抽水廠 的英文怎麼說

中文拼音 [chōushuǐchǎng]
抽水廠 英文
pumping plant
  • : 動詞1 (把夾在中間的東西拉出; 提取) take out (from in between) 2 (從全部里取出一部分; 騰出) ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 廠同「庵」 (多用於人名)
  • 水廠 : water works
  1. Water samples are taken regularly throughout the entire supply and distribution system. the sampling points include water treatment works, service reservoirs, trunk mains, connection points and domestic taps. the data from these samples are checked against the world health organization s guidelines for drinking - water quality, which were developed by experts from around the world

    在整個供及輸系統中,有關人員經常從濾、配庫、輸干管、供接駁位置和用戶取樣本進行化驗,鑒定化驗數據所顯示的質是否符合世界?生組織所訂定的飲用食質準則。
  2. Di - on electrics service and products cover the power electric field including power generation transmission distribution, power equipment manufacturing, subway, utilites, ac dc metrology field as well, more than 500 units of electric power utilities and stations such as beijing power supply bureau, guangzhou power supply bureau, baosteel, three gorges power station and more manufacturers like siemens, abb, alstom, bicc, pirelii, toshiba and more and 30 units of metrology institutes in china like nim, tsinghua university and more are our user. di - on electric is sole and exclusive distributor for numerous famous companies like transinor doble norway, measurements international canada, ndb canada, schuetz germany, aan germany, dr. strauss germany and etc, taking care of their business and service in p. r. china including hongkong

    絕大多數員工擁有本科和研究生以上學歷,在電力系統和計量系統工作多年,從事電力檢測帶電監測和計量測試儀器的技術服務和市場銷售工作長達10年以上,為約500多家電力工業系統的發供電部門如北京供電局,廣州電力局,深圳供電局,三峽電,廣州蓄能電,田灣核電站等等,科研調試部門如廣東省電力試驗研究所,湖北省電力試驗研究所等等與設備生產如siemens , abb , alstom , toshiba等等提供了國際最先進可靠的測試技術和儀器設備為約30多家國內二級以上相關計量科研院所,包括國家計量院,清華大學,中國運載火箭研究院,空間技術研究院,航天二院,成飛,西飛和各省市計量院,電力試驗研究院所等提供了大量最先進可靠的計量檢測儀器。
  3. Elliot pumping station and filters workmen s quarters

    西區站及濾工人宿舍
  4. S water treatment works and water pumping stations

    的濾站也會
  5. For radiation measurement of foodstuff samples collected at boundary control points, wholesale and retail markets, as well as drinking water samples collected at reservoirs, inlets and outlets of water treatment works, water catchment areas and consumer taps

    一共操作二十五臺食物食污染監測系統,分析在邊境管制站、各區批發市場及零售市場取的食物樣本,及在本港各塘、濾源出入口、集區及用戶龍頭取的食樣本。
  6. For radiation measurement of foodstuff samples collected at boundary control points, wholesale and retail markets, as well as drinking water samples collected at reservoirs, inlets and outlets of water treatment works, water catchment areas and consumer taps. locations of the food water contamination monitoring systems

    一共操作二十五臺食物食污染監測系統,分析在邊境管制站各區批發市場及零售市場取的食物樣本,及在本港各塘濾源出入口集區及用戶取的食樣本。
  7. Displacement function means for calculating geostress in fem analysis of underground houses is used, based on crustal stress data of underground cavern of pump water station of tong guanshan yixing to store energy, applying the displacement function theory and 3d nonlinear fem, the thesis simulates a displacement field applied the boundary in engineering area and obtain the initial crust stress field through load function in ansys. the result shows that the error between regressed ones and actual ones is controlled in allowed limit and supply the important data for building and design

    根據宜興銅官山蓄能電站地下房區的地應力實測資料,運用位移函數法理論,採用三維非線性有限元計算方法,反演出施加在房區邊界上的位移場,藉助州sys有限元分析軟體,獲取模型邊界節點的坐標信息,然後通過ansys軟體的載荷函數將邊界位移程序化施加到模型邊界上,最後得到整個區域的初始地應力場,結果表明回歸后的地應力值與實測值接近,為地下工程的施工設計提供了重要的資料。
  8. Measurement of nox levels in chimneys of a recycling factory in fanling and ambient nox impact due to the chimneys

    大嶼山污站的硫化氫測量粉嶺循環製造氮氧化物測試及周圍
  9. These include operations and maintenance services for key airport authority engineering plant and systems such as airfield e & m installations and systems - - airfield lighting, airfield hvlv & emergency power generating systems, aerobridges, preconditioned air systems for planes, trunked mobile radio system, baggage handling system, aircraft parking aids, pumping systems, air - conditioning system in the passenger terminal building, as well as wastewater treatment plant

    而服務所涉及的主要設施則包括飛行區照明系統、高低壓及緊急供電系統、登機橋、為停于地面的飛機提供預校空氣系統、集群流動無線電通話系統、行李處理系統、飛機停泊輔助設施、系統、機場客運大樓空調系統以及污處理
  10. Shortly after the surveying work started the war broke out and the government was forced to halt the project. it was not until after the war in 1947, that the planning of the tai lam chung reservoir re - commenced

    1947年,籌建大欖涌塘計劃重新開展,草擬的藍圖包括了壩、輸隧道、輸管、站、濾、配庫等工程。
  11. Stars electric successfully run a self - developed governing system in jilin baishan revisable pump powerstation, and became the unique domestic manufacturers who has design and manufacture experience of governing system of large revisable pump type turbine

    事達電氣自行研製開發的蓄能機組調速系統在吉林白山電站成功投運,成為在大型蓄能機組上唯一有運行業績的國內調速器生產家。
  12. Water supplies - fresh water supplies - additional treatment and water transfer facilities for the metropolitan area and north - eastern new territories - stage 1, construction of tai po treatment works and pumping station

    教育-中學供-食供應-都會區及新界東北部增添濾及輸設施第1階段,大埔濾站建造工程
  13. Three dimensional stability analysis on surrounding rock of underground houses of xilongchi pumped storage hydro - power station

    西龍池蓄能電站地下房圍巖穩定三維非線性分析
  14. In response to press enquiries on whether the quality of dongjiang water would be adversely affected by the effluent from a factory at huizhou, a spokesman for the water supplies department ( wsd ) said today ( october 4 ) that stringent daily monitoring of water was carried out at muk wu pumping station ( mwps ), where dongjiang water is received in hong kong, to ensure the water received is up to standard

    輸港東江質受到嚴格監察就新聞界查詢有關惠州一間工的污染物會否對東江質有負面影響,務署發言人今日(十月四日)強調,輸港東江質每天均在香港接收東江的木湖站受到嚴格監察,以確保質符合標準。
  15. Make use of these achievement and test data, the numerical computation of ming tomb underground power station was carried out, and its average elastic modulus and the elastic resisting force of surrounding rock were obtained

    結合十三陵蓄能電站地下房結構的振動測試資料,對其進行動力反演計算分析,得到房混凝土材料的平均動彈模和混凝土與外圍巖石之間的傳力形式。
  16. Random screening is also applied to foodstuffs at wholesale and retail markets in hong kong, and drinking water in reservoirs, inlets and outlets of water treatment works, water catchment areas and consumer taps

    全港各區批發市場及零售市場所售買的食物及各塘濾源出入口集區及頭的質也會樣檢查。
  17. Sham shui po no. 1 and no. 2 sewage screening plant and north west kowloon preliminary treatment works are screening plants and are not equipped with pumping facilities

    ?一、二期污隔篩和西北九龍基本污處理是隔篩,並未設有設施。
  18. A former director of a piling company was sentenced to four years imprisonment for his role in a short piling scam at a construction site of the central and wan chai east pumping stations and screening plants

    一名樁柱分判公司前董事,于中環及灣仔東站及污隔濾工程其中一個地盤串謀建造短樁,被判入獄四年。
  19. Construction work for the two treatment works at tai po and ngau tam mei and for the sham tseng treatment works stage ii was in progress. construction continued of the additional service reservoirs, pumping stations and water supply networks in kowloon west and south, pok fu lam, wan chai, western and central areas on hong kong island, tseung kwan o, sheung shui, tuen mun, tin shui wai and yuen long

    位於大埔和牛潭尾的兩座濾,以及深井濾第二期的建築工程正在進行。在九龍西南部、薄扶林、灣仔、港島中西區、將軍澳、上、屯門、天圍及元朗增建的配庫、站和供網路的建造工程繼續進行。
  20. Analysis of the underground works in - situ stress measurement of shenzhen pumped storage power station

    深圳蓄能電站地下房地應力測試成果分析
分享友人