挖地道 的英文怎麼說

中文拼音 [dedào]
挖地道 英文
gallery
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  1. These two sharp wits never met in former times but a perfect war of raillery was kept up between them.

    過去這兩個機靈嘴快的人每一次見面都要展開一場彼此苦譏笑的的舌戰。
  2. To dig a hole or tunnel for habitation or refuge

    為居住或躲藏而洞或
  3. Analysis of ground deformation for shallow tunnel in shenzhen city

    深圳鐵淺埋暗層變形分析
  4. Shallow depth excavation method and ground settlement control

    鐵淺埋暗層沉降因素及控制對策
  5. Analysis of large deformation regularity in stratum above metro tunnel

    鐵暗上覆層大變形規律分析
  6. Analysis on ground surface deformation induced by undercutting under shallow overburden in tianjin metro

    天津鐵淺埋暗表變形分析
  7. Construction technique for the shallowly buried and darkly excavated tunnel on the cobble water - rich stratum

    砂卵石富水層淺埋暗施工技術
  8. Analysis and control of stratum settlement of shallow - buried concealed tunnel excavation works of urban subways

    城市鐵淺埋暗層沉降分析與控制
  9. The kid dug a tunnel in the sand

    小孩們在沙堆里了一個
  10. It would be most an hour yet till breakfast, so we left and struck down into the woods ; because tom said we got to have some light to see how to dig by, and a lantern makes too much, and might get us into trouble ; what we must have was a lot of them rotten chunks that s called fox - fire, and just makes a soft kind of a glow when you lay them in a dark place

    這時離吃早飯還有個把鐘頭,我們就離開了那裡,到了林子里去。因為湯姆說,挖地道時最好能有點兒光亮,能看得見,而燈呢,又太亮,怕給我們惹出亂子。我們最好能找到一些爛木頭,人們稱做「狐火」的,放在黑洞洞的方,能發出幽幽的光。
  11. Since the shallow depth excavation is the main factor to cause ground settlement in shenzhen subway tunnel, this paper discusses some corresponding countermeasures including the improvement of ground property, appropriate draining of groundwater, scheduled excavation depth and width, etc, to control strata distortion and surface settlement, and argues that these measures are expected to effectively control surface settlement while constructing city subway in soft ground excavation

    摘要針對深圳鐵淺埋暗施工中影響表下降及層變形的因素,提出了遵循「十八字」原則、改善土體特性、適度排放下水、根據層條件選擇施工方法、增大左右線隧面的距離、合理確定開進尺、提高施工效率、加強初期支護、及時施作二次襯砌等對策。
  12. 3. 3 in particular, the potential hydrological problems caused by tunnel boring operation and portals construction may impose significant impacts on the underground hydrology of long valley

    3 . 3鉆及興建隧口仍可能對?原下水水文造成損害。
  13. They tunneled along under the walls and up into the woods beyond.

    他們在圍墻下面挖地道通向遠處林中。
  14. " to dig the foundations out from under that cabin with ?

    「用來在小屋基下面挖地道? 」
  15. The rescuers tunnelled their way ( in ) to the pot - holers

    救援人員挖地道通向那些探察洞穴的人
  16. The prisoners had escaped by tunnelling

    犯人挖地道逃跑了
  17. They tunnelled along under the walls and up into the woods beyond

    他們在圍墻下面挖地道通向遠處林中
  18. " why, to dig with

    「怎麼啦?挖地道啊。
  19. They always dig out with a case - knife - and not through dirt, mind you ; generly it s through solid rock

    人家都是用小刀挖地道逃出來的你可要注意的可不是土,而總是堅硬的石頭。
  20. " huck finn, did you ever hear of a prisoner having picks and shovels, and all the modern conveniences in his wardrobe to dig himself out with

    他說: 「哈克芬,你難聽說過有一個囚犯用鐵銑和鎬頭,以及衣櫃里的所有現代工具,用來挖地道逃出來的么?
分享友人