振動試驗臺 的英文怎麼說

中文拼音 [zhèndòngshìyàntái]
振動試驗臺 英文
exerciser
  • : 動詞1. (搖動; 揮動) shake; flap; wield 2. (奮起) brace up; rise with force and spirit
  • : 名詞(古代占卜用的器具) astrolabe
  • : 動詞1. (察看; 查考) examine; check; test 2. (產生預期的效果) prove effective; produce the expected result
  • : 臺名詞(指臺州) short for taizhou (in zhejiang province)
  • 振動 : vibrate; vibration; vibrance; vibrancy; vibra; vibes; shaking; rumble; jitter; chatter; sway; jar...
  • 試驗 : trial; experiment; test
  1. Electrodynamic horizontal vibration generator for testing

    水平振動試驗臺
  2. Verification regulation of electrodynamic vibration generator system for testing

    振動試驗臺檢定規程
  3. Verification regulation of hydraulic vibration generater system

    液壓式振動試驗臺檢定規程
  4. Verification regulation of mechanical vibration generator for testing

    機械式振動試驗臺檢定規程
  5. Vibration test table

    振動試驗臺
  6. Vibration test rig

    振動試驗臺
  7. The dropping test table, high temperature test cabinet, vibration test table and impacting table, which can simulate many dynamic test of frequency of 5 60hzdisplacement and amplitude of 5 mm

    100 %等多種溫度條件,跌落高溫振動試驗臺沖擊等均有中國國營西北機械廠生產,可模擬頻率5
  8. But there has been no track spectrum that can reflect the real condition of chinese rail for a long time. many organizations have put forward some conclusions of track spectrum, but there is no unite conclusion at present in china. power calculation of locomotive and experiment on the rolling and vibration test - bed have to adopt foreign track spectrum

    但長期以來沒有能反映我國實際軌道狀況的軌道譜,雖然國內很多機構都已提出一些軌道譜的結論,但尚沒有統一性的結論提出,機車車輛力學計算和滾振動試驗臺均只有採用國外軌道譜。
  9. The method using wavelet packet analysis is proposed to extract fault information from vibration signal obtained from testing jig of tilting train. the vector comprised of the energy of signal in all spectrum bands is input to a feed forward neural network

    利用小波包分析,將擺式車體上採集到的加速度信號分解在相互獨立的頻帶之p內,各頻帶內的能量值形成一個向量,將其作為神經網路的輸入特徵向量, 。
  10. In this paper, according to diesel two - stage vibration isolation test - bed, the experiment investigation based on normal fuzzy active control is made

    本文還針對柴油機雙層隔模擬架,進行了常規模糊主控制方法的研究。
  11. Test equipment for generating vibration - methods of describing characteristics of auxiliary tables for test equipment for generating vibration

    設備.第2部分:輔助特性規定方法
  12. Currently, the large space vehicle ’ s vibration test usually adopted dual - shaker system, the electric current phase synchronous controller is one of the equipments importantly in the system. the existing control equipments make use of tri - tek704d controller, and the current feedback in - phase control method

    目前,我國大型航天器環境採用多同步激勵的系統來完成,電流相位/幅值同步控制器是並聯雙同步控制系統中重要的組成設備之一。
  13. 2. when the test is going along, the connection between the output of the test system and computer is broke off while the state of the test system is changing, so it is difficult to ensure the same precision of stochastic waveform reappearance of the test system output

    進入運行后,計算機輸出的控制信號與設備響應之間的關系便成了開環,由於或被對象的狀態在過程中會發生變化,所以難以保證被控系統按同樣的精度再現給定的隨機物理量。
  14. In order to satisfy the customer ’ s more strict command to the inertia brake, changsha sanzhan inertia brake co., ltd. and hunan university allied to develop a set of equipment of inertia brake test rigs, which can test and research the property of starting torque, braking torque, vibration of axis and so on to all kinds of models and specification of inertia brake to improve the property and quality of product

    為了滿足用戶對慣性制器產品提出的更高要求,長沙三占慣性制有限公司和湖南大學合作開發一套慣性制裝置,對各種型號及規格的慣性制器的起力矩、制力矩、軸向等特性進行測和研究,以改進產品性能和提高產品質量。
  15. The main job proceeded : collecting the data through investigation, summery the chracteristic of the quiver of the imported 300mw set to solve the quiver problem of the imported 300mw set, basing on the # 1, # 2 sets of the jingyuan ins corp and choosing the effiction of the aggravated plane, the changed stiffness of the # 4 bearing and # 7 bearing obtained the test result which can be used to be the conductor to solve the too bad quiver problem of # 5, # 6 axletree tiles in the # 1, # 2 sets of the jingyuan ins corp. outcome of the paper : analyse and sum up the main reason of the imported 300mw set ' s quiver through see much literature

    針對靖遠第二發電有限責任公司# 1 、 # 2機組的具體情況,選擇各加重平面對軸系的影響、 # 4軸承變剛度、 # 7軸承變剛度變標高等項目,在300mw軸系模擬上進行了模擬,獲取了大量的數據,得出了具有實際指導意義的結論;針對靖遠第二發電有限責任公司# 1 、 # 2機組發電機# 5 、 # 6軸承瓦過大的問題,通過剛度調整的方法,較好的解決了問題。通過本文研究取得了如下成果:在閱讀了大量文獻資料的基礎上,對國內引進型300mw火電機組的特徵、的主要原因進行了分析和總結。
  16. An experimental apparatus of falling film absorption in a vacillating is set up to check the reliability of theoretical model and to have a deep understanding of heat and transfer of practical falling film absorption ; falling film absorption with tfe / nmp solution in a static vertical tube and that in a vacillating tube are investigated respectively

    證理論模型的可靠性並進一步深入了解實際搖擺降膜吸收過程中熱、質傳遞規律,自建了搖擺單管吸收;分別對靜止和搖擺狀態下tfe / nmp垂直管內降膜吸收進行實研究。
  17. Using this kind of bearing, we finish the spin test at 67000rpm. also, we add the controlled passive magnetic damper ( cpmd ) to the rotor tester, which is used to reduce the vibration the main achievements are as follows : 1. we analyzed dynamic characteristic of nr15 rotor with long shaft, and get its critical - speed and response to unbalanced mass

    本課題的研究,我們做了以下工作: 1對nr15帶柄轉子的力學特性做了分析,得到了不同剛度支承下,轉子各階臨界轉速及相應幅參數;並在原有超速基礎上,通過設計上、下彈性阻尼支承結構,實現了nr15帶柄轉子67000rpm的超速
  18. The existing problems of eve are also analyzed, the new developments, such as flexible clamp, simulation of the dynamic boundary conditions of a specimen, modal parameter identification by vibration shaker, modal transformation of structure are introduced briefly

    分析環境當前存在的問題,對柔性夾具、力學邊界條件的工程實現、模態參數識別、結構的模態轉換等新進展做簡要介紹。
  19. According to the characteristics of the two - stage vibration isolation test - bed, the control system model is made, and a fuzzy controller is designed, and the fuzzy control rules for the active control are introduced, and the simulation investigation of the two - stage vibration isolation test - bed in the vertical is effective to periodic and diesel vibration signal

    針對雙層隔模擬架的特點,建立了控制系統數學模型,設計了一種模糊控制器,提出適用於控制的模糊控制規則,進行了雙層隔模擬實架垂直方向的模擬研究。
  20. We equip the following machines for the environmental testing and the reliability test : test box with high and low temperature, test box with high temperature, test box with invariableness temperature and humidity, salt - spray test box, vibrant and impactive test machine, tensile test machine, frequency tester and scanner, oscillograph, oven with invariableness temperature etc. pic the 3d machine

    環境可靠性測等方面配置有以下儀器設備:高低溫箱高溫恆溫箱恆定濕熱箱鹽霧腐蝕箱沖擊拉力機諧頻率f0快速測儀揚聲器f0快速測儀音頻掃頻信號發生器示波器電熱恆溫乾燥箱等。
分享友人