抽水蓄能機組 的英文怎麼說

中文拼音 [chōushuǐnéng]
抽水蓄能機組 英文
pump storage groups
  • : 動詞1 (把夾在中間的東西拉出; 提取) take out (from in between) 2 (從全部里取出一部分; 騰出) ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 動詞1. (儲存; 積蓄) store up; save up 2. (留著而不剃掉) grow 3. (心裏藏著) entertain (ideas); harbour
  • : 能名詞(姓氏) a surname
  • : machineengine
  • : Ⅰ名詞1 (由不多的人員組成的單位) group 2 (姓氏) a surname Ⅱ動詞(組織) organize; form Ⅲ量詞(...
  • 抽水 : 1. (用水泵吸水) draw [pump] water 2. (縮水) (of cloth through wetting) shrink
  • 蓄能 : energy storage蓄能器 accumulator
  • 機組 : 1 [工業] (一組機器) set; assembling unit; machine set; plant unit; team; unit assembly 2 (飛機...
  1. In this paper, the design philosophy and configuration of the power generation / motor - transformer group relay protection, as well as the design characteristics of the protection system for the pumped storaged units in huilong power station

    文章介紹了回龍電站發電電動變壓器繼電保護的設計原則、配置方案及抽水蓄能機組保護的設計特點。
  2. Develop and manufacture large pumped storage units, large tubular turbine units, high - power super - critical thermal power unit, large air - cooled turbine generator, large cfb boilers, high - power nuclear steam turbine and generator, pressure shell of nuclear island, high - pressure evaporator and primary pump

    開發生產大型抽水蓄能機組、大型貫流式、大功率超臨界火電、大型空冷汽輪發電、大型循環硫化床鍋爐、大功率核電站汽輪和發電、核島設備壓力殼、高壓蒸發器和主泵等核電一級設備。
  3. The overhaul of power units are arranged in terms of peaking capacity balance and the power loads are dispatched based on the principle of equal incremental coal consumption rate in the new method, which is anticipated to solve the economic operation of the power system

    實際上,電站的容量效益與電網的負荷平、負荷曲線形狀和常規電的比重有關,而節煤效益除與負荷平、負荷曲線形狀有關外,還與電網的電源結構、火電的動力特性有關。
  4. Economical operation of pumped storage station online

    抽水蓄能機組在線經濟運行
  5. Start - up test code for reversible pump - storage units

    可逆式抽水蓄能機組起動試驗規程
  6. Condition monitoring, analysis and diagnosis system of a 300 mw pumped storage power unit

    抽水蓄能機組振動狀態監測分析診斷系統研究
  7. The pressure existing between the guide vane and the runner when the pump - turbine of east china tongbai pumped storage power station stops at different loads is analyzed, and the method for determining the best load at which the generator circuit breaker ( gcb ) switches off during operation of the pump - turbine is illuminated

    摘要介紹華東桐柏電站的泵運行時,不同負荷工況下停、導葉和轉輪間壓力的變化,闡述了華東桐柏電站1號發電斷路器開斷的最佳負荷值選定。
  8. The shahe pumped - storage power station with two 50mw reversible units has been in good conditions on general since it was put into operation, but there still were some defects, such as the failure of unit ' s contemporaneous device, the insufficient cooling water discharge and pressure, and the failure of static frequency converter and excitation overcurrent

    摘要沙河電站兩臺50mw可逆式自投運以來,總體情況良好,但是也出現了一些缺陷,如同期裝置故障,冷卻流量或壓力不足,靜止變頻器故障,勵磁過電流故障等。
  9. Stars electric successfully run a self - developed governing system in jilin baishan revisable pump powerstation, and became the unique domestic manufacturers who has design and manufacture experience of governing system of large revisable pump type turbine

    事達電氣自行研製開發的抽水蓄能機組調速系統在吉林白山電站成功投運,成為在大型抽水蓄能機組上唯一有運行業績的國內調速器生產廠家。
  10. To be the chief technical principal in charge of the research and development of the pumped - storage unit control ; and in charge of major research subjects and to be engaged in the technical research and development of the automation and control system for the pumped - storage unit

    抽水蓄能機組控制研發技術總負責,重大課題技術負責人,從事電站自動化及控制系統的技術研究與開發。
  11. In light of the complexities of the technologies and the larger gap and the demands in the aspects of scientific research, design and manufacture of the units in china, it is necessary to accelerate the nationalization of the equipments for the units from only importing the equipments to importing the equipments along with the technologies at the same time by tendering, so as to realize the nationalization and localization of the manufacture of the equipments and to enhance the technical level and the quality of the equipments through the competition concerned as soon as possible

    鑒于技術的復雜性、我國在科研與設計製造方面的差距和需求量很大的現狀,加快抽水蓄能機組設備國產化的進程已成為當務之急,從引進設備到打捆招標,在引進設備的同時引進技術,盡快實現國產化和本土化生產製造,通過競爭和擇優比價來提升技術平和產品質量。
  12. Operations of the power corporation include power energy sending, purchasing, selling, pumped storing and timed balancing. in the model trading price and trading quantities of all operations are considered as model parameters, as well as operating profit as model objects. at the same time the response of user rose by price quivering, generation cost curve and unit parameters of independent power plant and pumped storage are considered as restriction

    帶獨立電源電力公司包含上網、購電、售電、和實時平衡等運營業務,模型以各業務環節中的交易電價和交易電量為參數,以電力公司日運營收益最大為目標,並考慮了用戶對電價波動的響應以及獨立電廠、電廠的發電成本曲線和參數等約束條件。
  13. So, it ’ s of particularity and application value to study the air distribution of the station. according to the air ventilation and air conditioning ’ s model experiment of the thermal environment ’ s peculiarity in the underground powerhouses of the langya - mountain hydropower station, this paper presents the research on the distribution of temperature and velocity in the main underground working units

    本文結合瑯琊山電站地下主廠房熱態模型試驗項目的後期模型試驗研究任務,進行該電站頂送風地下主廠房通風空調熱環境特性的模型試驗和數值計算,著重對地下主廠房發電層的氣流織優化及空間溫度和速度分佈性狀進行研究。
分享友人