排水管 的英文怎麼說

中文拼音 [bèishuǐguǎn]
排水管 英文
drain-pipe; pipe weep; exhaust water pipe; fall tube; scupper pipe; scupper shoot; off-take pipe
  • : 排構詞成分。
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (管子) pipe; tube 2 (吹奏的樂器) wind musical instrument 3 (形狀似管的電器件) valve;...
  • 排水 : drain off water; drain away water; dewatering
  1. Crossing canalization for improving capacity of roads

    上海市排水管道滲入量調查與修復決策
  2. Cast iron drainage pipes and fittings without sockets

    無承口的鑄鐵排水管
  3. The cat burglar must have climbed up that drainpipe

    飛賊一定是從排水管爬上去的。
  4. It was a small trick to slide down the drainpipe.

    滑下排水管就不過是小玩藝罷了。
  5. The drainpipe conducts excess water from the well

    排水管把多餘的從井中出。
  6. Bad, nauseating smells coming from drainpipes into apartments

    公寓排水管道發出惡臭。
  7. Water escaped rapidly from the drainpipe

    排水管中迅速流出。
  8. I heard you climb the drainpipe

    我聽到你爬排水管的聲音了。
  9. Unplasticized polyvinyl chloride drainpipes ; dimesions, requirements, testing

    無增塑劑聚氯乙烯硬質聚氯乙烯排水管.尺寸要求
  10. Several house drains, usually of 10 cm internal diameter and made of fired clay, flow into the street sewer which is of 15 23 cm diameter

    住宅的排水管道通常用若干條內徑為10厘米由燒結粘土成制的道,通往徑15 23厘米的街道污
  11. ( 2 ) drainage way of toilet and kitchen of residential building in this chapter, the necessity of reformation of drainage way of toilet and kitchen are presented. drainage way with floor blocked up, drainage with back outlet sanitary facilities and drainage with floor descended are discussed and summarized

    ( 2 )住宅衛生間、廚房方式提出合理解決衛生間、廚房方式勢在必行,對墊高衛生間地面敷設排水管方式、後方式和下沉衛生間樓面敷設排水管方式進行探討和總結。
  12. He ' s trying to clear a drain when he slipped and fell into 70 gallons of the fuggy goo

    他本試圖去清理排水管時滑入70加侖的粘性物質中。
  13. Gis - based urban drainage pipe network information system

    的城市排水管網信息系統
  14. This research mainly is nonwoven using the hot blast, sap, and pvc pipe to complex the water absorbing composite pipe, when applies to the under - drainage tubing, but effectiveness achieves the water resources the application

    摘要本研究主要是利用熱風不織布及吸性高分子棉網與聚氯乙烯件復合而成的吸排水管件,應用於地下排水管材時,可有效率的達到資源的應用。
  15. To comply with monitor and inspection of the quarterly, half yearly, and yearly inspection and remedy of rooftop, roof space, deck, ground, basement, down pipe, sanitary pipe, air vent, cement & concrete, structural, foundation, beams, ironmongery and all related

    對屋頂,地板,地下室,下道,排水管氣口,泥和混凝土,地基等相關的結構設備進行每季度,每半年,每年的檢查和修理。
  16. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防工程、有防要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣線、給排水管道、設備安裝為2年; 5 、裝修工程為2年。
  17. Drain pipes and percolation pipes - general requirements

    排水管道和滲濾道.一般要求
  18. With a 576 * 768 pixes cod, we have got 10 " 5m accuracy in measurement of the deformation of soil specimen

    同時,用另外一臺ccd圖像傳感器測量三軸實驗中的排水管讀數變化量。
  19. Application and popularization of upvc drainage pipe

    排水管在工程中的應用與推廣
  20. Adopting the construction scheme which combines iron - frame moulded board with unsegragating concrete underwater and encircling steel hoop on glass fiber reinforced plastic mortar pipes, the difficulty in construction of outfall in riprap mound within a short period period is overcome

    摘要通過採用鋼框模板結合下不離析混凝土以及對玻璃鋼夾砂排水管採用抱箍的施工方案,成功解決了在較短工期內完成拋石棱體中出口施工難度大的問題。
分享友人