挖隧道前進 的英文怎麼說

中文拼音 [suìdàoqiánjìn]
挖隧道前進 英文
tunnel
  • : 動詞(用工具或手從物體的表面向里掘取) dig; excavate; scoop
  • : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ名詞1 (在正面的) front 2 (次序在先的) first; top 3 (過去的; 較早的) ago; before; preceding...
  • : 進構詞成分。
  • 隧道 : tunnel; tunneling; tunnelling; chunnel; drive
  1. The tunneling method for the landslide section at the entrance of heishuigou tunnel ( for the internal circle construction road in the construction site of guandi hydropower station ) is presented herein ; in which the tunneling method and the effects of both the pilot and the system supportings on the entrance tunneling into the landslide body are described as well

    摘要介紹了官地水電站場內環線路黑水河溝口滑坡體的施工方法,包括開的施工方法以及超與系統支護對在滑坡體上洞所發揮的作用。
  2. To move or progress by or as if by digging or tunneling

    洞或打一樣移動或
  3. The railway tunnels along canton road and underneath the former marine police headquarters will be constructed by the bored tunnelling method to minimize impacts on the adjacent environment. other than the excavation works that need to be carried out within the works site near the canton road government offices for the new station and introducing the tunnel boring machine, the works that need to be carried out at the street level along canton road will be small in scale so as to minimize the impact on the environment in the neighbourhood

    在廣東沿路和水警總部地底的鐵路,會以鉆方式建造,除了在廣東政府合署現址附近的工地內開地面以便興建新車站及引機外,需要在廣東路面行的工程規模會很少,以便盡量減少對毗鄰環境的影響。
  4. Construction of flat tunnel of large span at extra - shallow depth must be conducted on the principle that advance grouting should be strictly performed before excavation and length of pull at one time should be short, together with reinforced support, immediate closing and constant monitoring and surveying. that preceding pilot tunnels, large - volume excavation divided into small ones, excavation of flank before that of center, upper before lower, arch before wall etc is a good method which could effectively reduce surface subsidence and its adverse effect on adjacent buildings, in addition, some other measures are also taken to lessen blast - induced vibration in the ground and surrounding structures. in a word, all means and steps mentioned above have already proved effective and practicable in practice

    軟弱大跨超淺埋扁平必須按「管超,嚴注漿,多分部、短開、強支護、快封閉,勤量測」的施工原則行施工,採用「眼鏡超,化大為小,先側后中,先上後下,先拱后墻」的施工方法控制地表沉降和對周邊建築物的影響;採用「多分部,化大為小,短尺,密布眼,弱裝藥,設減振槽」 ,控制爆破振動,經過實踐證明,這些方法都是行之有效的。
  5. At present, the level of mechanization and automation of tunnel boring machines ( tbm ) has been improved significantly, and tbms can be designed to excavate tunnels with different shapes under different geological conditions

    摘要目機的機械化及自動化水平得到了很大提高,機可以開不同的地質條件下各種形狀的
分享友人