  1. The principa1 component affecting and determining capabi1ity of vacuum conditioning p1ant is vapor ejecting pump vacuum system. vapor ejecting pump is an optimai method for vacuum conditioning plant acquiring vacuum

    影響和決定真空回潮性能的最主要的成部分是真空系統,蒸汽噴射泵作為真空系統已成為真空回潮獲得真空的最佳方式。
  2. In this paper, the design philosophy and configuration of the power generation / motor - transformer group relay protection, as well as the design characteristics of the protection system for the pumped storaged units in huilong power station

    文章介紹了回龍電站發電電動變壓器繼電保護的設計原則、配置方案及蓄能保護的設計特點。
  3. Develop and manufacture large pumped storage units, large tubular turbine units, high - power super - critical thermal power unit, large air - cooled turbine generator, large cfb boilers, high - power nuclear steam turbine and generator, pressure shell of nuclear island, high - pressure evaporator and primary pump

    開發生產大型蓄能、大型貫流式、大功率超臨界火電、大型空冷汽輪發電、大型循環硫化床鍋爐、大功率核電站汽輪和發電、核島設備壓力殼、高壓蒸發器和主泵等核電一級設備。
  4. The overhaul of power units are arranged in terms of peaking capacity balance and the power loads are dispatched based on the principle of equal incremental coal consumption rate in the new method, which is anticipated to solve the economic operation of the power system

    實際上,蓄能電站的容量效益與電網的負荷平、負荷曲線形狀和常規電的比重有關,而節煤效益除與負荷平、負荷曲線形狀有關外,還與電網的電源結構、火電的動力特性有關。
  5. Economical operation of pumped storage station online

    蓄能在線經濟運行
  6. Start - up test code for reversible pump - storage units

    可逆式蓄能起動試驗規程
  7. Condition monitoring, analysis and diagnosis system of a 300 mw pumped storage power unit

    蓄能振動狀態監測分析診斷系統研究
  8. This paper studies the structure optimization of 300mw unit thermodynamics system, including the drain - back system, the vacuum extractor system, the cooling spray system, the recovered system of the blow down water, and the accessory steam system

    本文從結構上對300mw級火電熱力系統進行了優化研究,主要包括:回熱系統、真空氣系統、給減溫系統、排污回收利用系統以及輔助蒸汽系統。
  9. The pressure existing between the guide vane and the runner when the pump - turbine of east china tongbai pumped storage power station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker ( gcb ) switches off during operation of the pump - turbine is illuminated

    摘要介紹華東桐柏蓄能電站的泵運行時,不同負荷工況下停、導葉和轉輪間壓力的變化,闡述了華東桐柏蓄能電站1號發電斷路器開斷的最佳負荷值選定。
  10. This control system adopts creditable plc for real control ; it sends many simulating signals collected by old sand temperature of inlet, suction opening temperature of double disk, inner sand temperature of double disk, current of mainframe and current of fan ; meanwhile, the operation signal and switching value signal outputted by material movement transducer is inputted to switching value module of plc ; it gets evidence of water feeding after cpu account ; the operation result of cpu is outputted by switching value of plc to control unlock combination of coarse, middle and thin water feeding electromagnetically operated valve and then gets different water feeding quantity

    該控制系統採用高可靠性的plc可編程序控制器進行實時控制,傳感器所採集的入口舊砂溫度雙盤風口溫度雙盤內砂溫主電電流及鼓風電流等模擬量信號直接輸入plc的模擬量採集模塊,同時加砂設備運轉信號及加砂設備物料移動檢測傳感器發出的開關量信號輸入plc的開關量模塊,由cpu獲取經運算而得到加計算依據, cpu運算結果直接由plc的開關量輸出控制粗中細加電磁閥的開啟合,而得到不同的加量。
  11. The shahe pumped - storage power station with two 50mw reversible units has been in good conditions on general since it was put into operation, but there still were some defects, such as the failure of unit ' s contemporaneous device, the insufficient cooling water discharge and pressure, and the failure of static frequency converter and excitation overcurrent

    摘要沙河蓄能電站兩臺50mw可逆式自投運以來,總體情況良好,但是也出現了一些缺陷,如同期裝置故障,冷卻流量或壓力不足,靜止變頻器故障,勵磁過電流故障等。
  12. These equipments are vacuum system which is made up of diffusion pump, pipes, water - cooling baffle and rotary vane pump ; the whole chamber, wall and water - cooling wall are made of stainless steel ; the lower part is equipped with cool water sleeve which can fast take out air to gain 10 - 4 or higher vacuum, therefore they are widely used in high - tech fields, such as the platting, electronic, metallurgy, chemical engineering, atomic energy, materials and medicine etc

    Kt系列擴散泵是由凸腔擴散泵管道冷擋板械泵等成的高真空系統,整個泵腔泵壁及冷壁全部由不銹鋼作成,下部配有降溫用急冷套,氣速度快,極限真空高,它可使被容器獲得10 - 4或更高的高真空,因此廣泛適用於鍍膜裝飾電子冶金化工原子能材料醫藥等等各種高新技術領域。
  13. The paper is written by way of background as remote monitor system in tianshi pump station as well as my own factual labor fruit, in order to carry on discussing about research and construction of remote monitor system for large - scale pumping station. the paper mainly deals with five aspects : 1. describing problems existed now and trend in the future on remote monitor system for large - scale pumping station. 2. providing network integration project of constructing remote monitor system for large - scale pumping station

    本文是以田市站遠程監控系統為背景,結合筆者實際工作成果所撰寫的,旨在對大型泵站監控系統的建設進行研究與探討,全文主要涉及到以下五個方面: 1 、論述了大型泵站監控系統目前存在的問題和今後發展趨勢; 2 、提出了建大型泵站監控系統的網路集成方案; 3 、提出了利用com 、 dcom 、 activex 、 opc件技術實現各種監控系統之間的集成方案,並在田市站實現閉路視頻監控網路、配網自動化網路和控制網路的無縫集成; 4 、進行監控系統通訊軟體分析與開發,實現監控系統與第三方設備通訊; 5 、結合大型泵站一般特點,引入聚類融合控制,實現田市站的優化控制。
  14. Stars electric successfully run a self - developed governing system in jilin baishan revisable pump powerstation, and became the unique domestic manufacturers who has design and manufacture experience of governing system of large revisable pump type turbine

    事達電氣自行研製開發的蓄能調速系統在吉林白山電站成功投運,成為在大型蓄能上唯一有運行業績的國內調速器生產廠家。
  15. To be the chief technical principal in charge of the research and development of the pumped - storage unit control ; and in charge of major research subjects and to be engaged in the technical research and development of the automation and control system for the pumped - storage unit

    蓄能控制研發技術總負責,重大課題技術負責人,從事蓄能電站自動化及控制系統的技術研究與開發。
  16. In light of the complexities of the technologies and the larger gap and the demands in the aspects of scientific research, design and manufacture of the units in china, it is necessary to accelerate the nationalization of the equipments for the units from only importing the equipments to importing the equipments along with the technologies at the same time by tendering, so as to realize the nationalization and localization of the manufacture of the equipments and to enhance the technical level and the quality of the equipments through the competition concerned as soon as possible

    鑒于蓄能技術的復雜性、我國在科研與設計製造方面的差距和需求量很大的現狀,加快蓄能設備國產化的進程已成為當務之急,從引進設備到打捆招標,在引進設備的同時引進技術,盡快實現國產化和本土化生產製造,通過競爭和擇優比價來提升技術平和產品質量。
  17. When the water head and the flow are given, we can regulate the pump ' s blade mounting angle to control the discharge of pump in this pumping station that contains only one type of pump. we also can determine the number of running machines with machine ' s optimal combination. so we can reduce its energy consumption, and make it run optimally and economically

    頭和流量給定時,這類泵型單一的泵站,可以通過調節泵的葉片角度,控制泵的流量,併合理確定開臺數,通過間的優化合,使整個泵站的能耗最少,達到整體最優、經濟運行的目的。
  18. The sediment problems of this project in design is that the deposition of sediment causing the permanent loss of reservoir capacity. the measure of enlarging the discharging of water and sediment can reduce deposition, but the concentration of sediment is bigger and much sediment passes through the pump - turbines

    減少庫庫容淤積損失,加大排沙量,會造成在發生洪時期庫內含沙量加大,時會有更多的泥沙過因泥沙而磨損。
  19. Operations of the power corporation include power energy sending, purchasing, selling, pumped storing and timed balancing. in the model trading price and trading quantities of all operations are considered as model parameters, as well as operating profit as model objects. at the same time the response of user rose by price quivering, generation cost curve and unit parameters of independent power plant and pumped storage are considered as restriction

    帶獨立電源電力公司包含上網、購電、售電、蓄能和實時平衡等運營業務,模型以各業務環節中的交易電價和交易電量為參數,以電力公司日運營收益最大為目標,並考慮了用戶對電價波動的響應以及獨立電廠、蓄能電廠的發電成本曲線和參數等約束條件。
  20. So, it ’ s of particularity and application value to study the air distribution of the station. according to the air ventilation and air conditioning ’ s model experiment of the thermal environment ’ s peculiarity in the underground powerhouses of the langya - mountain hydropower station, this paper presents the research on the distribution of temperature and velocity in the main underground working units

    本文結合瑯琊山蓄能電站地下主廠房熱態模型試驗項目的後期模型試驗研究任務,進行該電站頂送風地下主廠房通風空調熱環境特性的模型試驗和數值計算,著重對地下主廠房發電層的氣流織優化及空間溫度和速度分佈性狀進行研究。