拱應力 的英文怎麼說

中文拼音 [gǒngyīng]
拱應力 英文
arch thrust
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : 應動詞1 (回答) answer; respond to; echo 2 (滿足要求) comply with; grant 3 (順應; 適應) suit...
  • : Ⅰ名1 (力量; 能力) power; strength; ability; capacity 2 [物理學] (改變物體運動狀態的作用) forc...
  1. According to this, the temperature field stress field and autogeny body - expand - deformation field of yangchun arch dam during construction arid operation period are analyzed, thus many significant conclusions are got for reference

    由此,模擬分析了陽春壩施工期和運行期溫度場、自生體積膨脹變形場及場,得到了一些有參考意義的結論。
  2. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積端承q _ b的計算方法,並考慮擴底樁的「」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的人工挖孔擴底樁軸向承載計算公式。論文運用了marc程序對地基土的和位移進行了有限元數值計算分析,得到了地基土的和位移場的變化曲線和在加載過程中樁側土摩阻和樁端反各自所承擔的比例;本文還在總結各國挖孔擴底樁用情況的基礎上就擴底樁的構造進行了詳細的歸納。
  3. The cyclo - hoop effect which steel tubular has exert to the concrete shows the character of heterogeneous in the arch rib section, the same to the axial direction. the paper verifies the change of the material poisson ration and the concrete grade will make the cyclo - hoop effect obvious alteration, the change of the cyclo - hoop effect and the stress redistribution of the section produced by the shrinking and creeping of the concrete and the expensive concrete on the section

    在鋼管混凝土肋斷面上,鋼管對內填混凝土的環箍效具有非均勻性,在軸方向上環箍效也呈現非均勻性。驗證了材料的橫向變形系數、混凝土標號等參數的變化將引起環箍效的明顯改變;混凝土的收縮、徐變和膨脹混凝土的用導致鋼管混凝土的環箍效發生變化並使截面的發生重分佈;並總結了其變化的基本規律。
  4. For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem

    摘要對江坪河雙曲壩進行了三維彈塑性有限元分析,利用有限元成果分別計算了正常蓄水位、設計洪水位等3種工況下加固前後壩體壩肩系統的點安全系數和7個可能滑動塊體的抗滑富餘系數。
  5. To reducing the compressive stresses at the impost of arch, we optimized this part and obtained a good result so as to offer a scientific basis for design

    針對腳壓較大的情況,進行了局部加大的優化處理,取得了較好的效果,為工程設計提供了科學依據。
  6. The box beam ' s temperature stress of longitudinal direction and transverse direction with different conformation are analyzed, it finds that there is largish temperature tensile stress in the bottom of top deck and the haunch of box beam increase temperature tensile stress in the bottom of top deck. the paper makes a study of different thermal effects resulted from several kinds of closed rigid frame

    根據大量實測溫度場結果建議採用一個有利於理論推導的指數函數的公式來擬和箱梁體內的溫差分佈,既貼近實測數值,計算又比較簡單;通過對空腹式剛架橋尤溪洲大橋所在地夏季、秋季、冬季的溫度場及溫度的實測,以及與本文所提出計算方法的理論解進行的分析比較,證實了本文計算方法的正確,同時改進了已往混凝土箱梁溫度自的計算方法。
  7. The application of ansys in the loshse bridge anchorage local stress analysis

    軟體在提籃橋錨下局部分析中的
  8. Due to exceedingly flat arched vault of the flat tunnel with outsized span and renewed stress allocation in surrounding rock after excavation, which would inevitably induce some excessively large load on the base of arch, therefore, larger load - bearing capability in the is " foundation is a must. on the other hand, smooth face explosion must be applied to excavation of the arch base to further ensure the integrity and continuity of country rock around tunnel

    特大跨超淺埋隧道部結構過于扁平,開挖后發生二次分佈,腳處的過大,要求有較大的地基承載腳開挖時必須採用光面爆破,保證圍巖的完整性和不受擾動,開挖后及時封閉,防止該處積水軟化圍巖。
  9. Static and dynamic behavior of three - span continuous prestressed concrete rigid framed arch bridges without spandrel members

    三跨連續無腹桿預混凝土剛架橋的靜動特性
  10. This paper presents the structural design of the main bridge of lhasa river bridge, makes a deep - going study of the key techniques for design of the bridge, such as the reasonable span length ratio of each span of the 5 - span girder and arch hybrid structure, mechanical behaviour of the dual arch ribs, and section of the continuous girder tie beam, and also works out rigidity and stress conditions of the continuous girder tie beam and stress conditions of the concrete - filled steel tube arches of the main bridge

    摘要介紹了拉薩河特大橋主橋結構設計情況,對於五跨梁組合橋梁各孔跨合理的跨度比、疊的受行為及連續梁系桿截面形式等設計中的關鍵性問題進行了深入的研究,給出了主橋連續梁系桿的剛度和情況、鋼管混凝土情況。
  11. In this article, according to heat conduction theory, elastic creep theory and finite element theory, the temperature field and creep stress field in the arch dam during construction and operation are simulated and analyzed by means of three dimensional finite element relocating mesh method, and the distribution law of the temperature field and creep stress field in the arch dam during construction and operation are systematically studied, and according to the construction process of concrete arch dam, the effect of lamination placement, construction interval, elastic modulus change, thermal insulation change, surrounding temperature change, concrete creep and autogenous volume change on thermal stress in the arch dam are also considered

    論文根據熱傳導理論、彈性徐變理論及有限元理論,用三維有限元浮動網格法對壩施工期和運行期溫度場、徐變場進行了全過程模擬分析,較為系統的研究了混凝土壩施工期和運行期溫度場、徐變場的分佈規律,在分析中按照混凝土壩施工過程,考慮了混凝土分層澆築、施工間隙時間、彈模變化、絕熱溫升過程、環境溫度的變化、混凝土徐變、自生體積變形等因素對壩體溫度的影響。
  12. Analyses the stress distributing of bulk solid around the silo outlet, points out the reason of arc forming and the method of breaking arc

    對存倉排料口附近物料顆粒的分佈情況進行了研究,分析其成的原因,並提出防止成及破除料的方法。
  13. This paper focuses on the research of the stress mechanism of the ribbed shell structure in statics, dynamics and under the explosive load on the basis of the engineering practice of cave depot of single aircraft. in this paper, according to the classical shell theories, the basic differential equilibrium of the ribbed shell structure and the finite element analysis of 3d rippled plate are established, in which the function of annular ribs reinforcement bars and 3d ripped steel plates are distributed in the range of the steel, and the functions along the longitude direction of tension, bending, and torsion are neglected ; applied with dynamic analytical theory, the dynamic model of ribbed shell structure and the analytical theory model of elastic - plastic are set up ; the triangle series method is used to solve the displacement and stress under the distributed load and the concentrated load of the ribbed shell structure

    本文以軍用機場地面單機掩蔽庫工程建設為工程背景,首次對內襯三維波紋鋼板混凝土型復合結構的受機理進行了靜、動和爆炸荷載的分析研究。根據將橫肋、鋼筋及三維波紋鋼板的作用均勻分佈在殼體范圍內的情況,忽略橫肋、鋼筋及三維波紋鋼板沿殼體母線方向的抗拉、抗彎及其抗扭作用,首次推導出了內襯三維波紋鋼板混凝土殼體的微分平衡方程,建立了有限元計算模型,並採用三角函數法,求解了三維波紋鋼板混凝土型復合結構在分佈荷載和集中荷載作用下的位移響,並與普通殼體進行了比較。
  14. The research fruits in this article can provide the temperature isoline map of crown cantilever section and central longitudinal section of the dam, the stress isoline map of crown cantilever section and upstream and downstream surfaces of the dam, the maximal and minimal stress distribution map in dam abutment along with the height of dam, the maximal and minimal stress table of typical nodes and the maximal and minimal stress table in different elevations, and also provide reference basis for taking relative temperature control measures in the design and construction of rcc arch dam

    本文研究成果可給出壩體的冠梁剖面和壩體中心縱剖面的溫度等值線圖、冠梁剖面和壩體上下游面等值線圖、壩肩最大最小沿壩高的分佈曲線、不同高程處典型點的最大最小值表以及不同高程處最大最小值表等成果,為碾壓混凝土壩的設計和施工中採取相的溫控措施提供了參考依據。
  15. With an analysis of soil liquefaction potential for free field of nanjing metro line 1 under 7 degree earthquake, as well as for excavated field, in line with railway engineering anti - earthquake design specification, dynamic triaxial tests and theoretical analysis using efficient stress method, the author comes to the conclusion that, when metro plate is located at layer s and the layer is thick, liquefied area is at metro bottom plate ; in some local section liquefied area is at metro top plate, or arch sides at the top of metro in most places

    摘要採用鐵路工程抗震設計規范、動三軸試驗及有效的理論分析相結合的方法,對南京地鐵南北線( 1號線)區間隧道開挖后其地基土在7度地震情況下的土層液化情況進行分析得出:當隧道底板坐落在5層且5層較厚時的液化區出現在隧道襯砌底板處;局部地段液化區出現在隧道頂部及腰;大部分地段的液化區出現在隧道頂板上方。
  16. In the former, two computing modes of fem are built, aimed at the coupling of variable - profile pylon, curved - axis arch and flexible cable. the software algor feas is used to get the results of dynamic numerical analysis, such as natural vibration frequency, vibration mode, dynamic displacement, dynamic stress, which are compared with the results of shaking table test research to draw to important conclusions. these conclusions provide not only potent basis for the design and construction of nanjing century tower, but also reference for other pylon - cable - arch structures similar to the project

    在動態數值分析中,針對世紀塔變截面的塔身,曲線軸線的以及柔性拉索相互耦合時清況,建立兩種有限元計算模式,利用有限元軟體algorfeas得到動數值分析的結果,如:自振頻率、振型、動位移、動等等,再和振動臺試驗研究成果作比較,得到一些重要的結論,從而為南京世紀塔工程的設計和施工提供強有的依據,而且為類以於世紀塔工程的其它塔-索-結構的設計也提供一定的參考。
  17. The influence of the stiffness of the gravity abutment on the stress of the arch dam is also analyzed

    討論了重墩的剛度對壩壩體的影響。
  18. Combined with the real example of monitoring pressure on the supporting system in the long span underground space of dk7 + 692 section at jiao - xin line of chongqing light railway, it is set forth the methods about choosing the support system and its parameter, digging methods of underground space, measuring and testing methods for the stress of the support system ; the testing results and variation pattern were analyzed for the stress of the initial supporting i - steel axial stress of bolt, stress of shot - concrete, supporting pressure of temporary i - steel and stress of steel of the second lining, then, the reason for deformation of the support system induced by sharp increase of i - steel was determined

    摘要結合重慶市輕軌較新線大坪車站大跨度地下空間dk7 + 692斷面施工支護體監測的工程實例,闡述了該大跨度地下空間支護結構的參數選擇、地下空間的開挖方法、支護體結構的量測方法及測試手段;分析了支護體初期支護工字鋼拱應力、錨桿軸、噴射混凝土內、臨時工字鋼支撐、二次襯砌鋼筋等測試結果和變化規律;確定了工字鋼拱應力急劇增大而可能引起支護體系失穩的原因。
  19. Similar physical simulative study in state of pressure equilibrium and arch stress

    平衡拱應力狀態相似物理模擬研究
  20. The plane - wave analytic solution of the coupled fluid - air - solid system and the fem model of air cushion isolations are applied to study the influence of air cushion on earthquake response of dams. the calculations show that air isolation will reduce the hydrodynamic pressure significantly and restrain the dam vibrations during earthquakes. if the dam and reservoir is isolated by air cushions, it will decrease the hydrodynamic pressures by more than 90 % and the seismic stresses by 20 - 30 %

    將本文首次提出的水體-氣體-結構系統的平面波作用理論解和三維有限元模型,用於溪洛渡雙曲壩的抗震安全性和氣幕隔震可行性研究中,表明氣幕對高壩具有良好的隔震性能,可降低動水壓90以上,壩體地震拱應力20 30 ,減震效果顯著,並使壩體的抗拉安全系數從0 . 93提高到3 . 58 。
分享友人