挖漿 的英文怎麼說

中文拼音 [jiāng]
挖漿 英文
digging of pulp
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • 漿 : 漿同「糨」
  1. Based on the analysis of the characteristics of the raw mix slurry preparing process in alumina sintering production process, firstly, a mechanism model based on material balance principle was established as the master - rule model for the quality prediction ; secondly, considering the problem that the alkali liquor composition was unstable and its real - time measurement was difficult, a nn ( neural networks ) prediction model for the prediction of the alkali liquor composition was set up and nesting - integrated with the mechanism model ; finally, using the gray theory for the information mining from the errors of the mechanism model, a gm ( 1, 1 ) compensation model was put forward and parallel - connection - integrated with the mechanism model, achieving a raw mix slurry quality prediction model

    摘要針對燒結法氧化鋁生產過程中生料漿配料工藝的特點,根據物料平衡的原理建立機理模型,作為生料漿質量預測的主規律模型;針對堿液成分波動大且難以實時檢測的問題,對堿液成分含量建立了神經網路預測模型,並和機理模型進行嵌套集成;利用灰色理論對機理模型的偏差數據進行信息掘,建立了gm ( 1 , 1 )補償模型,並與機理模型進行並聯集成,獲得生料漿質量預測模型。
  2. A brief introduction is given to the treatment of the zeya dam foundation, principles of seepage control and design of the concrete face rockfill dam of the zeya reservoir. as for the excavation of the sand - gravel zones, except the toe slab and its 1 / 9 bottom width down stream, the alluvial layers are excavated to the micro - weathered rocks, while the other sections remain unexcavated. regarding to the treatment of the fracture zones, concrete filling is used for the toe slabs and semi - permeable materials are used for other section. according to the construction characteristics, a filter is placed in the down stream embankment foot. to improve the integrity of the dam foundation and anti - seepage capability consolidation grouting and curtain grouting are adopted. as a result safety, economic benefit, convenience in construction and good performace are achieved

    簡要論述澤雅水庫面板堆石壩壩基處理和防滲的原則及設計要點.趾板基礎和堆石體各區砂礫石基礎開,除趾板與其下游1 / 9底寬范圍以及壩腳除沖積層至弱風化(局部微風化)基巖外,其餘部分均予以保留.斷層破碎帶處理,趾板部位採用混凝土塞,其它部位採用半透水料置換,並根據本工程特點在下游壩腳加設了反濾層.為提高壩基的整體性和防滲性能,對趾板進行了固結和帷幕灌漿.達到了安全、經濟、便於施工的目的,運行情況良好,可為面板堆石壩的設計和研究提供參考與借鑒
  3. As one type of dredging equipment, a cutter suction dredger can dredge material and fill land by continually cutting soil and transporting slurry to the disposal area

    絞吸式泥船作為一種疏浚設備,單船作業可疏浚和吹填。它能連續地掘和輸送泥漿,因而具有廣泛的適用性和經濟性。
  4. Application of complex grouting method in man - dig pile construction

    漿在人工孔樁事故處理中的應用
  5. In the excavating process of the left bank, such methods as concrete embolism, consolidation grouting > cable strengthening and bailing shoud be used when the fault f5 is round. on the right bank, the system anchorage and bailing methods shoud be used. it is surgested that the prestressed cable shoud be used to deal with the deterministic blocks. and the prestressed anchor to the undeterministic blocks

    左岸拱肩槽邊坡在開施工至斷層f5附近時,要使用混凝土栓塞、固結灌漿、錨索加固及排水等措施以防止巖體失穩。右岸拱肩槽邊坡開過程中要採取系統錨固及排水防滲等措施,以防止個別潛在不穩定的邊坡失穩。
  6. It was " fancy starch " that robbed them of their hard - won minutes

    他們空心思節省下來的分分秒秒都叫這「花式漿洗」吞食了。
  7. The result shows that the trench wall failure at shallow depth is the major failure mode of the slurry - supported excavation, and that the length of the excavated trenches and the difference between the slurry head and the water level are the key parameters controlling the stability of the slurry - supported excavation

    結果表明,淺層槽壁失穩是泥漿護壁開的主要失穩型式,開槽段的長度和泥漿液面與地下水位面的高差是控制泥漿護壁開穩定性的關鍵參數。
  8. In situ test and construction of two - shot grouting for waterproof of man - hole - pile

    綜合注漿法在人1孔樁施工中的應用
  9. This text digs a mire operation from the exaltation for time, type to dig a mire ship yield

    摘要文中從提高泥運轉時間、提高流速、提高泥漿濃度三個方面論述了提高絞吸式泥船產量的方法。
  10. Because a cutter suction dredger can continuously excavate and transport the dredged material, it has extensive adaptability and good economy

    絞吸式泥船具有連續掘和輸送泥漿的特點,因而具有廣泛的實用性和較高的經濟性。
  11. In the working of cutter suction dredger, the slurry is transported by solid - liquid two - phase flow that is consisted of sand and water. this method cannot carry slurry too long, so some projects cannot be taken on

    在絞吸式泥船疏浚作業中,泥漿是由泥沙和水組成的固-液兩相流得以輸送的,往往因排泥距離不長而使許多工程無法承擔。
  12. Based on field test and theoretical analysis, the mechanism of instability of slurry - supported excavations was investigated from angles of soil arching effect, time - dependent effect, overall stability, and local stability

    同時,根據現場試驗和理論研究成果,從土拱效應、時間效應、整體穩定性和局部穩定性等方面分析了泥漿護壁開的失穩機理。
  13. Based on the results of vertical static loading test and stress test for longhole bored pile in loess foundation, by analysing the transferring law of axial force and the action of lateral friction resistance and bottom resistance, the paper discusses the influences of two types of holing technology on bearing capacity behavior

    本文通過黃土地基中旋鉆孔灌注長樁和泥漿護壁鉆孔灌注長樁靜載荷試驗和樁身應力的測試,分析了黃土地基中兩種成孔工藝鉆孔灌注長樁樁身軸力的傳遞規律、樁側阻力及樁端阻力的發揮性狀,探討了兩種成孔工藝對鉆孔灌注長樁承載力的影響。
  14. By analyzing the developing situation of the trenchless technology at home and abroad, and combining the characteristics of the modern computer multimedia technology, the article brings forward that it is necessary to design the multimedia training system on horizontal directional drilling. then base on introducing the content of horizontal directional, the article puts forward the scheme of overall, engineering reconnaissance, slurry knowledge, construction principles, construction process, construction equipment, construction design model, the function, the designing technology, the applying forefound and the mending plan of the the multimedia training system on horizontal directional drilling

    本論文從國內外非開技術的發展情況分析,以及結合現代計算機多媒體技術的特性,提出開發「水平定向鋪管技術多媒體培訓系統」的必要性;並在簡略介紹水平定向鉆機鋪管技術的基礎上,給出開發「水平定向鋪管技術多媒體培訓系統」的「總論」 、 「施工前工程勘測」 、 「泥漿處理」 、 「施工原理」 、 「施工工藝」 、 「施工機具」和「施工設計」七大模塊的具體設計方案、實現的主要功能和系統開發的關鍵技術,最後分析了該系統的應用前景和改進方向。
  15. On the basis of repeated analyses and verifications, the construction techniques of shed - pipe grouting etc. are adopted therein, with which the tunneling in low - cemented sandy soil is successfully carried out under the condition of higher ground water level, and then both the design and construction are demonstrated to be reasonable and reliable through the actual water delivery operation

    在反復分析論證的基礎上通過採用注漿管棚等施工技術,成功地在高地下水位低膠結度的砂性土中開隧洞,實際過水應用表明設計施工是合理可靠的。
  16. Secondly, in view of the limitation and shortage of traditional simulation of finite element approaches for bolt, a new composite grouted bolt element including nonlinear contacting relation will be built based on the above study of the mechanics mechanism of fully grouted bolt. then, an elastic - plastic finite element program will be developed for the analyses of tunnel stability, in which the composite grouted bolt element and nonlinear finite element analysis method will be used ; the patterns and the affect of main design parameters on the support effect of bolt will be analysed using the program, and conclusions of guidance importance for tunnel support design will be drawn. finally, simulation compution for the excavation and support of a highway tunnel will be made out using the above production, and the method of application of the program will be discussed ; analysis of the deformation, stress and distribution of plastic range will be done, and rational support plan will be worked out, which is of guidance importance for tunnel support design and the thery and technique of fully grouted bolt used in tunneling will be perfected further

    首先,本文在綜合分析隧道穩定性影響因素及失穩破壞模式的基礎上,對全長粘結式砂漿錨桿作用力學機理進行了深入研究,為全長粘結式砂漿錨桿的有限元模擬分析奠定了基礎;其次,針對傳統錨桿有限元模擬方法的局限性與不足,在上述全長粘結式砂漿錨桿作用力學機理研究基礎上,建立出能反映界面非線性粘結的新型復合砂漿錨桿有限單元模型;然後,運用上述復合砂漿錨桿單元模型,引進非線性有限元分析手段,開發了隧道支護穩定性分析的有限元程序,並就全長粘結式砂漿錨桿的型式與設計參數對支護效果的影響進行了深入探討,得到了對隧道支護設計具有指導意義的結論;最後,運用本文研究成果對某公路隧道工程實例進行了開與支護的模擬計算,探討了其應用方法,並就隧道變形與應力及塑性區分佈規律進行了分析,從而提出了合理的支護方案,為隧道支護設計提供了參考依據,完善了隧道全長粘結式砂漿錨桿支護的理論與方法。
  17. Applying high pressure grouting in concrete pile digged by hand

    樁端壓力注漿在人工孔灌注樁中的應用
  18. Application of pile - end pressure grouting in artificial hole - digging grouting pile

    樁端壓力注漿在人工孔灌注樁中的應用
  19. In this thesis, analysis of whole performance and interior mechanism of plain soil slope and soil nailing wall with flag finite difference program has been carried out. at the same time, the impacts on the internal force distribution of soil nailing and the deformation of soil nailing wall of many factors, including the connection between face shield and soil nailing, the friction decline between soil nailing and soil, the shear force & bending moment resistance of soil nailing, the cement crack in soil nailing, face shield, excavation, the obliquity of slope, and so on are studied in this thesis

    本文通過flac有限差分程序,分析了素土基坑和土釘墻體的整體性能和內在機理,研究了土釘和面層的連接變化、土釘表面性能的下降、土釘的橫向抗剪抗彎作用、土釘漿體的開裂、面層的有無、基坑的開過程、基坑放坡角度等因素對土釘內力分佈和土釘墻變形的影響。
  20. Secondly, grounded on the study of the distribution of the high external waterpressure and high geostress and the characteristic of the rock in engineering area, the paper built the elastoplastic fem numerical simulation model, and think over the procedure in tunnels excavation and the history of work of water load, and then get the relations between the different tunnels diameter, different permeability coefficient and depth of the grouting rock and the deformation, stress distribution and plastic range of the surrounding rock and support structure. finally, according to the modern design theory of tunnels construction, the particular design of country rock reinforcement and support structure are researched and presented for diversion tunnels

    接著,本文在深入研究工程區高外水壓力及高地應力分佈規律及巖體特性的基礎上,建立起高地應力、高外水壓力作用下隧洞圍巖結構非線性有限元模擬計算模型,然後考慮隧洞的開過程、水荷載的作用歷史,通過計算分析得出了不同洞徑、不同的灌漿圈滲透系數和不同的灌漿圈深度以及不同開過程與圍巖及支護結構的應力、位移和塑性區的關系。
分享友人