged to compensate the uneven phenomenon with interests in a certain degree. making inflictors undertake punitive damages, can not only recover the damage of the victim ' s material, spirit, but also let the hostile inflictor undertake to resume cost of the ecological environment, raise it infringe cost, weaken its economic base of infringing

    環境侵權救濟中引入懲罰性賠償,在具體制度建構上應當以有意或重大過失為主觀要件,以侵權人造成損害作為客觀要件;對環境侵權懲罰性的權利人、賠償義務人和具體賠償范圍加以界定;在懲罰性賠償金數額的確定上,以受害人所受的人身、財產、精神損失、環境權益的損失等為基礎,結合加害人主觀惡性大小、法律所期望產生的威懾力等因素加以判決;同時也有必要對懲罰性賠償制定相應的最高限額,並建立專門基金的方式對懲罰性賠償制度加以補充,以期更好地保護受害人的利益、環境。
  12. In the main body of this paper, the database design process is introduced, in which the database relation schema, data integrity and fault recovery are emphasized, and, the communication protocol designed for remote data acquisition is discribed and validated by petri nets, the develop method of client application and resolvent to some problems are also discussed, including the design of communication component, the asynchronous data return, how to dynamically return image to the client navigator in web application etc. finally, an abbreviated evaluation about the finished system is given

    在論文的主體部分,論文詳細介紹了數據庫的設計過程,其中主要涉及到關系模式的規范化、數據完整性和設計等,隨后,文章設計了一種用於遠程數據採集的通信協議,並使用petri網進行了描述和驗證,論文也介紹了如何進行客戶端應用程序的開發以及一些主要問題的解決,主要包括通信控制項的設計、採集數據的異步返回、在web應用程序中如何動為客戶端返回圖形等。最後,論文對整個系統做了一個簡單的評估。
  13. Even when he had satisfied himself that he was awake, mr. lorry felt giddily uncertain for some few moments whether the late shoemaking might not be a disturbed dream of his own ; for, did not his eyes show him his friend before him in his accustomed clothing and aspect, and employed as usual ; and was there any sign within their range, that the change of which he had so strong an impression had actually happened

    盡管羅瑞先生因為他已了正常而感到滿意,卻仍然糊塗了好大一會兒,不知道最近這做鞋的事是否是一個令人心煩意亂的夢。他不是明明看見他的朋友衣著如常神做著一向都做的事么?他眼前能有什麼跡象說明那給了他強烈印象的事確實出現過呢?
  14. A non - linear feed - forward loop is used to realize the coordinated control between the two controlled variables at the two control ends at first. secondly, a constant ac voltage control is implemented for a short period after the ac fault removal. finally, a staggered recovery strategy for different hvdc subsystems is also adopted, with the restart time interval of them optimized using the steepest descent gradient search method

    該協調策略的三個特點是:在常規的控制器結構中加入一個基於準穩工作點的非線性前饋迴路;在交流障被切除后的一個短暫時間內,逆變側採用定交流電壓控制:對不同的直流輸電子系統採取一種漸進的策略。
  15. In the end, the real - time aspects and fault / error recover of high - level task supervisor are discussed. in chapter 6, based on analysis of features of the task execution level of the acr prototype system control architecture, the task execution level is divided into situation / event surveillance, task execution control and fault / error recovery subsystems

    第六章對acr原型系統控制體系結構任務執行層的具體特性作了詳細分析,將任務執行層分解為狀/事件監視、任務執行控制以及障診斷與三部分,並分別針對這三部分的功能特性、組織結構以及運行機制等作了詳細描述。
  16. This was a good recovery after the engine dramas that stymied test driver anthony davidson on friday, and testament to the team thinking on its feet as they altered the way in which they ran the motors after the two blow - ups

    在周五測試車手安東尼-戴維森經歷了引擎障這是一次不錯的,而且是車隊在受到兩次爆缸之後因為改變比賽方式而狀的證明。
  17. In case of complicated dc circuit, any type of symmetrical ac system fault. dc line fault and dc line ' s recovery after fault can be more accurately simulated, and the dc line ' s dynamic response can be better represented. all the above is very important when doing the research on dc power support to ac system under emergency conditions, and has laid a solid foundation for the interaction study which will be met in a hybrid ac / dc power systems

    該模型能夠在對交流網路進行機電暫計算的同時,對直流網路進行電磁暫的計算,因而能較精確地考察暫過程中直流線路的動行為,並可對任意對稱的交流系統障、直流線路障以及障后直流輸電系統的等過程進行模擬,且模擬時間較短,為在雜系統中研究直流輸電系統與交流輸電系統間的相互作用奠定了基礎。
  18. When some failures happen, the database can recover to a consistent state and continue its service with the help of recovery system

    當數據庫出現障(硬體和軟體)時,機制負責在障排除后對其進行,使其回到正常狀,繼續提供數據庫服務。
  19. This occurs following a fault recovery process or when the system is returning to an online state after certain administrative procedures

    這種情況出現在下列過程之中或是系統完成某個管理過程之後回到在線狀時。
  20. The automatically switched optical network ( ason ) can configure the network intelligently according to the type and traffic of service and the network resources, so gives the optical network the ability of configurable bandwidth and dynamic end - to - end connection management. the network is firmly protected in mechanism and can be self recovered once unexpected accidents happen. so it is widely considered as the strategic technology in the next generation network

    自動交換光網路( ason )通過對業務進行分類,可以依據網路資源和業務流量對網路進行智能化配置,在網路障時提供強大的保護/能力,賦予了光傳送網實時提供可配置帶寬和動的端到端連接管理能力,被廣泛認為是下一代光網路的主流技術。
分享友人