挖填設計 的英文怎麼說

中文拼音 [tiánshè]
挖填設計 英文
cut and fill design
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : 動詞1. (墊平或塞滿) fill; stuff 2. (補足; 充滿) replenish; supplement; complement 3. (填寫) fill in; write
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  • 設計 : devise; project; plan; design; excogitation; layout; layout work; styling
  1. Cut - and - fill design

    挖填設計
  2. Because of that, engineers need to create the profiles piece by piece, and also, the data within profile drawings, such as cut - and - fill, engineers have to do it manually

    此外,縱斷面圖的各項數據資料,如:現地高程、高程、方、方…等資料,也必須一項一項的手動完成。
  3. After the users input control tasks in three modes : natural language, electric sheet or flow char, the computer will receive the information of control demands by data mining and knowledge discovery. and then illation is leaded to select the hardware and program the software in the inner of the computer. afterward, control program is transformed in the file format of exiting simulation software by using the simulation interface and is opened in the simulation software

    用戶只需在pc機上以自然語言或繪制控制流程圖、寫表格的方式輸入控制任務,然後在系統內部經過數據掘和知識發現分析得到可用控制要求信息,並自動引導推理求解過程進行硬體選型和生成相應的控製程序,最後利用模擬介面,自動將控製程序轉化為現有的控制模擬軟體的文件格式,並在控制模擬軟體中,從而用戶可以對生成的控制系統進行模擬,檢查的正確性。
  4. Cut and fill design

    挖填設計
  5. In this paper, in order to solve the difficulties in the rain pipe construction in jianyu road of yulin city, the pipe - pushing technique for the hand - type tool pipe in the sand soil layer has been researched by experiments in which many practice problems were considered such as the movement and deformation of sand soil, the difficulties for the pipe to enter the scheduled work soil, the collapse of excavation surface, the departure of pipe center and the difficulties to correct this departure. by both the calculations for the stabilities of back - supporting soil body and excavation surface and the theoretical analysis on the reasons for the departure ' s producing, some construction techniques were introduced and adopted in this paper which include not only the change and reinforcement to both the back - supporting soil body and the scheduled work soil body but also the settings of pipe cap, lattice and correcting system on the head of the tool pipe

    本文針對榆林市建榆路雨水管道中遇到的技術難題,進行手掘式工具管砂土層頂管法施工技術試驗研究,在研究中考慮砂土層存在的后靠土體移位、變形,工具管難以進入出洞土體,掘面易坍塌、管道中心易偏差及難糾偏等問題,通過對后靠土體和掘面的穩定算及偏差產生原因的理論分析,提出並採用后靠土體換加固,出洞土體換加固,以及在工具管頭部置管帽、格柵、糾偏系統等技術措施
  6. Particularly four following respect problems of main research of this thesis : first, excavating and optimizing of the road bed and the slope protect, on the basis of influence factor analysis and the slope design principle by the expressway of mountain area of limestone, we excavate the model of optimizing after putting forward the road bed which is suitable for the expressway of mountain area of limestone, through employ this optimize model, we can reduce the amount of road bed excavate, thus maximum reducing slope excavate destruction to environment and pollute ; according to limestone mountain area expressway characteristic of the cutting slope, we use the law of finite element and rmr of revision carry on stability analyze and appraise to their side slope ; combine the limestone rock body characteristic of mountain area, we have analyzed the corresponding side slope safeguard procedures

    論文主要研究了以下四方面問題:第一,路基開優化。在分析石灰巖山區環境特徵的基礎上,探討了石灰巖山區路線的原則與方法;在應用有限元數值分析方法對邊坡的開穩定性進行分析的基礎上,提出了陡開強支護的石灰巖山區高速公路的路基開方式,並建立了平衡,開面積最小的石灰巖山區高速公路的路基開量優化模型;結合石灰巖山區巖體特性,探討分析了相應的邊坡防護措施。第二,土石方處理及自然水系調治恢復。
分享友人