拆線過程 的英文怎麼說

中文拼音 [chàixiànguòchéng]
拆線過程 英文
disconnect process
  • : 拆動詞[方言] (排泄大小便) excrete
  • : 名詞1 (用絲、棉、金屬等製成的細長的東西) thread; string; wire 2 [數學] (一個點任意移動所構成的...
  • : 過Ⅰ動詞[口語] (超越) go beyond the limit; undue; excessiveⅡ名詞(姓氏) a surname
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 拆線 : 1 [醫學] take out stitches; take out [remove] the suture2 (將電話線路斷開) clearing拆線寄存器 d...
  • 過程 : process; procedure; transversion; plication; course
  1. Path of uhpm consists of two curves, i. e., a barrette - like curve reflecting the process of cold slab subduction and exhumation cold overthrusting, and a crescent curve representing the thermal exhumation after slab breakoff

    軌跡由兩部分組成,即反映板片冷俯沖冷折返的發夾狀曲和指示板片斷離沉熱折返的新月形曲
  2. For the particularity of the freezing freight transportation, there are many problems existing in the less container load transportation process and there is very high demand to a serious of services in the freights " loading, transportation and removing - picking up the goods. but the upper respond will be gotten if the deal is proper. on the basis of my own experiences in 6 years and the discussion with the professions, the writer expound some problems which would be regarded in the freezing less container load execution and some measures which can settle current problems, and wish the agencies which want to operate the freezing container and less container load business between dalian and japan can get some assists

    由於冷藏貨物運輸的特殊性,在拼箱運輸中存在很多問題,對貨物的裝載、運輸、箱提貨一條龍的服務部有非常高的要求,但如果經營得當會有較高的回報,筆者在本文中結合實踐經驗和與同行的探討詳細闡述了冷藏拼箱的實施中應該注意的一些問題和解決目前存在問題的一些對策,希望能對經營大連-日本航冷藏集裝箱拼箱業務的貨代會有一些幫助。
  3. An algorithm to resolve the coupling effect problem is proposed during the cross point assignment ( cpa ) stage. in the algorithm, the priority queue concept and the rip - up and reroute strategy are combined to control crosstalk noise caused by interconnect coupling capacitance. first, the nets are arranged into different priority queues according to their weighted sum of their length and criticality. then, the cpa problem for one queue of nets is translated into a linear assignment problem. after the assignment of one queue of nets, a post - cpa checking routine is performed to check and rip up the net pairs which violate the crosstalk noise constraint and then push them into the next queue to be reassigned. the algorithm is tested by a set of bench mark examples, and the experimental results are promising

    提出了一種在點分配階段解決噪聲耦合效應問題的演算法.該演算法採用優先隊列同重布策略相結合的方法,控制由互連耦合電容引起的串擾噪聲.演算法中,首先按照長和約束限制,將網劃分到若干個優先隊列中.然後,將每個優先隊列的點分配問題轉換為性分配問題.在完成一個網隊列的分配后,通點分配后處理檢查串擾約束滿足情況,對違反約束的網對進行除,放入后續網隊列進行重新分配.實驗數據表明,該演算法能夠取得好的效果
  4. Abstract : an algorithm to resolve the coupling effect problem is proposed during the cross point assignment ( cpa ) stage. in the algorithm, the priority queue concept and the rip - up and reroute strategy are combined to control crosstalk noise caused by interconnect coupling capacitance. first, the nets are arranged into different priority queues according to their weighted sum of their length and criticality. then, the cpa problem for one queue of nets is translated into a linear assignment problem. after the assignment of one queue of nets, a post - cpa checking routine is performed to check and rip up the net pairs which violate the crosstalk noise constraint and then push them into the next queue to be reassigned. the algorithm is tested by a set of bench mark examples, and the experimental results are promising

    文摘:提出了一種在點分配階段解決噪聲耦合效應問題的演算法.該演算法採用優先隊列同重布策略相結合的方法,控制由互連耦合電容引起的串擾噪聲.演算法中,首先按照長和約束限制,將網劃分到若干個優先隊列中.然後,將每個優先隊列的點分配問題轉換為性分配問題.在完成一個網隊列的分配后,通點分配后處理檢查串擾約束滿足情況,對違反約束的網對進行除,放入后續網隊列進行重新分配.實驗數據表明,該演算法能夠取得好的效果
  5. The spokesman further explained that the whole bridge was relocated without dismantling the existing features and the shifting of the bridge across the existing railway line was the most difficult part of the operation

    發言人進一步解釋,遷移工序進行前並沒有卸橋體,而是將整座鐵路橋完整地跨現有鐵路移到下游位置,是整個遷移中最困難的工序。
  6. Aiming at main project of the xiaoxihu bridge, a low pylon cable - stayed bridge, based on the existing theory and method of the bridge construction controlling theory, using the basic function of " ansys ", farther exploitation was done on concrete elasticity and creep calculating distinguishingly, nonlinearity analysis theory was used to construct the space model, the main beam, string pylon and abutment were simulated by the beam elements which was considered the shearing effect. which is worthy of considering that using the geometric non - linear truss elements to simulate the stayed - cable, form traveler is modeled as structure elements and participate in stress analysis. four stages are used to model the construction stage, which are : ( 1 ) the erection of form traveler ; ( 2 ) placing the segmental concrete ; ( 3 ) jacking the tendons ; ( 4 ) tensioning the stay cables

    針對建設中的小西湖矮塔斜拉橋的主體工,結合已有的橋梁施工控制的理論和方法,利用大型通用計算軟體ansys的基本功能,並著重在混凝土彈性計算及徐變計算方面做了相應的二次開發,採用非性分析理論並建立了空間結構模型、用考慮剪切作用的梁單元模擬主梁、索塔和橋墩;用可考慮幾何非性的桁元模擬斜拉索、施工掛藍作為結構單元進行裝,參與受力計算,整個施工按施工循環周期分為若干階段,每個階段又分為四個工況,即:空掛藍就位、澆築完畢階段混凝土、張拉預應力鋼筋和張拉斜拉索。
  7. " alan will have another operation to remove the pin next week and then he can start the next stage on his recovery process, " confirmed queiroz

    「阿蘭下個星期將進行另一次手術進行,然後他將開始進入下一階段的恢復, 」奎羅斯確認道。
分享友人