拱工頂 的英文怎麼說

中文拼音 [gǒnggōngdǐng]
拱工頂 英文
apex hog
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : i 名詞(人體或物體的最上部) crown; peak; top Ⅱ動詞1 (用頭支承) carry on the head 2 (從下面拱...
  1. How do you conceive your own death in all the marble vaults, the brick ridges, and the furnaces that lead to the market place ?

    看頭上有多少巍巍,燦燦瓦脊,地上有多少廠通著市場,此時此地,人對自己的死又是怎麼想的呢?
  2. Pass through mechanical model calculate, discover the vault and arch foot part in the tunnel secondary lining thickness is weakness part, so at the design and construction must strengthen these part

    通過力學模型計算,結構在腳與仰交接處以及部位為隧道二次襯砌混凝土結構的薄弱部位,設計和施時應著重加強。
  3. At the part vault and arch foot in the tunnel secondary lining thickness, the standard difference and variance parameter is large than others, so insure the part thickness achieve design require by adjust construction craftwork

    隧道二次襯砌厚度在腳的部位的標準差和變異系數較大,在施中應該考慮調整施藝,確保這兩個部位的厚度。
  4. 2 ) from the angle of constructing course, steeve - arch supporting structure requires low - capacity cranes to erect, and simple constructing methods easy to meet. the time spending on construction is short. the usual arch supporting structure requires high - capacity cranes to erect, and complicate constructing methods hard to meet

    2 )從施角度看,吊桿式架支承結構對吊車的起吊能力要求低,藝簡單,施方便,期短;豎桿式架支承結構起重量大,對吊車的起吊能力要求高,施難度大。
  5. It also has important reference value for the similar construction. by the safety and seismic evaluation of this aqueduct bridge, it has shown that ( 1 ) besides the structure of this aqueduct bridge was basically unharmed without some flake of concrete cover and revealing stirrup, its intensity basically reached the need of primary design. ( 2 ) from the side of carrying capacity, rib arch could satisfy the needs under the action of wind and earthquake, but some individual frame crossbeams and most rib arch tie beams could n ' t satisfy the need

    通過對東滑峪渡槽進行安全性能和抗震性能評估后表明: ( 1 )渡槽除肋面有保護層剝落、箍筋外露,結構基本完好,其強度基本達到西安理大學程碩士專業學位論文原設計的強度要求; ( 2 )從承載力方面看,在風荷載、地震作用下,肋基本滿足要求,個別排架橫梁不滿足要求,肋連系梁普遍不滿足要求;計入水平橫槽向地震作用的況為設計控制況。
  6. With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places

    摘要採用鐵路程抗震設計規范、動三軸試驗及有效應力的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當隧道底板坐落在5層且5層較厚時的液化區出現在隧道襯砌底板處;局部地段液化區出現在隧道部及腰;大部分地段的液化區出現在隧道板上方。
  7. Tensile stress field would appear in the proximity of arched vault after excavation, slacking of surrounding rock and subsequent dropping of blocks of rock from such area would possibly occur at any time in the context of extra - shallow depth. so i - steel arched support must be erected to provide against possible block dropping and be integrated into a ring with that of pilot tunnels on both sides

    在核心土開挖后,在一定范圍內出現拉應力區,在超淺埋情況下極容易掉塊和發生圍巖松馳,因此核心土必須邊開挖邊架設字鋼架,使之與左右導洞字鋼形成整體。
  8. Presented in this thesis is a model test of the arch ribs segment with concrete filled steel tube ( cfst ) of maocaojie bridge, which is located in the yiyang of the hunan province and provides the engineering base for the test

    本文以湖南省益陽茅草街大橋為程背景,進行了茅草街大橋主圈鋼管混凝土1 : 5節段模型試驗。
  9. Application of thin shell colour sheet metal in the super - span building engineering

    薄殼彩色金屬板在大跨度建築程屋上的應用
  10. During the construction of the concrete lining for the diversion tunnel of xiaowan hydropower station, the concrete linings for the sides and the crown of the tunnel are simultaneously placed by the integral steel shuttering trolley with the greatly shortened construction progress

    摘要小灣水電站程在導流洞混凝土襯砌施中,邊混凝土採用整體式鋼模臺車一次襯砌成形,大幅提高了施進度。
  11. On the basis of the practice on work of extra - insufficient control and the subsidence of vault and the earth ' s surface, cases of engineering surveying techniques applied in the construction supervision in tunnels are discussed

    摘要通過超欠挖控制、下沉、地表下沉的程實踐,討論在隧道施監控量測中程測量技術的應用情況。
  12. Tradition says that the custom began in 1490 when, after the completion of the great fan vault in the nave of the abbey church, abbot peter ramsam gave his masons a well - earned holiday, telling them to pack their tools and then go out and enjoy them selves

    傳說此俗開於1490年,修道教堂中殿的扇形大後,彼德?蘭山主持給匠們放了一天勞動換得的假,讓他們收起具,到外面痛快地玩玩。
  13. And the main contents of this dissertation are : ( 1 ) the engineering geological features of discontinuities in surrounding rock mass were analyzed on the basis of field geological survey and the preferred orientation of the main discontinuities were derived. then the displaceable blocks distributing on the roof and sidewalls of main chamber were searched out taking the intersecting relationship of discontinuities into consideration. then the failure mode and the coefficient of stability of the displaceable blocks were studied respectively

    主要內容包括:在野外地質調查基礎上,通過統計分析得到地下廠區結構面的優勢方位;對結構面程地質特性進行了分析;根據結構面的空間組合關系,搜索出可能在主廠房洞室的和邊墻部位出露的塊體,並分析了各塊體的可能滑移方式及其穩定性系數。
  14. The model scale is 1 / 5. the distribution of the stress at the top section of arch ribs in different load cases is obtained by simulating the construction procedure

    試驗模擬大橋的實際施過程,得到了在各種荷載況下節段鋼管混凝土肋的應力分佈。
  15. Thus, two 2d elastic finite - element models of tunnel are respectively established, both of which go through i wall - rock sector and wall - rock sector by means of large - scale finite element software ansys. thereby, the magnitude of wall stress, displacement, submergence of arch roof and terrestrial sedimentation in tunnels will be attained via numerical simulation of the whole construction process

    通過運用大型通用有限元軟體ansys ,分別建立隧道穿越類圍巖地段和類圍巖地段的兩個二維彈塑性有限元模型,進行施全過程的數值模擬,得到隧道中墻應力和位移以及下沉和地表沉降值。
  16. In this case, the employee was trying to use his cell phone ' s illuminated screen as a source of light as it was dark by the dome area on the top of the truck

    在後附短片中,由於卡車上方的區域光線很暗,員試圖打開手機亮光屏幕取光。
  17. " it was a tough thing to do, much more difficult than building a normal snow igloo, " marco fanti, 45, who used to race cars in desert rallies, told reuters as he stood beside the 1. 65 - metre - high, dome - shaped traditional inuit shelter made of some 330 dark chocolate bricks

    他站在這座高1 . 65米,用330塊黑巧克力磚建成的因紐特人傳統的形園小屋旁告訴路透社記者說: 「搭建巧克力屋是一項艱巨的程,遠比建造一座普通雪屋困難。 」
分享友人