拱洞 的英文怎麼說

中文拼音 [gǒngdòng]
拱洞 英文
arch cave
  • : Ⅰ動詞1 (兩手相合 臂的前部上舉) cup one hand in the other before the chest 2 (環繞) encircle; ...
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  1. Brings forward the basic network cell model of symmetrical blast vault and asymmetric blast vault. then studies and analyses airflow in vault of main voltage switchyard hall of xiluodu hydropower station which is far cry and large numbers of airflow conflux, brings forward concept of “ virtual embranchment ” and corresponding basic network cell model, regresses calculate expressions of flux uniformity coefficient and impedance of “ virtual embranchment ” of vault of main voltage switchyard hall of xiluodu hydropower station

    而後又採用cfd數值模擬的方法對溪洛渡水電站主變排風頂這種多股氣流匯流的長距離通道內的氣流流動進行了分析,提出了「虛擬分支」的概念和相應的網路基元模型,並回歸得到了溪洛渡水電站主變排風頂各個排風「虛擬分支」風量均勻系數以及阻抗的計算公式。
  2. He advanced several paces towards the point whence the light came, and to all the excitement of his dream succeeded the calmness of reality. he found that he was in a grotto, went towards the opening, and through a kind of fanlight saw a blue sea and an azure sky. the air and water were shining in the beams of the morning sun ; on the shore the sailors were sitting, chatting and laughing ; and at ten yards from them the boat was at anchor, undulating gracefully on the water

    他向光線透進來的那個地方走前幾步,在夢的興奮激動過后,跟著就來了現實的寧靜,發覺自己是在一個巖里,他向口走去,透過一座形的門廊,他看到一片蔚藍色的海和一片淡青色的天空,空氣和海水在清晨的陽光里閃閃發光,水手們坐在海灘上,在那兒嘰哩咕嚕地談笑著,離他們十碼遠的地方,靜靜的停著那艘小船。
  3. Finally we set up three - dimensional space model to simulate the space effect during tunnel construction, analyze the transaction between the left runnel and the right tunnel, and also analyze the deformation and stability of mid - partition

    最後建立了三維空間模型,對連隧道開挖時的空間效應、左右的相互影響,以及中隔墻的變形和穩定性進行了模擬分析。
  4. Evaluation of the effect of collapse in top area of a double - arched tunnel on its the secondary lining

    雙連隧道頂坍方對二次襯砌穩定影響評價
  5. Standard practice for structural design of corrugated aluminum pipe, pipe - arches, and arches for culverts, storm sewers, and other buried conduits

    排水和其它地下管道用波紋鋁管管結構設計的標準實施規程
  6. Tensile stress field would appear in the proximity of arched vault after excavation, slacking of surrounding rock and subsequent dropping of blocks of rock from such area would possibly occur at any time in the context of extra - shallow depth. so i - steel arched support must be erected to provide against possible block dropping and be integrated into a ring with that of pilot tunnels on both sides

    頂在核心土開挖后,在一定范圍內出現拉應力區,在超淺埋情況下極容易掉塊和發生圍巖松馳,因此核心土必須邊開挖邊架設工字鋼架,使之與左右導頂工字鋼形成整體。
  7. Reliability assessment of xi - luo - du underground water - power plant : the results have been used by the cheng - du surveying, design and research institute for the preliminary design ; ( 2 ) the stress and strain analysis for the xiao - guan - zi sluice and its foundation : the report has been applied for the reinforcement of the foundation ; ( 3 ) the thermal control procedure for the no. 7 - 14 power plant dam segments of the three gorge project : the research report provides the effective and efficient methods for the controlling of the temperature field in the mass concrete structure ; ( 4 ) the software system development for the long - term monitoring for dikes : the software can automatically give the results of the seepage field and the probability of soil piping of dikes and underground ; ( 5 ) reliability assessment of xiang - jia - ba underground water - power plant : the results have been used by the zhong - nan surveying, design and research institute for the preliminary design ; ( 6 ) fatigue reliability estimation of shipping berthing pillar : the results give the optimized design scheme and prediction of the structural age ; ( 7 ) 3 - d static and dynamic stochastic finite element analysis for the strength, stability and thermal control problem for xi - luo - du project

    溪洛渡水電站超大型地下室群圍巖穩定的安全可靠性分析:被成都勘測設計研究院應用於比選報告及可行性論證中; ( 2 )小關子水電站攔河閘壩及地基的應力應變分析:被成都勘測設計研究院應用於地基加固處理方案; ( 3 )三峽廠房7 # - 14 #壩段溫控並縫措施研究:為廠房壩段並縫方案的可行性提供了依據; ( 4 )堤防工程體系的長期監控預報預警決策系統開發:為監控、預測預報堤防滲漏管涌破壞提供分析軟體; ( 5 )向家壩地下室群圍巖穩定的安全可靠性分析:被中南勘測設計研究院應用於初步設計方案中; ( 6 )靠船墩的疲勞可靠度研究:為廣東航運規劃設計院的靠船墩優化設計和加固提供依據; ( 7 )溪洛渡高壩壩體壩基(壩肩)強度和穩定的三維靜動力隨機有限元分析及可靠度計算:為溪洛渡重大工程壩體的靜動力安全穩定性及溫控方案提供依據。
  8. It was of stone arches, splendidly solid, and graceful as they were strong.

    這是一座用石頭建成的橋梁,橋都呈形,非常結實,既雅緻又堅固。
  9. How to choose proper modes is an boring issue. two kinds of large span roofs, one is rectangle plane - roof, another is dome - like roof, were investigated with wind tunnel

    本論文分別以矩形平頂屋蓋和圓形屋蓋這兩種常見的屋蓋結構形式為研究對象,進行了比較細致的風實驗研究。
  10. All the results can be utilized by engineers, during the designing and construction. the main conclusions are listed as follows : ( 1 ) based on the shortest line between weak interbed and limit of excavation and the location of point of intersection between limit of excavation, classification of weak interbed distribution is set up, and the distance of distribution is defined ; ( 2 ) according to the strength and deformation equivalent principle, influence zone of weak interbed is introduced, and a new method to simulating the weak interbed with thickness is built ; ( 3 ) some quantificational results on influence of weak interbed respectively at crown, right shoulder and right wall are summarized ; ( 4 ) some quantificational results on influence of weak interbed with the distance between weak interbed and limit of excavation 0. 2d, 0. 5d, l. od are gained ; ( 5 ) some quantificational results on influence of weak interbed in the rock mass with confining coefficient 0. 38, 1. 0, 1. 5, 2. 0, 3. 0 are summed up ; ( 6 ) some quantificational results are summarized on influence of the underground surrounding rock mass stability with weak interbed, in the representational surrounding rock mass graded ii, iii, iv ; ( 7 ) according to the studying results some advices are suggested on designing of underground engineering

    主要結論如下: ( 1 )以軟弱夾層到開挖輪廓線最短距離和最短距離線與開挖輪廓線的交點位置為指標對軟弱夾層的分佈部進行了分類,並確定了軟弱夾層分佈距離; ( 2 )根據強度等效和變形等效的原則,引入了軟弱夾層影響帶的概念,建立了模擬軟弱夾層厚度的一種新方法; ( 3 )總結出了軟弱夾層分佈在頂、右肩、右邊墻時對地下室穩定性影響的量化指標; ( 4 )分析出了軟弱夾層距開挖輪廓線0 . 2d 、 0 . 5d 、 1 . 0d三種情況對地下室穩定性影響的量化指標; ( 5 )總結出了在不同的側壓力系數( 0 . 38 、 1 . 0 、 1 . 5 、 2 . 0 、 3 . 0 )地應力場中軟弱夾層對穩定性影響的量化指標; ( 6 )得出了在、 、代表性圍巖中軟弱夾層對穩定性影響量化結果; ( 7 )根據數值試驗成果提出了在有軟弱夾層圍巖中地下室設計原則的幾點新內容。
  11. With the increase of lateral pressure modulus, the magnitude of principal stress decreases and the direction of it is hardly changeable ; with the increase of the angle between the direction of the maximal horizontal principal stress on magnitude and the fault bearing, the magnitude of principal stress increase and its direction can hardly change ; with the increase of the elastic modulus of rocks, the magnitude of principal stress increases and the direction changes more ; with the increase of pr, the magnitude of principal stress decreases and the direction changes more ; with the increase of lateral pressure modulus, the principal stress at hance, the tress at topmost arch, bottom arch and principal stress at lateral arch decreases, with the increase of the depth of tunnel, the stress of surrounding rock also increases, and the poorer the quality of surrounding rock is, the little its principle stress is

    分析得出,隨著側壓力系數的增大,主應力量值減小,主應力方位難改變;隨著與斷層走向的夾角增大,主應力量值增大,應力方向難改變:隨著巖石的彈性模量的增大,主應力量值增大,方向變化越大;隨著泊松比的增大,主應力量值減小,方位變化越大。隨著側壓力系數的增大,頂、底處的各應力值增大,腰處的主應力減小,剪應力增大,側處的各主應力減小,同一側壓力系數的條件下圍巖質量越差,各應力值也越小;隨著室埋深的增加,圍巖壓力也增大,圍巖質量越差,其應力值也減小。
  12. The ceiling of the cave represents the vault of the sky

    穴的頂表示天空的穹隆。
  13. The influence radius of tunnel excavation on crown vertical displacement is equal to tunnel radius and the influence radius on horizontal convergence displacement is 1. 5 times of tunnel radius

    同時,測點距掌子面1倍徑和1 . 5倍徑時,頂下沉位移及水平收斂位移分別趨于穩定。
  14. The jiangkou hydropower station adopt double curve dam and underground powerhouse. major structures for the underground powerhouse were built under the ground, the whole cavern mass are quite complicate

    該水電站採用雙曲壩、地下廠房設計方案,廠房埋深約120m ,水電站的主要建築物均修建於地下,整個地下室群錯綜復雜。
  15. They approached the door ; which was of an arched form, and flanked on each side by a narrow tower or projection of the edifice, in both of which were lattice - windows, with wooden shutters to close over them at need

    她們走近了大門那建築物有一座形門,兩側各有一座細高的塔樓或者說是突出的前臉,上面鑲著格子窗,裏面還有木製的百葉窗,必要時可以關上。
  16. The bridge has three arches

    這座橋有三座拱洞
  17. This paper has completed the essence part of the robot, and laid foundation for the implement of the earthworm - like robot

    本文給出的機器人的本體部分,為仿蚯蚓拱洞機器人的實用化奠定了基礎。
  18. Clare turned at hearing her footsteps, but his recognition of her presence seemed to make no difference in him, and he went on over the five yawning arches of the great bridge in front of the house

    克萊爾聽見了她的腳步聲,轉過身來,不過他雖然認出是她來了,但是卻似乎沒有改變態度,又繼續往前走,走過屋前那座有五個拱洞的大橋。
  19. According to the biology mechanism and worm principle of earthworm, this paper lead robot technique into no dig technology on the earth, research and design the machine system mechanism of an earthworm - like robot which cove hole under the earth

    本文基於蚯蚓的生物機理,通過對其蠕動原理的研究,提出了在土質環境下拱洞的仿蚯蚓機器人機構模型,將機器人技術引入到了陸上不開挖技術中。
  20. In this thesis, some work has been done : fisrtly, based on the thorough investigation of the mechanism project, combining concept diagram, the literal description and the formula analysis together for programing motion of the robot ; secondly, according to soil mechanics principle and pressuremeter theories, the model which reflect the interaction force between robot and soil are founded ; thirdly, proceed the analysis and solution ; using virtual prototyping software - adams to optimize the mechanism model and analyze the mechanics ; furthermore compared the analysis calculation result of the above both side, we verify the possibility that the robot dig hole and move in soil ; finally, construction model is consummated based on the optimized result, the mechanism motion and the simulation animation of whole harmonious motion is fulfilled by three dimension simulation software - 3dmax

    論文的主要工作有:首先,在對機構方案進行了深入研究的基礎上,以概念圖標表示、文字描述和公式分析相結合的研究方法對機器人進行了運動規劃;其次,根據土力學原理和旁壓理論建立了機器人在土質環境下的受力模型並進行了分析求解;然後,藉助于虛擬樣機軟體adams對機構模型進行優化和力學分析;除此之外,通過對上述兩方面分析計算結果的比較,驗證了該機器人在土質環境下拱洞和蠕動爬行的可行性;最後,在優化結果基礎上進一步完善了結構模型,通過三維模擬軟體3dmax實現了機構運動和整體協調運動動畫的模擬。
分享友人