  1. Abstract : through study on energy dissipation of goupitang project on the wu - jiang river, the velocity field in the water cushion pool downstream ski - jump or drop was measured by hot - film anemometers on a fine model with scale 1 380

    文摘:結合烏江構皮灘利樞紐工程消能問題研究,用熱膜流速儀在比尺為1 380的精細模型上量測了拱跌流在墊塘內的流速場,並由試驗成果分析了淹沒射流在墊塘內的消能過程,計算了消能率。
  2. For a single plunging jet, two optimization models are respectively introduced according to the jet trajectory distance and the depth of scour pool, and the optimal computation of the jet trajectory distance in xiao - wan project demonstrates that these models are reasonable ; 5

    對于單股流消能舌,以距和沖坑深度為控制目標,分別首次建立了優化數學模型,並通過對小灣拱單孔舌的計算,說明所提出的數學優化模型是可用的; 5
  3. For two up and down plunging jets, an optimization model is introduced according to maximum energy dissipation. in this model, the exit angle of jet is first considered actually. the optimal computation of the energy dissipation between two impinging jets in xiao - wan project demonstrates that this model is reasonable too ; 6

    對于上、下雙股舌,以碰撞消能率為優化目標,首次考慮了出口舌的坦化影響因素,建立了優化數學模型,並通過對小灣拱身表、中孔舌的碰撞計算,認為所提出的數學優化模型是可用的; 6
  4. Spur dike shore protection project is designed for protection of the roadbed damaged by flood on qingxi reach of dongjiang river, the effect of which is calculated and analyzed by 2 - d mathematical model, to confirm the stream - deflecting and shore - protecting effect, and determine whether the spur dike exerts any influence on navigation

    摘要對東江清溪河段毀路基河段的保護進行了丁護岸工程設計,並採用二維數學模型對其效果進行了計算和分析,以確定工程設計方案的流和護岸效果,以及是否對通航造成影響。