拆模時間 的英文怎麼說

中文拼音 [chàishíjiān]
拆模時間 英文
striking times
  • : 拆動詞[方言] (排泄大小便) excrete
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • : shí]Ⅰ名1 (比較長的一段時間)time; times; days:當時at that time; in those days; 古時 ancient tim...
  • : 間Ⅰ名詞1 (中間) between; among 2 (一定的空間或時間里) with a definite time or space 3 (一間...
  • 時間 : time; hour; 北京時間十九點整19 hours beijing time; 上課時間school hours; 時間與空間 time and spac...
  1. Since the boundaries between countries are getting vague, the wall between people is removed. indeed, it is the time for us to say " we are the world "

    隨著國家之的界限更糊,而人們之的藩籬也被去,這的確是一個我們可以說我們是四海一家的候。
  2. Research on form stripping age of underground works

    地下工程襯砌拆模時間研究
  3. ( 2 ) the stress caused by heat of hydration during construction is mainly distributed in the beams, and girders and stress in slab was smaller ; during service process, the stress caused by difference in temperature in different seasons is mainly distributed in bottom components ; the stress caused by difference of inside and outside temperature is mainly distributed in peripheral components of building ; the stress caused by difference in temperature due to sunlight is mainly distributed in the components exposed to the sun. ( 3 ) the control methods brought forward such as setting the reasonable stripping time reducing cast temperature of concrete setting after - treatment joint inflicting prestress arranging steel for construction requirement and so on are effective and their application may be extended

    在使用期,由季節溫差作用引起的結構內力主要分佈在底層構件上;由內外溫差引起的內力主要分佈在建築物外圍構件上;由日照溫差引起內力主要分佈在向陽面的構件上; ( 3 )在施工階段,可採取使用導熱性能較好的板、合理設計拆模時間、降低澆築溫度等措施來減小水化熱引起的結構內力;採用設置后澆帶的措施來減小結構在整體降溫情況下產生的溫度內力。
  4. During the restricted hours in designated areas, the use of specified powered mechanical equipment for example, hand - held breakers and dump truck and or the carrying out of the prescribed construction activities for example, erection or dismantling of formwork and hammering is subject to more stringent control

    于限制內,在指定范圍使用指明機動設備例如手提破碎機及泥頭車及或進行指明建築工程例如搭建或殼或錘打均須受到更嚴格的管制。
  5. Short cycle times can be achieved by detaching the mold plates before the concrete is completely set up

    在混凝土完全硬化之前可以縮短周期
  6. If the system is not flushed until after the backflow valve is installed, remove both check modules from the valve and open the inlet shutoff to allow water to flow for a sufficient time to flush debris from the water line

    如果在安裝迴流閥之前系統還為沖洗,則從閥門上卸兩個止回閥塊,開啟進口關閉閥,讓水流過足夠長的來沖洗水管內的堆積物。
  7. The primary conclusions are drawn in this paper on these points : ( 1 ) after the blasting data of delayed time and height are gained based on the theory of gradually disintegration, the elements need to kill are executed similar with destroying the part of the building. then the pre - condition cg solver is pitched on to execute the nonlinear analysis

    本文的主要成果如下: ( 1 )根據逐段解體法爆破除設計的原理,計算秒延差和爆破高度,在已劃分網格的有限元型中殺死擬爆除的部分單元,使整體結構處于失穩狀態下,然後利用前置條件共軛梯度法求解器對結構進行材料和幾何非線性求解。
分享友人