抽水量 的英文怎麼說

中文拼音 [chōushuǐliáng]
抽水量 英文
pump discharge
  • : 動詞1 (把夾在中間的東西拉出; 提取) take out (from in between) 2 (從全部里取出一部分; 騰出) ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 水量 : water yield; the yield of water水量計[表] watermeter; 水量平衡 water balance; 水量收支 water budget
  1. In the study of the lumber carrier, one of the very important problem is the in spot and ultimate station due to flooding which will bring tremendous threat to the ship because of the few holds in order to study the lumber carrier buoyancy, stability and longitudinal strength under the condition of flooding, the paper adopt fundamental ship principle and iterative and accumulative concept on the basis of insumersibility theory to detailedly calculate the flooding speed flooding amount front draft after draft stability and longitudinal strength considering the ship " s sinking and inclination which will change the center of gravity and the loading station both in hold and on deck and the effect of flooding and lumber amount in holdo in the last, the paper introduces an example of the actual ship named " fei yun ling " and makes a contrast between not taking measure and taking measure which draws a reasonable conclusion and comes up to some advice the method avoids the cockamamie calculating while insures enough precision the paper draws a conclusion that not all the lumber carrier will submerge when suffering the damaged flooding if the loading or measure is suitable

    為了研究運木船舶在破艙狀態下的浮性、穩性和強度,本文在抗沉性理論的基礎上,運用船舶基本原理,採用了迭代和累計的思想,將船舶的進過程劃分為很多次進的積累,詳細計算了運木船在破艙進的過程中,考慮到各種破艙參數、船舶本身的下沉、艙室內木材、甲板貨的裝載情況和在進過程中船舶本身的傾斜對進重心的影響,以及艙室內的進和木材對破口處進速度的影響,船舶總的進速度、進、首尾吃、穩性的實時狀態和最終船舶的總縱強度,給出了計算實例,並進行了在採取用泵前後浮態參數的對比,得出了該船舶在艙室內的貨物積載達到某個數值時可以保證船舶在破艙進時不會沉沒,或者在當開口小於某數值時,採取適當的措施后,可以使船舶避免沉沒。
  2. The agency said a person could inhale more than 100 times more smoke in a hookah session than in a single cigarette. by delivering nicotine, the water pipe could cause addiction

    該組織稱,人在煙時的攝取超過同樣吸一支香煙的一百倍。煙能通過釋放尼古丁使人上癮。
  3. This procedure can imitate the single well pumps water the chronometer calculates at all point water level in district declines deep with horary variety ; study the sport law of the rivers ; solve definitely flow draw water issue wanton boundary the wells of termses, predict that dives under water in the location, guide and construct and excavate the progress, appraise the rationality of the precipitation scheme

    此程序可以模擬單井時計算區域各點位降深隨時間的變化,研究流運動規律;求解任意邊界條件下的井定流問題,預測潛位,指導施工開挖進度,評價降方案的合理性。
  4. The specific capacity obtained from pumping teat generally does not reflect the water abundance of aquifer and so cannot be taken as the basis for the selection of the exploited horizon of groundwater

    試驗獲得的單位涌一般不反映含層的富性,不宜依它來選擇地下的開采層位。
  5. He gazed about him in his toga and he said : it is meet to be here. let us construct a watercloset

    身穿寬大長袍的他,四下里打了一下,然後說,這是個適當的地方,我們裝個馬桶吧。 」
  6. Six - liter water closets equipped with a dual flushing device

    裝有雙沖裝置的6升容馬桶
  7. According to the engineering practice, the theoretical basis and method that survey directly the horizontal distance and height difference by the total station system as fourth grade and below fourth grade control network are put forward instead of surveying slant distance and zenith distance

    摘要根據工程實踐,提出了用全站儀直接測平距、高差來代替測斜距、天頂距作四等及四等以下控制網測的理論依據和方法,並以張河灣蓄能電站施工控制網為例進行了比較計算。
  8. Static benefits are generated from peaking and valley - filling, which are further divided into capacity benefits and coal saving benefits. dynamic benefits come from its fast starting and flexible operation, including frequency regulation, synchronous condenser operation, fast coverage of steep load gradient and synchronous spinning reserve. as for the calculation of static benefits of pumped storage plant, the alternative coefficient method is normally adopted at present

    目前在蓄能電站的靜態效益計算中,一般採用替代系數法,即用蓄能電站的裝機容乘以容替代系數( 1 . 05 1 . 1 )計算蓄能電站的替代容;用蓄能電站的發電乘以電替代系數( 1 . 05 )計算替代電站的發電,再根據循環效率的大小計算蓄能電站的燃料消耗。
  9. Through summarization for complicated geohydrology and engineering geology condition of research area, the non - stability 3 - dimension flow model of ground water and land subsidence model were established in this thesis. the coupled models of ground water and land subsidence were combined with a large series of water level observation and land subsidence information to debug the parameters and ascertain the models

    兩者通過含層的位內在聯系耦合在一起,並根據研究區文地質條件及試驗資料,結合大位觀測序列資料及地面沉降觀測資料對模型進行調參,標定地下熱運移的三維有限元數值模型,所建模型可以對地下位及地面沉降同時進行模擬預測。
  10. Di - on electrics service and products cover the power electric field including power generation transmission distribution, power equipment manufacturing, subway, utilites, ac dc metrology field as well, more than 500 units of electric power utilities and stations such as beijing power supply bureau, guangzhou power supply bureau, baosteel, three gorges power station and more manufacturers like siemens, abb, alstom, bicc, pirelii, toshiba and more and 30 units of metrology institutes in china like nim, tsinghua university and more are our user. di - on electric is sole and exclusive distributor for numerous famous companies like transinor doble norway, measurements international canada, ndb canada, schuetz germany, aan germany, dr. strauss germany and etc, taking care of their business and service in p. r. china including hongkong

    絕大多數員工擁有本科和研究生以上學歷,在電力系統和計系統工作多年,從事電力檢測帶電監測和計測試儀器的技術服務和市場銷售工作長達10年以上,為約500多家電力工業系統的發供電部門如北京供電局,廣州電力局,深圳供電局,三峽電廠,廣州蓄能電廠,田灣核電站等等,科研調試部門如廣東省電力試驗研究所,湖北省電力試驗研究所等等與設備生產廠如siemens , abb , alstom , toshiba等等提供了國際最先進可靠的測試技術和儀器設備為約30多家國內二級以上相關計科研院所,包括國家計院,清華大學,中國運載火箭研究院,空間技術研究院,航天二院,成飛,西飛和各省市計院,電力試驗研究院所等提供了大最先進可靠的計檢測儀器。
  11. This article is based on statistic and analysis of the long - term observation data of the groundwater in the karst basin from 1987 to 2005 and systematically discusses the water level of karst groundwater, the pumping volume and the carved distribution regulation because of over - pumping water and puts forward some specific measures to reasonably development and utilization of groundwater resources

    摘要通過覆蓋型盆地巖溶盆地中取深井1987年2005年盆地地下長觀資料統計分析,系統探討了宕溶地下位、取以及產生的塌陷分佈規律,提出了合理開發利用地下資源的具體措施。
  12. This paper studied the effect of soil water content on barley at different growth stages, through the study, we found the sensitive stages of barley to water and salt is the stem elongation and spike formation stages

    研究表明,大麥對鹽最敏感時期發生在拔節穗期,土壤含(占飽和含的體積百分數)上限值確定為80 . 4 ,耐鹽漬天數為3 . 2天。
  13. For studying the regulation rules of the sediment of the second phase project, and studying the reservoir capacity loss caused by deposition, the amount of sediment passing through the turbines, and the deposition and flow regime near the intake of the pump - turbines, the deposition of the reservoir was studied

    為了研究蒲石河蓄能電站二期工程泥沙調度方案,對多個方案的庫淤積損失、過機沙、取口附近的泥沙淤積和流流態,進行了庫沖淤研究。
  14. The load, water, and power dispatching system model based on real - time information system sis for tianhuangping pumped - storage power station is introduced in the aspects of system design, development, and debugging

    摘要就天荒坪蓄能電站基於實時信息系統sis平臺的負荷、庫調度、電系統模型的設計、建立、開發和調試工作進行了說明和介紹。
  15. The quantity of water that can be drained out is called the specific yield.

    能夠出的稱之為單位給
  16. " the metal in subject - cadmium is also monitored by the environmental protection bureau of guangdong province at the dongjiang main stream outside taiyuan pumping station where donjiang water is abstracted and the monitoring results are also available at wsd s websites - www. info. gov. hkwsd

    廣東省環保局亦在取東江的太園站外對東江干主流原的鎘含有嚴格監察,並將監察數據上載於務署的網頁:
  17. Those pumps will now have to shut down for much of the year, reducing water output by up to a third

    那些泵現在不得不基本停閘至年尾,抽水量減少了1 / 3 。
  18. The results show that the wellhole and pumping condition, such as depth of the pump, quantity of pumping, all have great influence on the observational result

    結果表明,井孔條件,條件,如泵深度、抽水量等因素的改變對觀測結果產生較大影響。
  19. This included firstly the construction of a new reception tank and a pumping station at muk wu to strengthen the raw water reception capability. secondly, additional water mains were laid to strengthen the transfer between river indus pumping station with plover cove reservoir

    17億元改善東江供計劃,第一部份在木湖興建一個新蓄池及站,加強輸入廣東省原設備,第二部份是由梧桐河站至船灣淡湖興建輸管,增加梧桐河抽水量
  20. But for the reservoir water - supply system, the reservoir whose oam cost is low and flow into the reservoir is more may be selected to be taken advantage of the storage capacity of this kind of increase to regulate some water yield more and in order to substituting the water supply of the other water supply projects whose oam cost is comparatively higher, so that to achieve the goal of the oam saved, that is to say, that can utilize this regulation capacity increased of the reservoir to optimize operation between the raw water systems so that to save the oam of the system. namely, it can obtain a certain economic benefits to utilize this kind of difference between water supply ability and reality water - using levels existing for a long time

    從長春市供系統長期規劃和目前供現狀研究得出,在目前和今後的長時期內長春市供系統的供能力總是大於實際用平。這種長期存在的差別對松花江供只意味著減少抽水量。但對庫工程供系統則可挑選運行費用低的、入庫較多的某個庫,利用這種增加的調節庫容多調節出一些,以替代運行費用較高的供工程的供
分享友人