排水綱 的英文怎麼說
中文拼音 [bèishuǐgāng]
排水綱
英文
drainage scheme-
Fc approved a commitment to upgrade part of 6gb to category a at an estimated cost of $ 104. 1 million in mod prices for the employment of consultants to carry out site investigation, schematic proposal, detailed design, contract documentation, environmental impact assessment and drainage impact assessment for the proposed expansion of kiosks and other facilities at lmc boundary crossing
財務委員會批準開立承擔額,把6gb號工程計劃的一部分提升為甲級;按付款當日價格計算,估計費用為1億410萬元,用以委聘顧問就建議擴建落馬洲跨界通道檢查亭及其他設施的計劃進行地盤勘測工作、制訂建議計劃大綱、進行詳細設計、擬備合約文件,以及進行環境影響評估和排水影響評估。Pwsc endorsed a commitment to upgrade part of 6gb to category a at an estimated cost of $ 104. 1 million in money - of - the - day ( mod ) prices for the employment of consultants to carry out site investigation, schematic proposal, detailed design, contract documentation, environmental impact assessment and drainage impact assessment for the proposed expansion of kiosks and other facilities at lok ma chau ( lmc ) boundary crossing
工務小組委員會通過開立承擔額,把6gb號工程計劃的一部分提升為甲級;按付款當日價格計算,估計費用為1億410萬元,用以委聘顧問就建議擴建落馬洲跨界通道檢查亭及其他設施的計劃進行地盤勘測工作、制訂建議計劃大綱、進行詳細設計、擬備合約文件,以及進行環境影響評估和排水影響評估。Temperature process lines with tidal cycles of multi engineering conditions of characteristic sections are obtained, the relationship between temperature distribution and velocity field is established, the inner mechanism change of temperature process lines is investigated, the interrelation between water intake and outlet is analyzed, the relation between the ratio of dimensionless temperature rise span of the plant intake and the ratio of river discharge volume and plant cooling water intake volume is obtained
得到了特徵斷面多種工況隨潮周期變化的溫度過程線,建立了溫度場與流速場的相關關系,研究了溫度過程線的變化機理,分析了取排水口對溫度場的相互影響關系,探討了無量綱溫升時長比與無量綱來取流量比的相關關系。
分享友人