拉結墻 的英文怎麼說

中文拼音 [jiē]
拉結墻 英文
tie wall
  • : 拉構詞成分。
  • : 結動詞(長出果實或種子) bear (fruit); form (seed)
  • : 名詞(磚、石等築成的屏障或外圍) wall
  1. The sentry box of the activity fully use internal wall panel and one s own intensity of the roof boarding, through draw nail, bolt, connection nailed to make up finalize the design the prefab system. construction swift, being portable, especially suitable for urban municipal administration, entrance guard room, service department, etc

    活動崗亭是通過充分利用夾芯板及屋面板的自身強度,通過釘螺栓自攻釘將鋼構底座面夾芯板和屋面板連接組成的房屋系統。
  2. The macao venetian, of about 2, 000, 000, 000 dollars, was invested by las vegas sands inc and located on golden light avenue, with a occupational area about 10, 500, 000 square meters, and the roof and metope are steel structures with sculpts

    澳門「威尼斯人」工程,是由美國斯維加斯金沙集團股份有限公司,投資二十億美元興建,該工程位於澳門路?金光大道,佔地面積一千零五十萬平方尺,其中頂部、面都採用鋼構材料表面加造型。
  3. The work done in this paper is mainly as follows : ( 1 ) the wide beam should intrude to the wall at some length to make the flexural stress uniform along beam section width, thus make full use of the beam ' s bearing capacity and avoid the shear failure in the concrete joint. and it also prevents stress focus and concrete crack in the local shear wall

    關于寬梁與薄肢節點,可以得出以下幾點初步論:寬梁應該深入肢一定的深度,以使寬梁截面的彎曲應力沿著梁截面寬度分佈均勻,充分發揮寬梁的抗彎能力,同時避免節點區混凝土的剪切失效,也避免剪力的局部因為受到的應力過大而裂。
  4. As a whole, the research work of this dissertation can be summarized follows : 1. in accordance with my design patent, namely, reinforced earth retaining wall of r c net, and based on the analysis of the work mechanism, failure pattern, bearing capacity and stability of the reinforced earth, a new concept is expounded, namely, the reinforced earth wall which is thought of as a compound structure increase not only c but also ~ in comparison with non - reinforced earth. some bearing capacity formula are first introduced under the circumstances that the reinforced earth wall fails because of the breakage of material or inadequate cohesion between reinforcements and soil

    歸納起來,具體的研究和所獲得的一些重要成果如下: 1 、合本人的設計專利? 「鋼筋混凝土網格式加筋擋」及工程實踐,在對加筋土的加筋機理、破壞模式、承載力和穩定性等方面進行深入分析的基礎上,提出了一個新概念,即經過加筋后的土體作為復合構與原土體相比,不僅提高了內聚力,而且也提高內摩擦角;並在此前提下首次導出力破壞和粘著破壞兩種情形下的承載力公式,然後進行了穩定性分析。
  5. Secondly, the static stress and strain characteristic of polymer - geogrid reinforced earth is summarized, the pulling stress distributing of the reinforced material in the earth walls, the interface characteristeric between the reinforced material and earth and the friction stress distributing between the reinforced material and earth are analysed

    然後,總了塑料土工格柵加筋土靜應力應變特性的一般理論,分析了塑料土工格柵筋材在擋中的應力分佈和塑料土工格柵與土的界面特性以及筋土間摩擦應力的分佈。
  6. Compared the results of fea and the data of experiment, we can analyse that the distributing of the seismic stress of polymer - geogrid reinforced material is similar to that of the static stress, but the stress values of them is different ; the seismic similar friction coefficient between the earth and reinforced material fall with the increasing of earthquake acceleration, model acceleration respond along the height of the model, etc. thirdly, according to the comparison and analysis of the model seismic fea results and model experiment data, we can find the polymer - geogrid reinforced earth seismic fea is reasonable, which is composed by earth element, contact element and reinforced material element

    通過對比有限元計算果和試驗數據,分析得出塑料土工格柵筋材的最大動應力的分佈與靜應力的分佈沿筋材的埋深大致相同,只是應力的值大小不同;地震作用下土筋間的動似摩擦系數是隨地震加速度的增加而減小;模型沿高方向的加速度響應等。接著,根據模型動力有限元時程分析果和模型試驗數據的比較分析,得出由土體單元、接觸單元和筋材單元組合的塑料土工格柵加筋土非線性動力有限元分析模式的合理性。
  7. Check the gear wheel drive in the groove of the wall, select four gear wheel ( red pinion is not used ) of different size for use, load heavy gear wheel, times of heavy gear wheel, times of light gear wheel, minimum gear wheel most onto separately from left to right, make gear wheel hand in, form each other, leave behind, operate a switch, drive, finish

    檢查壁凹槽中的齒輪驅動裝置,選用大小不同的四個齒輪(紅色的小齒輪不用) ,從左到右分別裝上最大的齒輪、次大的齒輪、次小的齒輪、最小的齒輪,並使齒輪間相互交閘,驅動完成。
  8. Design of point - supporting glass curtain wall of glass - guy rod structure

    桿組合構點式幕設計
  9. It gives a brief introduce on working theory, combination of proventing soil wall with sinew soil and on structure material, calculation of proveuting soil plank, tensil sinew, restuffing material

    文中對加筋土擋土的工作原理、組成以及擋土板、筋、回填料的構、材料與計算作了概括介紹。
  10. The mesoproterozoic mafic dyke swarms are extensively distributed in the central north china craton, which are not deformed and metamorphic, emplacing the pre - existed fractures, so the dyke swarms become the conspicuous marks to reconstruct the mesoproterozoic tectonic stress field of the central ncc. the mafic dykes in the northern block are transtensional while the dykes in the central and southern blocks are extensional. the mesoproterozoic tectonic stress field could be simulated on the analysis of the distribution and mechanical origin of the mesoproterozoic mafic dyke swarms in the central ncc. the simulation result shows that the mafic dyke swarms were formed in the extensional tectonic setting in the ncc in the mesoproterozoic time, which are related to the extension of the mesoproterozoic yanliao - zhongtiao aulacogens cross the central ncc

    通北部地塊的鎂鐵質巖群為張剪性,而中部和南部地塊為張性。根據華北克通中部中元古代鎂鐵質巖群的分佈和成因機制分析,來恢復模擬中元古代的構造應力場。數值模擬果表明鎂鐵質巖群在中元古代形成於伸展的大地構造背景,與橫穿華北克通中部的燕遼-中條拗槽系的伸展作用有一定的聯系。
  11. Standard methods of static load test for combined tensile and transverse load resistance of paneled wall systems in building construction

    房屋構造中隔系統耐伸與橫向合荷載用靜荷載試驗的標準方法
  12. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文合黃河小峽水電站泄洪閘預應力閘墩這一工程實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加錨索預張力,考慮了可能發生的多種荷載工況組合,並與無預應力閘墩構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩構的受力狀態,通過三維有限元分析,還得到了胸簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。
  13. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續是一種歷史較短的施工方法,目前,砼防滲的設計還是以傳統的設計方法為主,根據查找國內外文獻資料,華東建築設計院王衛東利用地下連續與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗果確定混凝土的參數,利用非線性e - b模型,合黃河小浪底土石壩設計剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲的應力、位移進行有限元分析,並與普通混凝土防滲計算果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和應力數值來判斷塑性混凝土防滲的安全程度。
  14. Column rebars and cushion block work, install the steel inserts and wall binding rebar

    綁扎柱筋,墊保護層墊塊,安放埋件、筋。
  15. The development of all lands of strains of the concrete is observed. it is found that, for the scc walls, the majority pre - built compressive stress is relaxed due to the creep. hence, the creep has a rigidity effect on the build - up of the tensile stress

    通過對混凝土各項變形隨時間發展的時程分析果表明,對補償收縮混凝土,徐變總體上起到消耗膨脹壓應力的作用,對應力積累具有剛化效應。
  16. Through analyzing the above calculation results, it is believed that the mania rockfill dam with clay core is highly capable of earthquake resistance

    通過對計算果進行分析認為滿土心堆石壩具有較強的抗震性能。
  17. Test methods for static load test for combined tensile and transverse load resistance of panel wall systems in building construction

    建築物構隔系統抗伸與橫向荷載組合的靜荷載試驗方法
  18. The flexible retaining structure is another important retaining structure in soft soil. the integrated numerical analysis of this retaining structure ( including the methods and theory of calculating active earth pressure under sorts of conditions as well as the calculating method of horizontal stiffness coefficient of bracing structure and the method of deciding boundary condition etc. ) was gived. the effect of all parameters on the characteristics of retaining structure was discussed using methods of sensitivity - analysis

    本文針對目前常用的彈性支點法,給出了完整的數值分析方法,包括各種條件下的後土壓力的計算方法和原理、支撐系統(或錨系統)水平剛度系數的計算、邊界條件的確定方法等,並以此為基礎採用靈敏度系數分析方法討論了各參數對圍護構形態的影響,指出土體側向基床比例系數是影響圍護構變形的最主要的參數。
  19. Through these studies and analysis, following conclusions could be drawn : ( 1 ) it is necessary to study on harness engineering of landslide and dangerous rock since the main representations of this geological hazard are landslide and dangerous rock through geological investigation ; ( 2 ) it can be concluded though stability analysis that the dingzhuang landslide is stable naturally, which is identical to the in - situ investigation ; ( 3 ) through stability analysis, the landslide would slide if the water level dropped down from 175. 10m to 156. 0m and it rained successively after the three gorges reservoir work. ( 4 ) according to the results of calculation and the characteristic of the landslide, it is suggested that such measures as unloading at upper part, anchorage and pile supporting system and drainage system should be used on the landslide. ( 5 ) according to geological investigation, there are three kinds of dangerous rock in the engineering, those are failing - down rock, collapsing rock and sliding rock

    因此有必要對滑坡進行治理; ( 4 )根據滑坡推力計算果和本滑坡屬牽引式滑坡的特點,滑坡體上部相對較穩定,中下部處于基本穩定或不穩定狀態,因此建議此滑坡治理採用上部削坡減載與錨抗滑樁、擋進行支擋合的處理方法,同時合截排水等措施進行綜合治理; ( 5 )根據地勘資料,通過對危巖體的形態、規模、基座和底界層及分佈特點和分析,將本工程危巖體失穩崩塌的方式歸納為墜落式、傾倒式和滑塌式三種類型並分別提出相應的穩定性計算方法; ( 6 )分別對本工程中的危巖體進行了穩定性計算,並且發現其都處于不穩定狀態,因此根據實際情況分別提出相應襯砌支撐和清理等加固治理措施,最後還對加固后的危巖體進行了校核計算,滿足要求。
  20. Double side of concrete panel can bear and deform coincidently because angle - steel frame and steel wire confined, it ensured durable character of sandwich wall, too, due to thick of wall increasing, wall ' s stable bearing strength was improved

    雙側的混凝土面層保證了體的耐久性;由於角鋼邊框和鋼絲對雙側混凝土面層的約束,保證了雙側板的協同變形和承載能力;保溫層增大了體厚度,提高了體的平面外穩定性。
分享友人