挖深洞 的英文怎麼說

中文拼音 [shēndòng]
挖深洞 英文
bore through/into
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  1. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)埋長隧的設計和施工中面臨的一些問題,選取隧的一個典型斷面進行滲流、滲控分析和開及支護的有限元數值模擬,從而就埋隧不同的開及支護方式對地下水滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。
  2. Data mining which is a full - scale intellectualized solution, makes enterprises apperceive the thing hypostases deeply, provides support for decision - making, and affords the customer intelligence service of deep levels more effective market activities, wins the higher income for enterprise

    數據掘是一個全面的智能化解決方案,使企業察事務的本質,並為決策提供支持,提供層次的客戶智能服務、更有效的市場活動,為企業贏得更高收入。
  3. In the process of construction, some special geological hazards will be met because of the great depth and long distance, such as high external waterpressure, watergushing, high geostress, rockburst, high geotemperature and nocuous gas and so on. these geological hazards become the main restricted factors of tunnel construction

    大埋將使隧施工時遭遇到如高外水壓及高壓涌水、高地應力及巖爆、高地溫、高瓦斯有害氣體等一系列地質災害問題,這成為制約埋隧建設快速發展的主要因素。
  4. The key technique of this project is the design and construction of four deep - lying long runnels. their length, diameter and maximum bury - depth are 18 km, llm, 2500 m

    這一工程的關鍵技術是四條長達18公里、開徑11米、最大埋2500米左右埋長隧的設計和施工。
  5. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡水電工程大跨度、高邊墻復雜地下廠房室群,施工開過程中和開后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大量基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本計算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房室群開全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質量、初始地應力場、施工開順序對大型地下室群圍巖穩定性的影響。
  6. Associated with a project of the planned xuefengshan tunnel with 7. 6 km long during the construction of shaoyang to huaihua expressway in hunan province of shanghai to ruili national trunk highway, this paper firstly makes an introduction of the frequently - used analysis & computation methods for tunnel supporting structure. then, based on the analysis of the basic theory about the interaction mechanism of surrounding rock and support structure, a spatial computation model is made, a coupling numerical computation method with 3 - d elastic - plastic finite element and infinite element is proposed, and a comprehensive analysis has been made to the effects of the overall stability and safety of the surrounding rocks of different characteristics, different classes and under different construction methods. and thus the problem of 3 - d infinite region to which applying the general finite ca n ' t do has been resolved

    6公里的雪峰山隧道工程,首先介紹了隧道支護結構的常用分析計算方法;然後通過對隧道施工過程中,室穩定性與支護結構相互作用機理的入分析,建立了隧道施工過程的空間計算模型,提出了採用三維彈塑性有限元-無限元耦合的數值計算方法,綜合分析了隧道在不同圍巖特性和圍巖類別條件下,以及不同施工開方案等對隧道圍巖整體穩定和安全性的影響,從而解決了通用有限元方法難以解決的隧道三維無限域問題;其可充分發揮有限元法在分析非線性方面的有效性和成熟性,以及無限元法在分析處理無限域和半無限域方面的精確性和簡便性,為隧道施工過程中圍巖的穩定性分析開辟了一條新的途徑。
  7. In the simulation and analysis on culvert construction, the method of foundation - pit excavation layer by layer and step by step was used, i. e. the method that makes the surface of excavation have no stress, when the elements were excavated gradually in period of construction. at this process, the state of soil is unloading, the laws of stress field and displacement field with the depth of excavation were studied. based on the obtained stress field and displacement field after the excavation was completed, by using of the newly increased filling - elements " gravity and the grinding force, the simulation of the construction of body of the culvert and foundation - pit ' s filling layer by layer had also been done in this dissertation

    用有限元法模擬分析涵基坑開時,採用分層、分步模擬開過程的方法,即將計算域內單元分層「去」 ,使開表面成為無應力表面的方法,分析土體在卸載狀態時的應力場和位移場隨開度的變化規律;在體施工后,回填土體時,據開完成時的應力場、位移場,通過逐級增加計算域內的單元數目,施加每級新增加單元的自重荷載,利用有限元法模擬基坑及上覆土體分層填築的施工過程,這不僅反映土體處于再加載應力狀態時,填土受力及變形的一般規律,而且這種將地基? ?涵? ?土體作為一個統一整體進行模擬的方法,量化了三者之間的相互作用關系。
  8. I have already observ d how i brought all my goods into this pale, and into the cave which i had made behind me : but i must observe too, that at first this was a confus d heap of goods, which as they lay in no order, so they took up all my place, i had no room to turn my self ; so i set my self to enlarge my cave and works farther into the earth, for it was a loose sandy rock, which yielded easily to the labour i bestow d on it ; and so when i found i was pretty safe as to beasts of prey, i work d side - ways to the right hand into the rock, and then turning to the right again, work d quite out and made me a door to come out, on the out - side of my ale or fortification

    現在我必須補充說一下,就是那些東西起初都雜亂無章地堆在那裡,以致占滿了住所,弄得我連轉身的餘地都沒有。於是我開始擴大和。好在巖石質地是一種很松的沙石,很容易,當我覺得圍墻已加固得足以防禦猛獸的襲擊時,我便向巖壁右邊去,然後再轉向右面,直至把巖壁穿,通到圍墻外面,做成了一個可供出入的門。
  9. Considering the above reason, this paper, by the action - reaction model in the design theory of underground structure, and by fem, establishes an analysis frame based on the characteristics of the cavern - pile method. the influences of tunnel span, height, overburden depth, and excavation sequence on the cavern - pile method are discussed by a careful interpretation of the modeling result. in addition, a comparison of surface settlement and engineering quantity of the cavern - pile method with those of the binocular excavation method, bench cut method and cd method are made in the paper

    本研究主要是依據目前地下結構設計及計算理論中的地層結構法,以有限單元法為計算手段,針對淺埋暗樁法的自身特點確定了模擬分析方案,並通過計算結果的處理和分析指出了室跨度、高度、埋、施工工序等因素對淺埋暗樁法的影響規律。
  10. Red squirrels disappear inside trees, bears use caves, frogs go deep under the mud, and many other animals dig tunnels in the earth

    紅松鼠藏到樹裏面去了;熊利用穴'青蛙鉆入泥土的處.而許多其它的動物,則在地里坑道。
  11. Secondly, grounded on the study of the distribution of the high external waterpressure and high geostress and the characteristic of the rock in engineering area, the paper built the elastoplastic fem numerical simulation model, and think over the procedure in tunnels excavation and the history of work of water load, and then get the relations between the different tunnels diameter, different permeability coefficient and depth of the grouting rock and the deformation, stress distribution and plastic range of the surrounding rock and support structure. finally, according to the modern design theory of tunnels construction, the particular design of country rock reinforcement and support structure are researched and presented for diversion tunnels

    接著,本文在入研究工程區高外水壓力及高地應力分佈規律及巖體特性的基礎上,建立起高地應力、高外水壓力作用下隧圍巖結構非線性有限元模擬計算模型,然後考慮隧的開過程、水荷載的作用歷史,通過計算分析得出了不同徑、不同的灌漿圈滲透系數和不同的灌漿圈度以及不同開過程與圍巖及支護結構的應力、位移和塑性區的關系。
  12. The construction of the multiple - arch tunnel is deeply related to the form of center partition, the tunnel ' s section and excavation method etc. the change regularities of stress field caused by excavation are studied by 4 multiple - arch unlined tunnel model tests. the difference in lining for various multiple - arch sections is analyzed and the mechanics characteristics of center partition is discussed. then, a reasonable construction method for multiple - arch tunnel and a better section are put forward

    通過4個連拱模型試驗,研究了連拱毛引起的應力場變化規律,對不同的連拱斷面的襯砌受力差異進行了入的分析,同時對中隔墻的受力特點也作了探討,提出了合理的連拱隧道構築方法及優化斷面圖。
  13. Under these circumstances, the underground caverns with characteristics of large scale and complex spatial arrangement are located close in finite underground space. thus the excavation effect and the interaction among different caverns during the process of underground projects construction are needed to be studied thoroughly which affect the cost of construction and production of power station

    規模龐大、空間組成復雜的室群布置在有限的地下空間內,其開效應以及不同室之間的相互影響,將關繫到整個水電站工程的建設成本和運營效益,因此是一個值得入研究的問題。
  14. In the bible it is also said, the road to heaven is so thin like a razor s blade. it s the separation between heaven and earth. some indian sutras, some indian bibles say, the difference between knowledge and the ignorant is one hair apart.

    在他們一起工作,的這幾年裡,男孩已經被這個他所要殺的人的優點感動,他本該是男孩昔日的敵人,而現在他完全改變了,他只想到好的肯定的事,並且一心一意奉獻犧牲。
  15. The main results can be taken as the basic data and the theoretical proofs to evaluate cavities stability and guide the correct excavation. ( 5 ) relating closely to the engineering geological condition and the project design of the underground cavities in the right side bank of xiluodu, the effects of rock mass qualities, initial geo - stress f

    ( 5 )密切結合溪洛渡右岸地下廠房室群的工程地質條件和工程設計,首次入地討論了圍巖質量、初始地應力場、開順序對大型地下室群圍巖穩定性的影響。
分享友人