抽水站容量 的英文怎麼說

中文拼音 [chōushuǐzhànróngliáng]
抽水站容量 英文
pumping plant capacity
  • : 動詞1 (把夾在中間的東西拉出; 提取) take out (from in between) 2 (從全部里取出一部分; 騰出) ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 抽水站 : (揚水站; 泵站) pump [lift] station抽水站抽水能力 pumping plant capacity
  • 抽水 : 1. (用水泵吸水) draw [pump] water 2. (縮水) (of cloth through wetting) shrink
  1. Static benefits are generated from peaking and valley - filling, which are further divided into capacity benefits and coal saving benefits. dynamic benefits come from its fast starting and flexible operation, including frequency regulation, synchronous condenser operation, fast coverage of steep load gradient and synchronous spinning reserve. as for the calculation of static benefits of pumped storage plant, the alternative coefficient method is normally adopted at present

    目前在蓄能電的靜態效益計算中,一般採用替代系數法,即用蓄能電的裝機乘以替代系數( 1 . 05 1 . 1 )計算蓄能電的替代;用蓄能電的發電乘以電替代系數( 1 . 05 )計算替代電的發電,再根據循環效率的大小計算蓄能電的燃料消耗。
  2. The overhaul of power units are arranged in terms of peaking capacity balance and the power loads are dispatched based on the principle of equal incremental coal consumption rate in the new method, which is anticipated to solve the economic operation of the power system

    實際上,蓄能電效益與電網的負荷平、負荷曲線形狀和常規電的比重有關,而節煤效益除與負荷平、負荷曲線形狀有關外,還與電網的電源結構、火電機組的動力特性有關。
  3. Quantity of generating electricity should be also calculated while the river inflow, quantity of water transfer and its duration curve are taken into account. as a company, it is necessary to take a series of measures to increase its benefits while water transfer leads to the decrease of hydro power inevitablly. the efficient methods can be taken into account as follows : i ) to improve the forecast accuracy, to decrease surplus water, and to increase seasonal electricity energy, ii ) to raise the peaking ability of dan jiang kou power station to obtain peaking benefits, iii ) to choose a suitable site to construct a pumped storage plant for peaking benefits

    在進行以上四方面內深入探討的基礎上,論文針對丹江口利樞紐運行任務、運行方式的重大變化,提出漢江集團應採取以下因應措施以適應企業產業結構的調整,這些措施包括:準確計算發電效益減少值;合理地核算源的供成本;以上述兩項計算成果為基礎,核算企業結構調整后總效益變化;提高預報平,減少棄,爭取增發季節性電能;研究新的調度方式,提高電調峰能力,提高電效益;在適當的地點修建蓄能電,提高電的調峰能力。
  4. The plans included the establishment of dams, for the purpose of increasing the reservoir s capacity to 194 million gallons, the construction of pumping stations and the installation of pumping machines

    漆鹹的計劃草案較具體的工程內包括了興建壩(使增加至1 . 94億加侖) 、及加設機,整體工程費用預算為78萬港元。
  5. As an advanced power generation and adjusting speed technology of a. c motor, a. c excited machines ( acem ) can be applied in power generation using a variable - speed constant - frequency scheme to produce electricity, in a pumped - storage hydraulic power plants, and in high rate variable speed drive fields

    交流勵磁技術是一種先進的交流電機發電及調速技術,可用於變速恆頻發電、蓄能電和大調速場合,能實現電機有功功率、無功功率的獨立調節和功率因數控制。
  6. Fifthly, make a study on the pricing of the spinning reserve capacity under the known spinning reserve demand level

    第五,在前述研究基礎上進行確定性備用平下蓄能電旋轉備用電價研究。
  7. First, discuss the economic meaning of the pumped storage economic operation while considering it ' s spinning reserve function, based on this, a pricing model was made, and used the probabilistic production simulation technique as a tool for the analysis of the cost

    首先進一步探討蓄能電在考慮旋轉備用功能時經濟運行的內涵,在此基礎上建立了相應定價模型;其次以時序隨機生產模擬技術為工具進行了成本分析和定價研究。第六,進行兼顧可靠性與經濟性蓄能電旋轉備用定價策略研究。
  8. The adopted alternative coefficient for capacity is from 1. 05 to 1. 10 and for electric generation 1. 05. in fact, the capacity benefits are related to maximum load, load curve and the weight of hydropower power capacity. while the benefits of coal consumption saving are related to load consumption characteristic and power structure in addition to maximum load and load curve of the power system

    當系統的電(含蓄能)比重較小時, 1 . 05 1 . 1替代系數可能偏小;而當蓄能電佔有一定比重時,這種方法又可能過高地估計了蓄能電效益,因為它未能考慮某些月份蓄能電可能出現的空閑
分享友人