排水隧洞 的英文怎麼說
中文拼音 [bèishuǐsuìdòng]
排水隧洞
英文
sewer tunnel- 排 : 排構詞成分。
- 水 : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
- 隧 : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
- 洞 : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
- 排水 : drain off water; drain away water; dewatering
-
In addition, this paper carry out successfully the support design practice in the preceding excavation of 4km long exploratory tunnel. according to the thesis research results, the following conclusion can be drawn. if the grouting rock can possess sound anti - seepage capability and the liner structure can hold higher hydraulic permeability relatively, and if the adjoining rock can be made as primary load - bearing structure by construction measure, the stability of country rock and the safety of liner structure will be guaranteed
計算結果表明,如果能使錦屏工程引水隧洞灌漿圈圍巖具有較好的防滲性能,將高外水壓力控制在灌漿圈以外,再配合透水性相對較好的支護結構以及排水措施,使灌漿圈圍巖成為主要承載結構,並使襯砌結構和灌漿圈共同承載,是可以保證圍巖的穩定和支護結構安全的。Based on the moveable - bed model tests and some relative studies, it is found that the proposal reservoir for the hongshiyan hydropower station will be a heavy deposit reservoir, its sand - flushing sluice could not effectively de - silt and serious hidden - troubles exist in its diversion tunnel
摘要待建的紅石巖水電站水庫屬嚴重淤沙型水庫,通過動床水工模型試驗和有關研究分析發現,其沖沙閘排沙效果不理想,引水隧洞存在進沙嚴重的隱患。Selection on design scheme of flood - discharging and sediment - flushing tunnel of fenhe reservoir
汾河水庫泄洪排沙隧洞設計方案優選This article introduced the method of geological investigation of nanling tunnel karst disease, elaborated the tunnel engineering geology conditions, especially the karst water, the karst water power channel and the harm of karst water, and analyzed the cause that produced the karst disease
摘要南嶺隧道巖溶地下水活動造成地表坍陷、洞內泥砂淤塞等病害,其原因在於隧道施工遺留的導洞長期疏排巖溶水,採用地質測繪、物探、鉆探、水文地質試驗等綜合勘察方法,查明地下水通道位置、地下水流速、流向,針對病害原因,提出攔截、封團、疏排、填充等綜合整治方案。Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china
簡介黃河小浪底水利樞紐復雜的水文、地質條件以及龐大的工程規模.該樞紐設計有3條排沙洞,擔負著泄洪、排沙、調節徑流和保證進水口不被泥沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝土后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例( 2 ) the method of finite element discrete and optimal parameter back analysis is adopted. ( 3 ) concentrated on the question of high external water pressure of the deep - lying tunnel, the basic theory and method calculating external water pressure are systematically studied. ( 4 ) based on jinping cascade 2 hydropower station, numerical simulation rain infiltration of seepage field under different drainage pattern and grouting pattern are studied, also, the high external water pressure is analyzed and studied and some seepage control measures are put forward
( 2 )採用有限元離散?優化法進行參數的反演分析; ( 3 )針對深埋隧洞的高外水壓力問題,進一步分析和研究了襯砌水荷載及外水壓力的作用機理和計算方法; ( 4 )以錦屏二級水電站深埋長引水隧洞作為本文的主要研究對象,採用考慮降雨入滲滲流場分析的方法對排水方案和灌漿封堵方案不同情況下的滲流場的水頭分佈進行了數值模擬,並對其外水壓力進行了分析和研究,提出了滲流控制的具體措施。Tsing yi north coastal road, castle peak road and fan kam road ), drainage improvement works in yuen long and shenzhen river, site formation, slope works, landfill, reinforced fill works, reclamation, and work on rock tunnels and caverns
這些工務計劃包括了道路改善工程(例如青衣北岸道路、青山公路和粉錦公路) 、元朗及深圳河的排水渠改善工程、其他各類計劃的地盤平整及斜坡工程、填土及加筋填土工程、填海工程、開鑿巖石隧道及巖洞等。For this reason, this paper puts forward a guide wall should be increased to reduce the sand flowing into the tunnel and increase sand - flushing effectiveness of sand gate
為此,提出了增設一道導墻的方案,以減少引水隧洞進沙並提高沖沙閘排沙效果。分享友人